472
Views
22
CrossRef citations to date
0
Altmetric
Original Articles

Simultaneous supply and production planning

&
Pages 3795-3813 | Received 12 Jan 2009, Accepted 12 Apr 2010, Published online: 17 Sep 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Heechul Bae, Ilkyeong Moon & Wonyoung Yun. (2016) A time-varying lot sizes approach for the economic lot scheduling problem with returns. International Journal of Production Research 54:11, pages 3380-3396.
Read now
Zhixiang Chen & Bhaba R. Sarker. (2014) An integrated optimal inventory lot-sizing and vehicle-routing model for a multisupplier single-assembler system with JIT delivery. International Journal of Production Research 52:17, pages 5086-5114.
Read now
Heechul Bae, Ilkyeong Moon & Wonyoung Yun. (2014) Economic lot and supply scheduling problem: a time-varying lot sizes approach. International Journal of Production Research 52:8, pages 2422-2435.
Read now
Gary C. Lin, Andy Wu, Dah-Chuang Gong, Boray Huang & Wen-Na Ma. (2014) On a multi-product lot scheduling problem subject to an imperfect process with standby modules. International Journal of Production Research 52:8, pages 2243-2257.
Read now
J.K. Jha & Kripa Shanker. (2013) A coordinated two-phase approach for operational decisions with vehicle routing in a single-vendor multi-buyer system. International Journal of Production Research 51:5, pages 1426-1450.
Read now

Articles from other publishers (17)

Satya Prakash & Indrajit Mukherjee. (2023) A multi-objective solution framework for the assembly inventory routing problem considering supply risk and carbon offset policies. Journal of Cleaner Production 418, pages 138212.
Crossref
Dušan Hrabec, Lars Magnus Hvattum & Arild Hoff. (2022) The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis. International Journal of Production Economics 248, pages 108468.
Crossref
Budi Marpaung, Wisnu Aribowo, Suprayogi & Abdul Hakim Halim. (2021) An Integrated Inventory and Order Pickup Model in the MVSB System considering Capacities of Vendors. Journal of Physics: Conference Series 1858:1, pages 012016.
Crossref
Sana Prifita, Hasan Murat Afsar & Faicel Hnaien. (2021) Robust Disassembly Assembly Routing Problem With Returns Under Uncertain Yields. IFAC-PapersOnLine 54:2, pages 354-359.
Crossref
Yusuf Kuvvetli & Rızvan Erol. (2020) Coordination of production planning and distribution in closed-loop supply chains. Neural Computing and Applications 32:17, pages 13605-13623.
Crossref
Yusuf KUVVETLİ & Rızvan EROL. (2020) Kapalı Döngü Üretim Rotalama Problemi için Bir Karar Destek Sistemi ÖnerisiA Decision Support System Proposal for Closed Loop Production Routing Problem. Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi 35:2, pages 333-344.
Crossref
Masoud Chitsaz, Jean-François Cordeau & Raf Jans. (2019) A Unified Decomposition Matheuristic for Assembly, Production, and Inventory Routing. INFORMS Journal on Computing 31:1, pages 134-152.
Crossref
Sina Helming, Jens Buergin, Frank Bitte, Benjamin Haefner & Gisela Lanza. 2019. Advances in Production Research. Advances in Production Research 637 646 .
Manuel Díaz-Madroñero, Josefa Mula & David Peidro. (2017) A mathematical programming model for integrating production and procurement transport decisions. Applied Mathematical Modelling 52, pages 527-543.
Crossref
Singa Wang Chiu, Shin-Wei Chen, Chih-Kai Chang & Yuan-Shyi Peter Chiu. (2016) Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework. PLOS ONE 11:12, pages e0167511.
Crossref
Fanny Hein & Christian Almeder. (2016) Quantitative insights into the integrated supply vehicle routing and production planning problem. International Journal of Production Economics 177, pages 66-76.
Crossref
Herminia I. Calvete, Carmen Galé & Lorena Polo. 2016. Modeling and Simulation in Engineering, Economics and Management. Modeling and Simulation in Engineering, Economics and Management 92 103 .
Manuel Díaz-Madroñero, David Peidro & Josefa Mula. (2015) A review of tactical optimization models for integrated production and transport routing planning decisions. Computers & Industrial Engineering 88, pages 518-535.
Crossref
Heinrich Kuhn & Thomas Liske. (2014) An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy. Computers & Operations Research 51, pages 30-40.
Crossref
Martin Grunewald, Thomas Volling & Thomas S. Spengler. 2014. Supply Management Research. Supply Management Research 147 163 .
Sule Itir Satoglu & I. Ethem Sahin. (2012) Design of a just-in-time periodic material supply system for the assembly lines and an application in electronics industry. The International Journal of Advanced Manufacturing Technology 65:1-4, pages 319-332.
Crossref
Manuel Díaz-Madroñero, Josefa Mula & David Peidro. 2012. Decision Support Systems – Collaborative Models and Approaches in Real Environments. Decision Support Systems – Collaborative Models and Approaches in Real Environments 14 25 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.