311
Views
24
CrossRef citations to date
0
Altmetric
Original Articles

No-wait scheduling of a two-machine flow-shop to minimise the makespan under non-availability constraints and different release dates

, , , &
Pages 6273-6286 | Received 25 Feb 2010, Accepted 03 Sep 2010, Published online: 24 Jan 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Herbert Jodlbauer & Shailesh Tripathi. (2024) Due date quoting and rescheduling in a fixed production sequence. International Journal of Production Research 62:4, pages 1206-1220.
Read now
Debiao Li, Kejia Chen & Xiao Wang. (2017) Properties of two-machine no-wait flow-shop scheduling with a non-resumable unavailable interval. Journal of Industrial and Production Engineering 34:3, pages 232-238.
Read now
M. Rabiee, F. Jolai, H. Asefi, P. Fattahi & S. Lim. (2016) A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness. International Journal of Computer Integrated Manufacturing 29:9, pages 1007-1024.
Read now
Wei-Wei Cui, Zhiqiang Lu, Binghai Zhou, Chen Li & Xiaole Han. (2016) A hybrid genetic algorithm for non-permutation flow shop scheduling problems with unavailability constraints. International Journal of Computer Integrated Manufacturing 29:9, pages 944-961.
Read now
Huaping Chen, Shengchao Zhou, Xueping Li & Rui Xu. (2014) A hybrid differential evolution algorithm for a two-stage flow shop on batch processing machines with arbitrary release times and blocking. International Journal of Production Research 52:19, pages 5714-5734.
Read now
Xiaoge Zhang, Yong Deng, Felix T.S. Chan, Peida Xu, Sankaran Mahadevan & Yong Hu. (2013) IFSJSP: A novel methodology for the Job-Shop Scheduling Problem based on intuitionistic fuzzy sets. International Journal of Production Research 51:17, pages 5100-5119.
Read now
Behdin Vahedi Nouri, Parviz Fattahi & Reza Ramezanian. (2013) Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities. International Journal of Production Research 51:12, pages 3501-3515.
Read now
Shijin Wang & Ming Liu. (2013) A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning. International Journal of Production Research 51:3, pages 847-868.
Read now
M. Rabiee, M. Zandieh & A. Jafarian. (2012) Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics. International Journal of Production Research 50:24, pages 7428-7446.
Read now

Articles from other publishers (15)

Dana Marsetiya Utama, Sabila Zahra Umamy & Cynthia Novel Al-Imron. (2024) No-Wait Flow Shop scheduling problem: a systematic literature review and bibliometric analysis. RAIRO - Operations Research 58:2, pages 1281-1313.
Crossref
Mohamed Ali Rakrouki, Abeer Aljohani, Nawaf Alharbe, Abdelaziz Berrais & Talel Ladhari. (2023) Minimizing Total Tardiness in a Two-Machine Flowshop Scheduling Problem with Availability Constraints. Intelligent Automation & Soft Computing 35:1, pages 1119-1134.
Crossref
Ramazan BAŞAR & Orhan ENGİN. (2022) Beklemesiz Akış Tipi Çizelgeleme Problemlerinin Analizi ve Hibrit Dağınık Arama Yöntemi ile ÇözümüAnalysis of No-wait Flow Shop Scheduling Problems and Solving with Hybrid Scatter Search Method. Journal of Advanced Research in Natural and Applied Sciences 8:2, pages 293-308.
Crossref
Abdennour Azerine, Mourad Boudhar & Djamal Rebaine. (2021) A two-machine no-wait flow shop problem with two competing agents. Journal of Combinatorial Optimization 43:1, pages 168-199.
Crossref
Caio Paziani Tomazella & Marcelo Seido Nagano. (2020) A comprehensive review of Branch-and-Bound algorithms: Guidelines and directions for further research on the flowshop scheduling problem. Expert Systems with Applications 158, pages 113556.
Crossref
Kejia Chen, Debiao Li & Xiao Wang. (2020) Makespan Minimization in Two-Machine Flow-Shop Scheduling under No-wait and Deterministic Unavailable Interval Constraints. Journal of Systems Science and Systems Engineering 29:4, pages 400-411.
Crossref
Weiwei Cui & Biao Lu. (2020) A Bi-Objective Approach to Minimize Makespan and Energy Consumption in Flow Shops with Peak Demand Constraint. Sustainability 12:10, pages 4110.
Crossref
I. Ferretti & L.E. Zavanella. (2020) Batch Energy Scheduling Problem with no-wait/blocking Constraints for the general Flow-shop Problem. Procedia Manufacturing 42, pages 273-280.
Crossref
Andreas Hipp & Victor Fernandez-Viagas. (2019) Influence of no-wait and time lag constraints in flowshop scheduling systems. Influence of no-wait and time lag constraints in flowshop scheduling systems.
Issam Krimi, Rachid Benmansour, Saïd Hanafi & Nizar Elhachemi. (2019) Two-machine flow shop with synchronized periodic maintenance. RAIRO - Operations Research 53:1, pages 351-365.
Crossref
Assia Sadiqi, Ikram El Abbassi, Abdellah El Barkany & Ahmed El Biyaali. (2018) Joint Scheduling of Jobs and Variable Maintenance Activities in the Flowshop Sequencing Problems: Review, Classification and Opportunities. International Journal of Engineering Research in Africa 39, pages 170-190.
Crossref
Mohamed Labidi, Anis Kooli, Talel Ladhari, Anis Gharbi & Umar S. Suryahatmaja. (2018) A Computational Study of the Two-Machine No-Wait Flow Shop Scheduling Problem Subject to Unequal Release Dates and Non-Availability Constraints. IEEE Access 6, pages 16294-16304.
Crossref
Ali Allahverdi. (2016) A survey of scheduling problems with no-wait in process. European Journal of Operational Research 255:3, pages 665-686.
Crossref
Ke-jia Chen, Lian Jin & Xiao Wang. (2015) A two-machine flowshop with unavailability interval on the second machine. A two-machine flowshop with unavailability interval on the second machine.
Shanthi Muthuswamy, Mario C. Vélez-Gallego, Jairo Maya & Miguel Rojas-Santiago. (2012) Minimizing makespan in a two-machine no-wait flow shop with batch processing machines. The International Journal of Advanced Manufacturing Technology 63:1-4, pages 281-290.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.