791
Views
48
CrossRef citations to date
0
Altmetric
Original Articles

Jobshop lot streaming with routing flexibility, sequence-dependent setups, machine release dates and lag time

&
Pages 2331-2352 | Received 01 May 2010, Accepted 26 Aug 2010, Published online: 14 Jul 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

Herbert Jodlbauer & Shailesh Tripathi. (2024) Due date quoting and rescheduling in a fixed production sequence. International Journal of Production Research 62:4, pages 1206-1220.
Read now
Pinar Yunusoglu & Seyda Topaloglu Yildiz. (2023) Solving the flexible job shop scheduling and lot streaming problem with setup and transport resource constraints. International Journal of Systems Science: Operations & Logistics 10:1.
Read now
Fatemeh Daneshamooz, Parviz Fattahi & Seyed Mohammad Hassan Hosseini. (2022) Scheduling in a flexible job shop followed by some parallel assembly stations considering lot streaming. Engineering Optimization 54:4, pages 614-633.
Read now
Hadi Abdollahzadeh Sangroudi & Mehdi Ranjbar-Bourani. (2021) Solving a flexible job shop lot sizing problem with shared operations using a self-adaptive COA. International Journal of Production Research 59:2, pages 483-515.
Read now
Shasha Wang, Mary Kurz, Scott Jennings Mason & Eghbal Rashidi. (2019) Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups. International Journal of Production Research 57:22, pages 6893-6907.
Read now
G.Vijay Chakaravarthy, S. Marimuthu, S.G. Ponnambalam & G. Kanagaraj. (2014) Improved sheep flock heredity algorithm and artificial bee colony algorithm for scheduling m-machine flow shops lot streaming with equal size sub-lot problems. International Journal of Production Research 52:5, pages 1509-1527.
Read now
M. Cheng, N.J. Mukherjee & S.C. Sarin. (2013) A review of lot streaming. International Journal of Production Research 51:23-24, pages 7023-7046.
Read now
Yasemin Yavuz. (2013) Lot streaming with flexible process plans. International Journal of Production Research 51:17, pages 5055-5072.
Read now
Deming Lei & Xiuping Guo. (2013) Scheduling job shop with lot streaming and transportation through a modified artificial bee colony. International Journal of Production Research 51:16, pages 4930-4941.
Read now

Articles from other publishers (38)

Qingshan Gong, Junlin Li, Zhigang Jiang & Yan Wang. (2024) A hierarchical integration scheduling method for flexible job shop with green lot splitting. Engineering Applications of Artificial Intelligence 129, pages 107595.
Crossref
Zhifeng Liu, Jiming Zha, Jun Yan, Yueze Zhang, Tianzuo Zhao, Qiang Cheng & Chenyang Cheng. (2024) An improved genetic algorithm with an overlapping strategy for solving a combination of order batching and flexible job shop scheduling problem. Engineering Applications of Artificial Intelligence 127, pages 107321.
Crossref
Shrajal Gupta, Ajai Jain, Felix T. S. Chan & Rakesh Kumar Phanden. (2023) A study on simulation-based optimization of a stochastic flexible job shop scheduling undergoing preventive maintenance with sequence-dependent setup time. International Journal on Interactive Design and Manufacturing (IJIDeM).
Crossref
James C. Chen, Tzu-Li Chen, Yin-Yann Chen & Min-Yu Chung. (2023) Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry. Flexible Services and Manufacturing Journal.
Crossref
Lixin Cheng, Qiuhua Tang & Liping Zhang. (2023) Mathematical model and adaptive simulated annealing algorithm for mixed-model assembly job-shop scheduling with lot streaming. Journal of Manufacturing Systems 70, pages 484-500.
Crossref
Busra Tutumlu & Tugba Saraç. (2023) A MIP model and a hybrid genetic algorithm for flexible job-shop scheduling problem with job-splitting. Computers & Operations Research 155, pages 106222.
Crossref
Yunfan Yang, Yuchuan Song, Weifei Guo, Qi Lei, Aihong Sun & Lianghua Fan. (2023) Guided shuffled frog-leaping algorithm for flexible job shop scheduling problem with variable sublots and overlapping in operations. Computers & Industrial Engineering 180, pages 109209.
Crossref
Christian Klanke & Sebastian Engell. (2022) Scheduling and batching with evolutionary algorithms in simulation–optimization of an industrial formulation plant. Computers & Industrial Engineering 174, pages 108760.
Crossref
Libao Deng, Yuanzhu Di, Zhe Yang, Chunlei Li & Xianxin Mao. (2022) A Self-Adaptive Differential Evolution Algorithm Based on Model Transformation for Flexible Job-Shop Scheduling Problem with Lot Streaming. A Self-Adaptive Differential Evolution Algorithm Based on Model Transformation for Flexible Job-Shop Scheduling Problem with Lot Streaming.
Yibing Li, Zipeng Yang, Lei Wang, Hongtao Tang, Libo Sun & Shunsheng Guo. (2022) A hybrid imperialist competitive algorithm for energy-efficient flexible job shop scheduling problem with variable-size sublots. Computers & Industrial Engineering 172, pages 108641.
Crossref
Syeda M. Tahsien & Fantahun M. Defersha. (2022) Discriminating and Clustering Ordered Permutations Using Artificial Neural Networks: A Potential Application in ANN-Guided Genetic Algorithms. Applied Sciences 12:15, pages 7784.
Crossref
Danial Rooyani & Fantahun Defersha. (2022) A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming. Algorithms 15:7, pages 246.
Crossref
Xinxin He, Zhijian Wang, Yanfeng Li, Svetlana Khazhina, Wenhua Du, Junyuan Wang & Wenzhao Wang. (2022) Joint decision-making of parallel machine scheduling restricted in job-machine release time and preventive maintenance with remaining useful life constraints. Reliability Engineering & System Safety 222, pages 108429.
Crossref
Lele Li. (2022) Research on discrete intelligent workshop lot-streaming scheduling with variable sublots under engineer to order. Computers & Industrial Engineering 165, pages 107928.
Crossref
Vincent Boyer, Jobish Vallikavungal, Xavier Cantú Rodríguez & M. Angélica Salazar-Aguilar. (2021) The generalized flexible job shop scheduling problem. Computers & Industrial Engineering 160, pages 107542.
Crossref
Arianna Alfieri, Shuyu Zhou, Rosario Scatamacchia & Steef L. van de Velde. (2020) Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop. 4OR 19:2, pages 265-288.
Crossref
Chunjiang Zhang, Kaixin Wang, Qingji Ma, Xinyu Li & Liang Gao. (2021) A Discrete Grey Wolf Optimizer for Solving Flexible Job Shop Scheduling Problem with Lot-streaming. A Discrete Grey Wolf Optimizer for Solving Flexible Job Shop Scheduling Problem with Lot-streaming.
Yilun Wang & Qianwen Zhu. (2021) A Hybrid Genetic Algorithm for Flexible Job Shop Scheduling Problem With Sequence-Dependent Setup Times and Job Lag Times. IEEE Access 9, pages 104864-104873.
Crossref
Pedro Coelho & Cristovão Silva. (2021) Parallel Metaheuristics for Shop Scheduling: enabling Industry 4.0. Procedia Computer Science 180, pages 778-786.
Crossref
Jae-Ho Bae. (2020) Dispatching Rule based on Chromaticity and Color Sequence Priorities for the Gravure Printing Operation. Journal of Society of Korea Industrial and Systems Engineering 43:3, pages 10-20.
Crossref
Fantahun M. Defersha & Danial Rooyani. (2020) An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached/detached setup, machine release date and lag-time. Computers & Industrial Engineering 147, pages 106605.
Crossref
Mei Zhang, Yingtong Tan, Jinhui Zhu, Yinong Chen & Zetong Chen. (2020) A competitive and cooperative Migrating Birds Optimization algorithm for vary-sized batch splitting scheduling problem of flexible Job-Shop with setup time. Simulation Modelling Practice and Theory 100, pages 102065.
Crossref
Wetinee Pruttivichittra & Olusoyi Richard Ashaye. 2020. Trends and Issues in International Planning for Businesses. Trends and Issues in International Planning for Businesses 110 136 .
Juan M. Novas. (2019) Production scheduling and lot streaming at flexible job-shops environments using constraint programming. Computers & Industrial Engineering 136, pages 252-264.
Crossref
Mehdi Souier, Mohammed Dahane & Fouad Maliki. (2018) An NSGA-II-based multiobjective approach for real-time routing selection in a flexible manufacturing system under uncertainty and reliability constraints. The International Journal of Advanced Manufacturing Technology 100:9-12, pages 2813-2829.
Crossref
Hülya Güçdemir & Hasan Selim. (2018) Integrating simulation modelling and multi criteria decision making for customer focused scheduling in job shops. Simulation Modelling Practice and Theory 88, pages 17-31.
Crossref
Miguel A. Fernández Romero, Eric A. Rincón García, Antonin Ponsich & Roman A. Mora Gutiérrez. (2018) A heuristic algorithm based on tabu search for the solution of flexible job shop scheduling problems with lot streaming. A heuristic algorithm based on tabu search for the solution of flexible job shop scheduling problems with lot streaming.
Fantahun M. Defersha & Saber Bayat Movahed. (2018) Linear programming assisted (not embedded) genetic algorithm for flexible jobshop scheduling with lot streaming. Computers & Industrial Engineering 117, pages 319-335.
Crossref
J. Laxmi Lalitha, Naru Mohan & V. Madhusudanan Pillai. (2017) Lot streaming in [ N -1](1)+ N ( m ) hybrid flow shop. Journal of Manufacturing Systems 44, pages 12-21.
Crossref
Hülya Güçdemir & Hasan Selim. (2017) Customer centric production planning and control in job shops: A simulation optimization approach. Journal of Manufacturing Systems 43, pages 100-116.
Crossref
Pankaj Sharma & Ajai Jain. (2016) Effect of routing flexibility and sequencing rules on performance of stochastic flexible job shop manufacturing system with setup times: Simulation approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231:2, pages 329-345.
Crossref
Pankaj Sharma & Ajai Jain. (2015) New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times. Concurrent Engineering 24:1, pages 58-68.
Crossref
Pankaj Sharma & Ajai Jain. (2015) A review on job shop scheduling with setup times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 230:3, pages 517-533.
Crossref
Pankaj Sharma & Ajai Jain. (2015) Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach. CIRP Journal of Manufacturing Science and Technology 10, pages 110-119.
Crossref
Pankaj Sharma & Ajai Jain. (2015) Stochastic Dynamic Job Shop Scheduling with Sequence-Dependent Setup Times: Simulation Experimentation. Journal of Engineering and Technology 5:1, pages 19.
Crossref
Pankaj Sharma & Ajai Jain. (2014) Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times. Frontiers of Mechanical Engineering 9:4, pages 380-389.
Crossref
Cemalettin Öztürk & Arslan M. Ornek. (2014) Operational extended model formulations for Advanced Planning and Scheduling systems. Applied Mathematical Modelling 38:1, pages 181-195.
Crossref
Jose M. Framinan, Rainer Leisten & Rubén Ruiz GarcíaJose M. Framinan, Rainer Leisten & Rubén Ruiz García. 2014. Manufacturing Scheduling Systems. Manufacturing Scheduling Systems 75 99 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.