268
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling a permutation flow shop with family setups to minimise total tardiness

Pages 2204-2217 | Received 08 Sep 2010, Accepted 28 Feb 2011, Published online: 08 Jul 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

J. S. Neufeld, F. F. Teucher & U. Buscher. (2020) Scheduling flowline manufacturing cells with inter-cellular moves: non-permutation schedules and material flows in the cell scheduling problem. International Journal of Production Research 58:21, pages 6568-6584.
Read now
M. Henneberg & J.S. Neufeld. (2016) A constructive algorithm and a simulated annealing approach for solving flowshop problems with missing operations. International Journal of Production Research 54:12, pages 3534-3550.
Read now
R. M’Hallah. (2014) An iterated local search variable neighborhood descent hybrid heuristic for the total earliness tardiness permutation flow shop. International Journal of Production Research 52:13, pages 3802-3819.
Read now

Articles from other publishers (9)

Andreia F. Silva, Jorge M.S. Valente & Jeffrey E. Schaller. (2022) Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective. Computers & Operations Research 140, pages 105691.
Crossref
Chia-Nan Wang, Hsien-Pin Hsu, Hsin-Pin Fu, Nguyen Ky Phuc Phan & Van Thanh Nguyen. (2022) Scheduling Flexible Flow Shop in Labeling Companies to Minimize the Makespan. Computer Systems Science and Engineering 40:1, pages 17-36.
Crossref
Xinkun Wang, Yuchuan Song, Yuji Zou, Weifei Guo & Yi Wang. (2021) Integrated scheduling algorithm for multiple complex products with due date constraints. Journal of Physics: Conference Series 1748:3, pages 032030.
Crossref
Radu Godina, Carina Pimentel, F.J.G. Silva & João C.O. Matias. (2018) A Structural Literature Review of the Single Minute Exchange of Die: The Latest Trends. Procedia Manufacturing 17, pages 783-790.
Crossref
A. Sioud & C. Gagné. (2018) Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times. European Journal of Operational Research 264:1, pages 66-73.
Crossref
Aymen Sioud & Caroline Gagne. (2016) An MBO algorithm for a flow shop problem with sequence-dependent setup times. An MBO algorithm for a flow shop problem with sequence-dependent setup times.
Janis S. Neufeld, Jatinder N.D. Gupta & Udo Buscher. (2016) A comprehensive review of flowshop group scheduling literature. Computers & Operations Research 70, pages 56-74.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref
Victor Fernandez-Viagas & Jose M. Framinan. (2015) NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness. Computers & Operations Research 60, pages 27-36.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.