891
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

An integrated neural network–simulation algorithm for performance optimisation of the bi-criteria two-stage assembly flow-shop scheduling problem with stochastic activities

, , &
Pages 7271-7284 | Received 04 May 2011, Accepted 27 Nov 2011, Published online: 23 Jan 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Chandan K. Sahu, Crystal Young & Rahul Rai. (2021) Artificial intelligence (AI) in augmented reality (AR)-assisted manufacturing applications: a review. International Journal of Production Research 59:16, pages 4903-4959.
Read now
Mehmet Ertem, Feristah Ozcelik & Tugba Saraç. (2019) Single machine scheduling problem with stochastic sequence-dependent setup times. International Journal of Production Research 57:10, pages 3273-3289.
Read now
G. M. Komaki, Shaya Sheikh & Behnam Malakooti. (2019) Flow shop scheduling problems with assembly operations: a review and new trends. International Journal of Production Research 57:10, pages 2926-2955.
Read now
Asiye Aydilek, Harun Aydilek & Ali Allahverdi. (2017) Minimising maximum tardiness in assembly flowshops with setup times. International Journal of Production Research 55:24, pages 7541-7565.
Read now
Jin Deng, Ling Wang, Sheng-yao Wang & Xiao-long Zheng. (2016) A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem. International Journal of Production Research 54:12, pages 3561-3577.
Read now
Hong-Sen Yan, Xiao-Qin Wan & Fu-Li Xiong. (2014) A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem. International Journal of Production Research 52:19, pages 5626-5639.
Read now

Articles from other publishers (14)

Tugba Saraç, Feristah Ozcelik & Mehmet Ertem. (2023) Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times. Operational Research 23:3.
Crossref
Qiunan Meng, Di Qiu & Yali Liu. (2023) Two-Stage Assembly Flow Shop Scheduling Problem with Sequence-Dependent Setup Times. Two-Stage Assembly Flow Shop Scheduling Problem with Sequence-Dependent Setup Times.
Jianguo Duan, Mengting Wang, Qinglei Zhang & Jiyun Qin. (2023) Distributed shop scheduling: A comprehensive review on classifications, models and algorithms. Mathematical Biosciences and Engineering 20:8, pages 15265-15308.
Crossref
Eliana Maria Gonzalez-Neira, Jairo R. Montoya-Torres & Jose-Fernando Jimenez. (2021) A Multicriteria Simheuristic Approach for Solving a Stochastic Permutation Flow Shop Scheduling Problem. Algorithms 14:7, pages 210.
Crossref
Jorge F. Arinez, Qing Chang, Robert X. Gao, Chengying Xu & Jianjing Zhang. (2020) Artificial Intelligence in Advanced Manufacturing: Current Status and Future Outlook. Journal of Manufacturing Science and Engineering 142:11.
Crossref
Mohammad Hossein Fazel Zarandi, Ali Akbar Sadat Asl, Shahabeddin Sotudian & Oscar Castillo. (2018) A state of the art review of intelligent scheduling. Artificial Intelligence Review 53:1, pages 501-593.
Crossref
Sahar Tadayonirad, Hany Seidgar, Hamed Fazlollahtabar & Rasoul Shafaei. (2019) Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach. Assembly Automation 39:5, pages 944-962.
Crossref
Eliana María González-Neira, Ana María Urrego-Torres, Ana María Cruz-Riveros, Catalina Henao-García, Jairo R. Montoya-Torres, Lina Paola Molina-Sánchez & Jose-Fernando Jiménez. (2019) Robust solutions in multi-objective stochastic permutation flow shop problem. Computers & Industrial Engineering 137, pages 106026.
Crossref
Shaya Sheikh, G.M. Komaki & Vahid Kayvanfar. (2018) Multi objective two-stage assembly flow shop with release time. Computers & Industrial Engineering 124, pages 276-292.
Crossref
Eliana Maria Gonzalez-Neira, Daniele Ferone, Sara Hatami & Angel A. Juan. (2017) A biased-randomized simheuristic for the distributed assembly permutation flowshop problem with stochastic processing times. Simulation Modelling Practice and Theory 79, pages 23-36.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref
Jianyu Long, Zhong Zheng, Xiaoqiang Gao & Kai Chen. (2015) Simulation method for multi-machine and multi-task production scheduling in steelmaking-continuous casting process. Simulation method for multi-machine and multi-task production scheduling in steelmaking-continuous casting process.
Ashkan Negahban & Jeffrey S. Smith. (2014) Simulation for manufacturing system design and operation: Literature review and analysis. Journal of Manufacturing Systems 33:2, pages 241-261.
Crossref
Yan-Chao Wang & Jie Zhang. (2022) Surrogate-based Performance Prediction with Uncertainties in Semiconductor Manufacturing. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.