1,223
Views
55
CrossRef citations to date
0
Altmetric
Original Articles

A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times

, &
Pages 7447-7466 | Received 26 Jul 2011, Accepted 21 Dec 2011, Published online: 13 Mar 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (17)

Shijin Wang, Xiaodong Wang & Li Yu. (2020) Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times. International Journal of Systems Science: Operations & Logistics 7:3, pages 291-307.
Read now
Leilei Meng, Chaoyong Zhang, Xinyu Shao, Biao Zhang, Yaping Ren & Wenwen Lin. (2020) More MILP models for hybrid flow shop scheduling problem and its extended problems. International Journal of Production Research 58:13, pages 3905-3930.
Read now
Mohammadreza Mashayekhi, Homayoon E. Estekanchi, Hassan Vafai & Goodarz Ahmadi. (2019) An evolutionary optimization-based approach for simulation of endurance time load functions. Engineering Optimization 51:12, pages 2069-2088.
Read now
Ezra Wari & Weihang Zhu. (2019) A Constraint Programming model for food processing industry: a case for an ice cream processing facility. International Journal of Production Research 57:21, pages 6648-6664.
Read now
M. Rabiee, F. Jolai, H. Asefi, P. Fattahi & S. Lim. (2016) A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness. International Journal of Computer Integrated Manufacturing 29:9, pages 1007-1024.
Read now
Hamed Samarghandi. (2015) A particle swarm optimisation for the no-wait flow shop problem with due date constraints. International Journal of Production Research 53:9, pages 2853-2870.
Read now
Hamed Samarghandi. (2015) Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times. International Journal of Production Research 53:9, pages 2652-2673.
Read now
Zheng Zeng, Karl Sammut, Andrew Lammas, Fangpo He & Youhong Tang. (2015) Imperialist Competitive Algorithm for AUV Path Planning in a Variable Ocean. Applied Artificial Intelligence 29:4, pages 402-420.
Read now
Hany Seidgar, Mehdi Abedi, Sahar Tadayonirad & Hamed Fazlollahtabar. (2015) A hybrid particle swarm optimisation for scheduling just-in-time single machine with preemption, machine idle time and unequal release times. International Journal of Production Research 53:6, pages 1912-1935.
Read now
Fuli Xiong & Keyi Xing. (2014) Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time. International Journal of Production Research 52:9, pages 2743-2766.
Read now
Hamed Samarghandi & Tarek Y. ElMekkawy. (2014) Solving the no-wait flow-shop problem with sequence-dependent set-up times. International Journal of Computer Integrated Manufacturing 27:3, pages 213-228.
Read now
Hany Seidgar, Morteza Kiani, Mehdi Abedi & Hamed Fazlollahtabar. (2014) An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem. International Journal of Production Research 52:4, pages 1240-1256.
Read now
Z.X. Guo, W.K. Wong & Chunxiang Guo. (2014) A cloud-based intelligent decision-making system for order tracking and allocation in apparel manufacturing. International Journal of Production Research 52:4, pages 1100-1115.
Read now
Kan Wu. (2014) Classification of queueing models for a workstation with interruptions: a review. International Journal of Production Research 52:3, pages 902-917.
Read now
Chen-Yang Cheng, Tzu-Li Chen, Li-Chih Wang & Yin-Yann Chen. (2013) A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting – A case study for the solar cell industry. International Journal of Production Research 51:16, pages 4755-4777.
Read now
Payman Jula & Ishai Kones. (2013) Continuous-time algorithms for scheduling a single machine with sequence-dependent setup times and time window constraints in coordinated chains. International Journal of Production Research 51:12, pages 3654-3670.
Read now
Wuyan Weng, Chengbin Chu & Peng Wu. A Benders decomposition algorithm for resource allocation with multi-resource operations. International Journal of Production Research 0:0, pages 1-17.
Read now

Articles from other publishers (38)

Absalom El-Shamir Ezugwu. (2024) Metaheuristic Optimization for Sustainable Unrelated Parallel Machine Scheduling: A Concise Overview With a Proof-of-Concept Study. IEEE Access 12, pages 3386-3416.
Crossref
Eyüp Ensar Işık, Seyda Topaloglu Yildiz & Özge Şatır Akpunar. (2023) Constraint programming models for the hybrid flow shop scheduling problem and its extensions. Soft Computing 27:24, pages 18623-18650.
Crossref
Pratik Maheshwari, Sachin Kamble, Amine Belhadi, Mani Venkatesh & Mohammad Zoynul Abedin. (2023) Digital twin-driven real-time planning, monitoring, and controlling in food supply chains. Technological Forecasting and Social Change 195, pages 122799.
Crossref
Yankai Wang, Shilong Wang, Wenhan Yang, Chunfeng Shen & Junliang Li. (2023) A digital-twin-based adaptive multi-objective Harris Hawks Optimizer for dynamic hybrid flow green scheduling problem with dynamic events. Applied Soft Computing 143, pages 110274.
Crossref
Lei Yue, Hao Wang, Jabir Mumtaz, Mudassar Rauf & Zhifu Li. (2023) Energy-efficient scheduling of a two-stage flexible printed circuit board flow shop using a hybrid Pareto spider monkey optimisation algorithm. Journal of Industrial Information Integration 31, pages 100412.
Crossref
Ramazan BAŞAR & Orhan ENGİN. (2022) Beklemesiz Akış Tipi Çizelgeleme Problemlerinin Analizi ve Hibrit Dağınık Arama Yöntemi ile ÇözümüAnalysis of No-wait Flow Shop Scheduling Problems and Solving with Hybrid Scatter Search Method. Journal of Advanced Research in Natural and Applied Sciences 8:2, pages 293-308.
Crossref
Amin Abbasi, Somaiyeh MahmoudZadeh & Amirmehdi Yazdani. (2022) A Cooperative Dynamic Task Assignment Framework for COTSBot AUVs. IEEE Transactions on Automation Science and Engineering 19:2, pages 1163-1179.
Crossref
Taher Abunama, Mozafar Ansari, Oluyemi Olatunji Awolusi, Khalid Muzamil Gani, Sheena Kumari & Faizal Bux. (2021) Fuzzy inference optimization algorithms for enhancing the modelling accuracy of wastewater quality parameters. Journal of Environmental Management 293, pages 112862.
Crossref
Wang Yankai, Wang Shilong, Li Dong, Shen Chunfeng & Yang Bo. (2021) An improved multi-objective whale optimization algorithm for the hybrid flow shop scheduling problem considering device dynamic reconfiguration processes. Expert Systems with Applications 174, pages 114793.
Crossref
Leilei Meng, Chao Lu, Biao Zhang, Yaping Ren, Chang Lv, Hongyan Sang, Junqing Li & Chaoyong Zhang. (2021) Constraint programing for solving four complex flexible shop scheduling problems. IET Collaborative Intelligent Manufacturing 3:2, pages 147-160.
Crossref
Hua Xuan, Qianqian Zheng, Bing Li & Xueyuan Wang. (2021) A Novel Genetic Simulated Annealing Algorithm for No-wait Hybrid Flowshop Problem with Unrelated Parallel Machines. ISIJ International 61:1, pages 258-268.
Crossref
Said Aqil & Karam Allali. (2020) Local search metaheuristic for solving hybrid flow shop problem in slabs and beams manufacturing. Expert Systems with Applications 162, pages 113716.
Crossref
Deming Lei & Jingcao Cai. (2020) Multi-population meta-heuristics for production scheduling: A survey. Swarm and Evolutionary Computation 58, pages 100739.
Crossref
Guiliang Gong, Raymond Chiong, Qianwang Deng, Wenwu Han, Like Zhang, Wenhui Lin & Kexin Li. (2020) Energy-efficient flexible flow shop scheduling with worker flexibility. Expert Systems with Applications 141, pages 112902.
Crossref
Houda Harbaoui & Soulef Khalfallah. (2020) Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines. Procedia Computer Science 176, pages 706-712.
Crossref
İlker Küçükoğlu & Nursel Öztürk. (2015) A hybrid meta-heuristic algorithm for vehicle routing and packing problem with cross-docking. Journal of Intelligent Manufacturing 30:8, pages 2927-2943.
Crossref
Fadwa Dababneh & Lin Li. (2019) Integrated Electricity and Natural Gas Demand Response for Manufacturers in the Smart Grid. IEEE Transactions on Smart Grid 10:4, pages 4164-4174.
Crossref
Vahit Tongur & Erkan Ülker. (2018) PSO-based improved multi-flocks migrating birds optimization (IMFMBO) algorithm for solution of discrete problems. Soft Computing 23:14, pages 5469-5484.
Crossref
Xinyu Li, Chao Lu, Liang Gao, Shengqiang Xiao & Long Wen. (2018) An Effective Multiobjective Algorithm for Energy-Efficient Scheduling in a Real-Life Welding Shop. IEEE Transactions on Industrial Informatics 14:12, pages 5400-5409.
Crossref
Liji Shen, Stéphane Dauzère-Pérès & Janis S. Neufeld. (2018) Solving the flexible job shop scheduling problem with sequence-dependent setup times. European Journal of Operational Research 265:2, pages 503-516.
Crossref
Haicao Song, Shuping Yi, Mi Liu & Gaoyang Qin. (2017) Single Machine Scheduling Based on EDD-SDST-ACO Heuristic Algorithm. Journal of Intelligent Systems 26:4, pages 657-667.
Crossref
Hamidreza Kia, Seyed Hassan Ghodsypour & Hamid Davoudpour. (2017) New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times. Journal of Industrial Engineering International 13:3, pages 297-306.
Crossref
Zhang Yonglai, Song Wenai & Fu Lizhen. (2017) Feature selection for risk detection of strokes: A 5-year longitudinal study. Feature selection for risk detection of strokes: A 5-year longitudinal study.
Sun Yue, Lin Shuo, Li Tan & Ma Xiaofu. (2017) Improved imperialist competitive algorithm for flexible flow shop scheduling. Improved imperialist competitive algorithm for flexible flow shop scheduling.
Honghan Ye, Wei Li, Amin Abedini & Barrie Nault. (2017) An effective and efficient heuristic for no-wait flow shop production to minimize total completion time. Computers & Industrial Engineering 108, pages 57-69.
Crossref
Hongying Fei, Qian Li & Dan Sun. (2017) A Survey of Recent Research on Optimization Models and Algorithms for Operations Management from the Process View. Scientific Programming 2017, pages 1-19.
Crossref
N. Karimi & H. Davoudpour. (2017) A knowledge-based approach for multi-factory production systems. Computers & Operations Research 77, pages 72-85.
Crossref
Ali Allahverdi. (2016) A survey of scheduling problems with no-wait in process. European Journal of Operational Research 255:3, pages 665-686.
Crossref
N. Karimi & H. Davoudpour. (2016) Multi-objective colonial competitive algorithm for hybrid flowshop problem. Applied Soft Computing 49, pages 725-733.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref
Mageed A. Ghaleb, Umar S. Suryahatmaja & Ibrahim M. Alharkan. (2015) Metaheuristics for two-stage no-wait flexible flow shop scheduling problem. Metaheuristics for two-stage no-wait flexible flow shop scheduling problem.
Zhu Baiqing, Lu Haixing, Tong Yifei, Li Dongbo & Xia Yong. (2015) Research on Charging Combination Based on Batch Weight Fit Rule for Energy Saving in Forging. Mathematical Problems in Engineering 2015, pages 1-9.
Crossref
H. Piroozfard & K. Y. Wong. (2014) An imperialist competitive algorithm for the job shop scheduling problems. An imperialist competitive algorithm for the job shop scheduling problems.
Ali Allahverdi & Harun Aydilek. (2014) Total completion time with makespan constraint in no-wait flowshops with setup times. European Journal of Operational Research 238:3, pages 724-734.
Crossref
H. Asefi, F. Jolai, M. Rabiee & M. E. Tayebi Araghi. (2014) A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem. The International Journal of Advanced Manufacturing Technology 75:5-8, pages 1017-1033.
Crossref
Masoud Bagheri & Mahdi Bashiri. (2013) A hybrid genetic and imperialist competitive algorithm approach to dynamic cellular manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 228:3, pages 458-470.
Crossref
M. Rabiee, Reza Sadeghi Rad, M. Mazinani & R. Shafaei. (2014) An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines. The International Journal of Advanced Manufacturing Technology 71:5-8, pages 1229-1245.
Crossref
S. F. Attar, M. Mohammadi & R. Tavakkoli-Moghaddam. (2013) Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times. The International Journal of Advanced Manufacturing Technology 68:5-8, pages 1583-1599.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.