333
Views
24
CrossRef citations to date
0
Altmetric
Articles

Forecasting and maintenance problem under subcontracting constraint with transportation delay

, &
Pages 6695-6716 | Received 06 Feb 2013, Accepted 10 Feb 2014, Published online: 29 Apr 2014

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Lei Zhou, Lili Dong & Fachao Li. (2020) Compensation mechanism of delayed distribution based on interest balance. Transportation Letters 12:10, pages 732-737.
Read now
Nadia Ndhaief, Rezg Nidhal, Adnène Hajji & Olivier Bistorin. (2020) Environmental issue in an integrated production and maintenance control of unreliable manufacturing/remanufacturing systems. International Journal of Production Research 58:14, pages 4182-4200.
Read now
M. Assid, A. Gharbi & A. Hajji. (2020) Production and subcontracting control for an unreliable manufacturing system with setups. International Journal of Production Research 58:12, pages 3570-3588.
Read now
Zied Hajej, Nidhal Rezg & Ali Gharbi. (2017) Improved preventive maintenance in the framework of forecasting problem under subcontractor constraint. International Journal of Production Research 55:16, pages 4557-4600.
Read now
Zied Hajej, Sadok Turki & Nidhal Rezg. (2015) Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns. International Journal of Production Research 53:15, pages 4694-4719.
Read now
Victor Chukwunweike Nwokocha & Iganatius Ani Madu. (2015) Influence of subcontracting constraints on the performance of manufacturing industries in Nigeria. Production & Manufacturing Research 3:1, pages 343-354.
Read now

Articles from other publishers (18)

Aisha Sa’ad, Aimé C. Nyoungue & Zied Hajej. (2022) An integrated maintenance and power generation forecast by ANN approach based on availability maximization of a wind farm. Energy Reports 8, pages 282-301.
Crossref
Aisha Sa’ad, Aimé C. Nyoungue & Zied Hajej. (2022) Bi-Objective Preventive Maintenance Scheduling Optimization of Photovoltaic System based on Availability. IOP Conference Series: Earth and Environmental Science 1054:1, pages 012041.
Crossref
Akrem Dhahri, Ali Gharbi & Mustapha Ouhimmou. (2022) Integrated production-transshipment control policy for a two-location unreliable manufacturing system. International Journal of Production Economics 247, pages 108440.
Crossref
Lei Zhou, Yue Qi & Fachao Li. (2022) Research on the n-Stage Delay Distribution Method Based on a Compensation Mechanism in a Random Environment. Axioms 11:2, pages 67.
Crossref
Babur Wasim Arif & Sana Ullah. (2021) From subcontractors to company owners: modeling firm-type choices in industrial clusters. Journal of Global Entrepreneurship Research 11:1, pages 153-161.
Crossref
Victor Chukwunweike Nwokocha, Christopher Emmanuel Nwankwo, Ijeoma Gladys Nwosu & Ignatius Ani Madu. (2020) An Appraisal of Production Subcontracting Toward Small and Medium Scale Enterprises Development in the Nigeria Industrial Sector: A Review Approach. SAGE Open 10:3, pages 215824402094100.
Crossref
V. Polotski, J.-P. Kenne & A. Gharbi. (2020) Kalman filter based production control of a failure-prone single-machine single-product manufacturing system with imprecise demand and inventory information. Journal of Manufacturing Systems 56, pages 558-572.
Crossref
Zied Hajej, Nidhal Rezg & Salim Bouslikhane. (2019) A Joint Production and Maintenance Optimization of Closed-Loop Production System under Carbon Emission with a Switching Subcontractor Consideration. Applied Sciences 9:6, pages 1105.
Crossref
Héctor Rivera-Gómez, Ali Gharbi, Jean-Pierre Kenné, Oscar Montaño-Arango & Eva Selene Hernández-Gress. (2018) Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration. International Journal of Production Economics 200, pages 103-118.
Crossref
Nouhayla Hafidi, Abdellah El Barkany & Morad Mahmoudi. (2018) Optimizing subcontracting choice in the context of integrated maintenance into production. Optimizing subcontracting choice in the context of integrated maintenance into production.
Mohammadbagher Afshar-Bakeshloo, Ali Bozorgi-Amiri, Seyed Mojtaba Sajadi & Fariborz Jolai. (2018) A multi-objective Environmental Hedging Point Policy with customer satisfaction criteria. Journal of Cleaner Production 179, pages 478-494.
Crossref
Z. Hajej, N. Rezg & S. Bouslikhane. (2017) A jointly integrated maintenance and emission optimization for a manufacturing and remanufacturing system. A jointly integrated maintenance and emission optimization for a manufacturing and remanufacturing system.
Zied Hajej, Nidhal Rezg & Ali Gharbi. (2017) Joint optimization of production and maintenance planning with an environmental impact study. The International Journal of Advanced Manufacturing Technology 93:1-4, pages 1269-1282.
Crossref
Vladimir Polotski & Jean-Pierre Kenne. (2017) Adaptive control of manufacturing systems with incomplete information about demand and inventory. IFAC-PapersOnLine 50:1, pages 15598-15603.
Crossref
Zied Hajej, Nidhal Rezg & Ali Gharbi. (2016) Ecological optimization for forecasting production and maintenance problem based on carbon tax. The International Journal of Advanced Manufacturing Technology 88:5-8, pages 1595-1606.
Crossref
Nidhal Rezg, Zied Hajej & Valerio Boschian-Campaner. 2016. Production and Maintenance Optimization Problems. Production and Maintenance Optimization Problems 173 181 .
Yihai He, Zhenzhen He, Linbo Wang & Changchao Gu. (2015) Reliability Modeling and Optimization Strategy for Manufacturing System Based on RQR Chain. Mathematical Problems in Engineering 2015, pages 1-13.
Crossref
Vinh Thanh Ho, Zied Hajej, Hoai An Le Thi & Nidhal Rezg. 2015. Modelling, Computation and Optimization in Information Systems and Management Sciences. Modelling, Computation and Optimization in Information Systems and Management Sciences 307 318 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.