387
Views
29
CrossRef citations to date
0
Altmetric
Articles

Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan

, &
Pages 2803-2819 | Received 05 Jun 2014, Accepted 03 Dec 2014, Published online: 27 Jan 2015

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Li Xue, Yantong Li, Zheng Wang, Sai-Ho Chung & Xin Wen. (2024) Distributed appointment assignment and scheduling under uncertainty. International Journal of Production Research 62:1-2, pages 318-335.
Read now
Najat Almasarwah & Gürsel A. Süer. (2021) Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells. International Journal of Production Research 59:21, pages 6544-6563.
Read now
Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu & Ming Liu. (2021) Parallel machine scheduling with stochastic release times and processing times. International Journal of Production Research 59:20, pages 6327-6346.
Read now
Min Kong, Jun Pei, Jin Xu, Xinbao Liu, Xiaoyu Yu & Panos M. Pardalos. (2020) A robust optimization approach for integrated steel production and batch delivery scheduling with uncertain rolling times and deterioration effect. International Journal of Production Research 58:17, pages 5132-5154.
Read now
Ming Liu, Xin Liu, Feng Chu, Feifeng Zheng & Chengbin Chu. (2020) Profit-oriented distributionally robust chance constrained flowshop scheduling considering credit risk. International Journal of Production Research 58:8, pages 2527-2549.
Read now
Juan Liu, Fei Qiao & Weichang Kong. (2019) Scenario-based multi-objective robust scheduling for a semiconductor production line. International Journal of Production Research 57:21, pages 6807-6826.
Read now
Mehmet Ertem, Feristah Ozcelik & Tugba Saraç. (2019) Single machine scheduling problem with stochastic sequence-dependent setup times. International Journal of Production Research 57:10, pages 3273-3289.
Read now
Asiye Aydilek, Harun Aydilek & Ali Allahverdi. (2017) Minimising maximum tardiness in assembly flowshops with setup times. International Journal of Production Research 55:24, pages 7541-7565.
Read now

Articles from other publishers (21)

Xinyu Zhang, Runfo Li, Chengbo Wang, Biao Xue & Wenqiang Guo. (2024) Robust optimization for a class of ship traffic scheduling problem with uncertain arrival and departure times. Engineering Applications of Artificial Intelligence 133, pages 108257.
Crossref
Ding Chen, Feng Chu & Lijun Tian. (2023) Closed-loop food supply chain with returnable transport items and uncertain production capacity. Closed-loop food supply chain with returnable transport items and uncertain production capacity.
Tugba Saraç, Feristah Ozcelik & Mehmet Ertem. (2023) Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times. Operational Research 23:3.
Crossref
Ali Allahverdi & Muberra Allahverdi. (2023) Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times. RAIRO - Operations Research 57:4, pages 1733-1743.
Crossref
Alberto Locatelli, Manuel Iori, Marco Lippi & Marco Locatelli. 2023. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures 707 721 .
Muberra ALLAHVERDİ. (2022) A Substantially Improved New Algorithm for Flowshop Scheduling Problem with Uncertain Processing Times. Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi 14:1, pages 155-163.
Crossref
Mehmet ERTEM, Feriştah ÖZÇELİK & Tuğba SARAÇ. (2021) Stokastik İlişkisiz Paralel Makine Çizelgeleme Problemi için bir Matematiksel Model. European Journal of Science and Technology.
Crossref
Ali ALLAHVERDİ & Muberra ALLAHVERDİ. (2021) An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times. Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi 13:2, pages 521-530.
Crossref
Muberra Allahverdi, Harun Aydilek, Asiye Aydilek & Ali Allahverdi. (2021) A better dominance relation and heuristics for Two-Machine No-Wait Flowshops with Maximum Lateness Performance Measure. Journal of Industrial & Management Optimization 17:4, pages 1973.
Crossref
Muberra Allahverdi & Ali Allahverdi. (2021) Minimizing total completion time for flowshop scheduling problem with uncertain processing times. RAIRO - Operations Research 55, pages S929-S946.
Crossref
Zhengbin Ni, Bing Wang & Bo Wu. (2020) A Hybrid Algorithm for a Robust Permutation Flow Shop Scheduling Problem. A Hybrid Algorithm for a Robust Permutation Flow Shop Scheduling Problem.
Muberra Allahverdi & Ali Allahverdi. (2020) Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan. RAIRO - Operations Research 54:2, pages 529-553.
Crossref
Ming Liu & Xin Liu. (2019) Profit-driven stochastic scheduling considering discounted cash flows under Industry 4.0. IFAC-PapersOnLine 52:13, pages 2122-2127.
Crossref
Ming Liu & Xin Liu. (2019) Machine scheduling with stochastic release and processing times. IFAC-PapersOnLine 52:13, pages 2116-2121.
Crossref
Ming Liu & Xin Liu. (2019) Risk level-driven bi-objective stochastic parallel machine scheduling problem. IFAC-PapersOnLine 52:13, pages 869-874.
Crossref
Ali Allahverdi & Muberra Allahverdi. (2018) Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness. Computational and Applied Mathematics 37:5, pages 6774-6794.
Crossref
Juan LIU, Fei QIAO, Yumin MA & Weichang KONG. (2018) Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing time. Frontiers of Engineering Management 5:4, pages 507.
Crossref
Najat Almasarwah & Gürsel Süer. (2018) Product Scheduling in a Flowshop Cell. Procedia Manufacturing 17, pages 206-213.
Crossref
Ruihua Wang. (2017) Furniture production scheduling designed for reducing weather impacts. Furniture production scheduling designed for reducing weather impacts.
Wen-Chiung Lee & Jen-Ya Wang. (2017) A three-agent scheduling problem for minimizing the makespan on a single machine. Computers & Industrial Engineering 106, pages 147-160.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.