512
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Optimal imperfect preventive maintenance policy for equipment leased during successive periods

, &
Pages 5095-5110 | Received 23 Jul 2015, Accepted 30 Dec 2015, Published online: 22 Feb 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

Yutong Ding, Tangbin Xia, Mengdie Huang, Yu Zheng, Rui Miao & Lifeng Xi. (2023) Predictive Maintenance and Upgrade Scheduling for Production Line under Multi-period Product-service Paradigm. Engineering Optimization 55:10, pages 1723-1741.
Read now
Amel Ben Mabrouk & Anis Chelbi. (2023) Optimal maintenance policy for equipment leased with base and extended warranty. International Journal of Production Research 61:3, pages 898-909.
Read now
Zhiping Zhou, Jing Ren, Xinbao Liu & Panos M. Pardalos. (2022) Collaborating product development and maintenance service: quality incentive with inspection and warranty strategies. International Journal of Production Research 0:0, pages 1-18.
Read now
Zied Hajej, Nidhal Rezg & Ali Gharbi. (2020) Maintenance on leasing sales strategies for manufacturing/remanufacturing system with increasing failure rate and carbon emission. International Journal of Production Research 58:21, pages 6616-6637.
Read now
Fabio Sgarbossa, Ilenia Zennaro, Eleonora Florian & Martina Calzavara. (2020) Age replacement policy in the case of no data: the effect of Weibull parameter estimation. International Journal of Production Research 58:19, pages 5851-5869.
Read now
Amel Ben Mabrouk, Anis Chelbi, Lazher Tlili & Mehdi Radhoui. (2020) A quasi-optimal inspection strategy for leased equipment. International Journal of Production Research 58:3, pages 878-892.
Read now
Xiaolin Wang, Lishuai Li & Min Xie. (2019) Optimal preventive maintenance strategy for leased equipment under successive usage-based contracts. International Journal of Production Research 57:18, pages 5705-5724.
Read now
Chaoqun Duan, Chao Deng, Abolfazl Gharaei, Jun Wu & Bingran Wang. (2018) Selective maintenance scheduling under stochastic maintenance quality with multiple maintenance actions. International Journal of Production Research 56:23, pages 7160-7178.
Read now
Chin-Chih Chang. (2018) Optimal age replacement scheduling for a random work system with random lead time. International Journal of Production Research 56:16, pages 5511-5521.
Read now
Yanping Liu, Biyu Liu, Haidong Yang & Kai Luo. Optimal pricing and inventory strategies for leased equipment considering lessees’ options. International Journal of Production Research 0:0, pages 1-18.
Read now

Articles from other publishers (19)

Biyu Liu, Ting Chen, Haidong Yang & Liangwei Zhang. (2023) Multi-phase preventive maintenance strategy for leased equipment considering usage rate variation. Computers & Industrial Engineering 185, pages 109673.
Crossref
Yaping Li, Tangbin Xia & Zhen Chen. (2023) Cooperative Maintenance Policy and Pricing Scheme for a Leased Series Manufacturing System. Cooperative Maintenance Policy and Pricing Scheme for a Leased Series Manufacturing System.
Lazhar Tlili, Chelbi Anis & Mokhles Bouazizi. (2023) Optimal preventive maintenance policy for leased equipment for free with minimum quantity of consumables purchasing commitment by the lessee. Journal of Quality in Maintenance Engineering 29:3, pages 708-725.
Crossref
Rongcai Wang, Enzhi Dong, Zhonghua Cheng & Qian Wang. (2023) Optimization of extended warranty cost for multi-component systems with economic dependence based on group maintenance. Journal of Systems Engineering and Electronics 34:2, pages 396-407.
Crossref
Amel Ben Mabrouk & Anis Chelbi. (2022) Joint preventive maintenance and extended warranty strategy for leased unreliable equipment submitted to imperfect repair at failure. IFAC-PapersOnLine 55:10, pages 1201-1206.
Crossref
Rongcai Wang, Zhonghua Cheng, Enzhi Dong, Chiming Guo & Liqing Rong. (2021) Reliability-Based Opportunistic Maintenance Modeling for Multi-Component Systems with Economic Dependence under Base Warranty. Discrete Dynamics in Nature and Society 2021, pages 1-16.
Crossref
Hennie Husniah, Udjianna S. Pasaribu, Rachmawati Wangsaputra & Bermawi P. Iskandar. (2021) Condition-based maintenance policy for a leased reman product. Heliyon 7:4, pages e06494.
Crossref
Rongcai Wang, Enzhi Dong, Zhonghua Cheng, Liqing Rong & Qian Wang. (2021) Optimization of Extended Warranty Cost for Multi-Component Products with Failure Interaction. Discrete Dynamics in Nature and Society 2021, pages 1-12.
Crossref
Tangbin Xia, Bowen Sun, Zhen Chen, Ershun Pan, Hao Wang & Lifeng Xi. (2021) Opportunistic maintenance policy integrating leasing profit and capacity balancing for serial-parallel leased systems. Reliability Engineering & System Safety 205, pages 107233.
Crossref
Dwi Sukma Donoriyanto, Ika Yuniar Silfiana, W Endang Pudji, Akmal Suryadi & L. Urip Widodo. (2020) Determination of Maintenance Schedule of Loading and Unloading Pump Machine Using Genetic Algorithm Method. Journal of Physics: Conference Series 1569:3, pages 032008.
Crossref
Zhen He, Dongfan Wang, Shuguang He, Yiwen Zhang & Anshu Dai. (2020) Two-dimensional extended warranty strategy including maintenance level and purchase time: A win-win perspective. Computers & Industrial Engineering 141, pages 106294.
Crossref
Moosa Sharafali, Hakan Tarakci, Shailesh Kulkarni & Raja Abdul Razack Shahul Hameed. (2019) Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance. International Journal of Production Economics 208, pages 53-68.
Crossref
Ammar Y. Alqahtani & Surendra M. Gupta. (2018) Money-back guarantee warranty policy with preventive maintenance strategy for sensor-embedded remanufactured products. Journal of Industrial Engineering International 14:4, pages 767-782.
Crossref
Tangbin Xia, Yifan Dong, Lei Xiao, Shichang Du, Ershun Pan & Lifeng Xi. (2018) Recent advances in prognostics and health management for advanced manufacturing paradigms. Reliability Engineering & System Safety 178, pages 255-268.
Crossref
Ju-hyun Lee, Ki-ho Bae & Sun-eung Ahn. (2018) Developing a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment. Journal of Society of Korea Industrial and Systems Engineering 41:2, pages 24-31.
Crossref
A. Ben Mabrouk, A. Chelbi & M. Radhoui. (2017) Optimal hybrid imperfect preventive maintenance policy for leased equipment. IFAC-PapersOnLine 50:1, pages 13698-13703.
Crossref
Ammar Y. Alqahtani & Surendra M. Gupta. (2017) Evaluating two-dimensional warranty policies for remanufactured products. Journal of Remanufacturing 7:1, pages 19-47.
Crossref
Ammar Alqahtani & Surendra Gupta. (2017) One-Dimensional Renewable Warranty Management within Sustainable Supply Chain. Resources 6:2, pages 16.
Crossref
A. Ben Mabrouk, A. Chelbi & M. Radhoui. (2016) Optimal imperfect maintenance strategy for leased equipment. International Journal of Production Economics 178, pages 57-64.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.