606
Views
39
CrossRef citations to date
0
Altmetric
Original Articles

Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns

Pages 1565-1587 | Received 30 Nov 2015, Accepted 27 Jan 2016, Published online: 17 Feb 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (12)

Dan Luo, Simon Thevenin & Alexandre Dolgui. (2023) A state-of-the-art on production planning in Industry 4.0. International Journal of Production Research 61:19, pages 6602-6632.
Read now
Xavier Schepler, Nabil Absi & Antoine Jeanjean. (2023) Refurbishment and remanufacturing planning model for pre-owned consumer electronics. International Journal of Production Research 0:0, pages 1-23.
Read now
Pedro Piñeyro & Omar Viera. (2022) The economic lot-sizing problem with remanufacturing and heterogeneous returns: formulations, analysis and algorithms. International Journal of Production Research 60:11, pages 3521-3533.
Read now
Amir Khakbaz. (2022) Production planning of a closed-loop hybrid system on primary/secondary market under WEEE Directive and 2-way substitution. International Journal of Systems Science: Operations & Logistics 9:2, pages 263-279.
Read now
Junkai He, Feng Chu, Alexandre Dolgui, Feifeng Zheng & Ming Liu. (2022) Integrated stochastic disassembly line balancing and planning problem with machine specificity. International Journal of Production Research 60:5, pages 1688-1708.
Read now
Salvatore Cannella, Borja Ponte, Roberto Dominguez & Jose M. Framinan. (2021) Proportional order-up-to policies for closed-loop supply chains: the dynamic effects of inventory controllers. International Journal of Production Research 59:11, pages 3323-3337.
Read now
Haolan Liao, Neng Shen & Yanzhen Wang. (2020) Design and realisation of an efficient environmental assessment method for 3R systems: a case study on engine remanufacturing. International Journal of Production Research 58:19, pages 5980-6003.
Read now
Junkai He, Feng Chu, Feifeng Zheng, Ming Liu & Chengbin Chu. (2020) A multi-objective distribution-free model and method for stochastic disassembly line balancing problem. International Journal of Production Research 58:18, pages 5721-5737.
Read now
S. Sarkar & B. C. Giri. (2020) Stochastic supply chain model with imperfect production and controllable defective rate. International Journal of Systems Science: Operations & Logistics 7:2, pages 133-146.
Read now
Thanos E. Goltsos, Borja Ponte, Shixuan Wang, Ying Liu, Mohamed M. Naim & Aris A. Syntetos. (2019) The boomerang returns? Accounting for the impact of uncertainties on the dynamics of remanufacturing systems. International Journal of Production Research 57:23, pages 7361-7394.
Read now
Nima Kazemi, Nikunja Mohan Modak & Kannan Govindan. (2019) A review of reverse logistics and closed loop supply chain management studies published in IJPR: a bibliometric and content analysis. International Journal of Production Research 57:15-16, pages 4937-4960.
Read now
Mehmood Khan, Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón. (2017) Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands. International Journal of Production Research 55:16, pages 4816-4832.
Read now

Articles from other publishers (27)

Junling Han, Nengmin Wang, Zhengwen He & Bin Jiang. (2023) Product pricing and recycling mode considering competition under used product error classification. Computers & Industrial Engineering 186, pages 109735.
Crossref
Lahiru Gunasekara, David J. Robb & Abraham Zhang. (2023) Used product acquisition, sorting and disposition for circular supply chains: Literature review and research directions. International Journal of Production Economics 260, pages 108844.
Crossref
Rebecca Fussone, Roberto Dominguez, Salvatore Cannella & Jose M. Framinan. (2023) Bullwhip effect in closed-loop supply chains with multiple reverse flows: a simulation study. Flexible Services and Manufacturing Journal.
Crossref
M. Assid, A. Gharbi & A. Hajji. (2023) Integrated control policies of production, returns’ replenishment and inspection for unreliable hybrid manufacturing-remanufacturing systems with a quality constraint. Computers & Industrial Engineering 176, pages 109000.
Crossref
Xiaoping Xu & Tsan-Ming Choi. (2022) Used-Part-Collection Programs in Manufacturing Systems for Products With Reusable Parts: Roles of Risk Aversion and Platforms. IEEE Transactions on Systems, Man, and Cybernetics: Systems 52:10, pages 6038-6047.
Crossref
Yonit Barron & Michael Dreyfuss. (2021) A triple -thresholds base-stock policy subject to uncertainty environment, returns and order cancellations . Computers & Operations Research 134, pages 105320.
Crossref
Guangquan Huang, Liming Xiao & Genbao Zhang. (2021) Decision-making model of machine tool remanufacturing alternatives based on dual interval rough number clouds. Engineering Applications of Artificial Intelligence 104, pages 104392.
Crossref
Haolan Liao, Changxu Li, Yongyou Nie, Jing Tan & Kui Liu. (2021) Environmental efficiency assessment for remanufacture of end of life machine and multi-objective optimization under carbon trading mechanism. Journal of Cleaner Production 308, pages 127168.
Crossref
Borja Ponte, Salvatore Cannella, Roberto Dominguez, Mohamed M. Naim & Aris A. Syntetos. (2021) Quality grading of returns and the dynamics of remanufacturing. International Journal of Production Economics 236, pages 108129.
Crossref
Carolina Devoto, Emilia Fernández & Pedro Piñeyro. (2020) The economic lot-sizing problem with remanufacturing and inspection for grading heterogeneous returns. Journal of Remanufacturing 11:1, pages 71-87.
Crossref
Sumon Sarkar & Bibhas Chandra Giri. (2021) Optimal ordering policy in a two-echelon supply chain model with variable backorder and demand uncertainty. RAIRO - Operations Research 55, pages S673-S698.
Crossref
Roberto Dominguez, Salvatore Cannella, Borja Ponte & Jose M. Framinan. (2020) On the dynamics of closed-loop supply chains under remanufacturing lead time variability. Omega 97, pages 102106.
Crossref
Mirena Isaeva Rizova, T.C. Wong & Winifred Ijomah. (2020) A systematic review of decision-making in remanufacturing. Computers & Industrial Engineering 147, pages 106681.
Crossref
Sebastian Groß, Wolfgang Gerke & Peter Plapper. (2020) Agent-based, hybrid control architecture for optimized and flexible production scheduling and control in remanufacturing. Journal of Remanufacturing.
Crossref
S. Sarkar & B. C. Giri. (2018) A vendor–buyer integrated inventory system with variable lead time and uncertain market demand. Operational Research 20:1, pages 491-515.
Crossref
Xuefang Sun. (2020) The Single-Vendor Multibuyer Integrated Production-Delivery Model with Production Capacity under Stochastic Lead Time Demand. Mathematical Problems in Engineering 2020, pages 1-11.
Crossref
Karina Cecilia Arredondo-Soto, Marco A. Miranda-Ackerman & Mydory Oyuky Nakasima-López. 2020. Handbook of Research on Industrial Applications for Improved Supply Chain Performance. Handbook of Research on Industrial Applications for Improved Supply Chain Performance 73 100 .
Nasser Tarin, Adel Azar & Seyyed Abbas Ebrahimi. (2019) Two-phase approach to an integrated reverse logistics network considering different qualities of returned products. Journal of Advances in Management Research 17:3, pages 369-395.
Crossref
Saurabh Agrawal & Rajesh Kumar Singh. (2019) Forecasting product returns and reverse logistics performance: structural equation modelling. Management of Environmental Quality: An International Journal 31:5, pages 1223-1237.
Crossref
Jean D. Kabongo. (2018) Sustainable development and research and development intensity in U.S. manufacturing firms. Business Strategy and the Environment 28:4, pages 556-566.
Crossref
Ágota Bányai, Béla Illés, Elke Glistau, Norge Isaias Coello Machado, Péter Tamás, Faiza Manzoor & Tamás Bányai. (2019) Smart Cyber-Physical Manufacturing: Extended and Real-Time Optimization of Logistics Resources in Matrix Production. Applied Sciences 9:7, pages 1287.
Crossref
Swee Kuik & Li Diong. (2019) Building Model-Driven Decision Support System in Product Redesign Plan. Designs 3:1, pages 18.
Crossref
Sarah E. Marshall & Thomas W. Archibald. (2018) Lot-sizing for a product recovery system with quality-dependent recovery channels. Computers & Industrial Engineering 123, pages 134-147.
Crossref
Pedro Piñeyro & Omar Viera. (2018) Heuristic procedure for the economic lot-sizing problem with remanufacturing and recovery targets. Journal of Remanufacturing 8:1-2, pages 39-50.
Crossref
Samuel Brüning Larsen, Donato Masi, Diana Cordes Feibert & Peter Jacobsen. (2018) How the reverse supply chain impacts the firm’s financial performance. International Journal of Physical Distribution & Logistics Management 48:3, pages 284-307.
Crossref
Hong Sun, Weida Chen, Biyu Liu & Xu Chen. (2018) Economic lot scheduling problem in a remanufacturing system with returns at different quality grades. Journal of Cleaner Production 170, pages 559-569.
Crossref
Sarah E. Marshall & Thomas W. Archibald. (2017) Lot-Sizing for a Product Recovery System with Quality-Dependent Recovery Channels. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.