515
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Variability modelling and balancing of stochastic assembly lines

, &
Pages 5761-5782 | Received 06 Oct 2015, Accepted 04 Apr 2016, Published online: 22 Apr 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu & Ming Liu. (2022) Distributionally robust and risk-averse optimisation for the stochastic multi-product disassembly line balancing problem with workforce assignment. International Journal of Production Research 60:6, pages 1973-1991.
Read now
Mehmet Pınarbaşı & Hacı Mehmet Alakaş. (2020) Balancing stochastic type-II assembly lines: chance-constrained mixed integer and constraint programming models. Engineering Optimization 52:12, pages 2146-2163.
Read now
Hacı Mehmet Alakaş & Bilal Toklu. (2020) Problem Specific Variable Selection Rules for Constraint Programming: A Type II Mixed Model Assembly Line Balancing Problem Case. Applied Artificial Intelligence 34:7, pages 564-584.
Read now
Shraga Shoval, Mahmoud Efatmaneshnik & Michael J. Ryan. (2017) Assembly sequence planning for processes with heterogeneous reliabilities. International Journal of Production Research 55:10, pages 2806-2828.
Read now

Articles from other publishers (16)

Muhammet Ceyhan Şahin & Mustafa Kemal Tural. (2023) Robotic stochastic assembly line balancing. Flexible Services and Manufacturing Journal 35:4, pages 1076-1115.
Crossref
Hacı Mehmet Alakaş & Mehmet Pınarbaşı. (2023) Balancing of cost-oriented U-type general resource-constrained assembly line: new constraint programming models. Soft Computing 27:24, pages 18667-18680.
Crossref
Luis A. Moncayo-Martínez & Elias H. Arias-Nava. (2023) Assessing by Simulation the Effect of Process Variability in the SALB-1 Problem. AppliedMath 3:3, pages 563-581.
Crossref
Olga Battaïa & Alexandre Dolgui. (2022) Hybridizations in line balancing problems: A comprehensive review on new trends and formulations. International Journal of Production Economics 250, pages 108673.
Crossref
Elif KAYMAZ & Fatih ÇAVDUR. (2022) Montaj Hattı Dengelemede Yeniden İşleme İstasyonlarının Paralel Görevler için Kullanımının Matematiksel Programlama ve Simülasyon ile AnaliziAnalyzing the Use of Rework Stations for Parallel Tasks in Assembly Line Balancing via Mathematical Programming and Simulation. Politeknik Dergisi 25:1, pages 205-222.
Crossref
Mehmet Pınarbaşı. (2021) New chance-constrained models for U-type stochastic assembly line balancing problem. Soft Computing 25:14, pages 9559-9573.
Crossref
Hacı Mehmet Alakaş. (2021) General resource-constrained assembly line balancing problem: conjunction normal form based constraint programming models. Soft Computing 25:8, pages 6101-6111.
Crossref
Hacı Mehmet Alakaş, Mehmet Pınarbaşı & Mustafa Yüzükırmızı. (2019) Constraint programming model for resource-constrained assembly line balancing problem. Soft Computing 24:7, pages 5367-5375.
Crossref
Mehmet Pinarbasi, Hacı Mehmet Alakas & Mustafa Yuzukirmizi. (2019) A constraint programming approach to type-2 assembly line balancing problem with assignment restrictions. Assembly Automation 39:5, pages 813-826.
Crossref
Chang-Jun Li, Zong-Shi Xie, Xin-Ran Peng & Bo Li. (2018) Performance Evaluation and Improvement of Chipset Assembly & Test Production Line Based on Variability. International Journal of Automation and Computing 16:2, pages 186-198.
Crossref
Chrissoleon T. Papadopoulos, Jingshan Li & Michael E.J. O'Kelly. (2019) A classification and review of timed Markov models of manufacturing systems. Computers & Industrial Engineering 128, pages 219-244.
Crossref
Masood Fathi, Amir Nourmohammadi, Amos H. C. Ng & Anna Syberfeldt. (2019) An Optimization Model for Balancing Assembly Lines With Stochastic Task Times and Zoning Constraints. IEEE Access 7, pages 32537-32550.
Crossref
Patrice Lajoie, Jonathan Gaudreault, Nadia Lehoux & Maha Ben Ali. (2019) A data-driven framework to deal with intrinsic variability of industrial processes: An application in the textile industry. IFAC-PapersOnLine 52:13, pages 731-736.
Crossref
Changjun Li, Jingye Liu & Bo Li. (2018) Performance Prediction and Evaluation Based on the Variability Theory in Production Lines Using ARENA Simulation. Wireless Personal Communications 103:1, pages 897-920.
Crossref
Changjun Li, Bo Li & Qiang Hu. (2018) Cycle time prediction and improvement of chipset assembly and test production line based on variability. Production Engineering 12:3-4, pages 319-330.
Crossref
Changjun LI, Jinbin ZHANG & Bo LI. (2018) Performance analysis and optimization of queueing network production systems considering non-conforming products rework and departure. Journal of Advanced Mechanical Design, Systems, and Manufacturing 12:2, pages JAMDSM0052-JAMDSM0052.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.