175
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

On an IC wire bonding machine production–inventory problem with time value of money

, , &
Pages 2431-2453 | Received 01 Jun 2015, Accepted 07 Jul 2016, Published online: 02 Aug 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Junlong Chen, Zijun Zhang & Feng Wu. (2021) A data-driven method for enhancing the image-based automatic inspection of IC wire bonding defects. International Journal of Production Research 59:16, pages 4779-4793.
Read now

Articles from other publishers (3)

Yinfeng Xu, Rongteng Zhi, Feifeng Zheng & Ming Liu. (2021) Parallel Machine Scheduling with Due Date-to-Deadline Window, Order Sharing and Time Value of Money. Asia-Pacific Journal of Operational Research 39:02.
Crossref
Rongteng Zhi, Yinfeng Xu & Feifeng Zheng. (2019) Single Machine Scheduling Considering Time Value of Money. IFAC-PapersOnLine 52:13, pages 887-892.
Crossref
Dezhi Su, Changcheng Wang, Dan Zhao, Yucheng Niu, Quanwen Wang & Peijie Guan. (2018) Study of capillary tip states on the reliability of Al wire bonding in microelectronic package. Study of capillary tip states on the reliability of Al wire bonding in microelectronic package.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.