335
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

, &
Pages 3092-3109 | Received 28 Oct 2015, Accepted 27 Sep 2016, Published online: 11 Oct 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Chu A. My, Chi Hieu Le, Michael Packianather & Erik L.J. Bohez. (2019) Novel robot arm design and implementation for hot forging press automation. International Journal of Production Research 57:14, pages 4579-4593.
Read now
Chelliah Sriskandarajah & Bala Shetty. (2018) A review of recent theoretical development in scheduling dual-gripper robotic cells. International Journal of Production Research 56:1-2, pages 817-847.
Read now

Articles from other publishers (18)

Li Qingxiang, Zhao Xiaofei, He Yude & Yin Shaojun. (2023) INEH-VNS Algorithm Solved Automatic Production System Scheduling Problem under Just-in-Time Environment. Journal of Applied Mathematics 2023, pages 1-17.
Crossref
TaiRan Song, Yan Qiao, NaiQi Wu, YunFang He & SiWei Zhang. (2023) Implementation of Novel Scheduling Methods for Dual-arm Cluster Tools with Multiple-time Reentrant flows based on Petri Nets. Implementation of Novel Scheduling Methods for Dual-arm Cluster Tools with Multiple-time Reentrant flows based on Petri Nets.
Qingxiang Li, Xiaofei Zhao & Yude He. (2023) Research on solution property of automatic production system scheduling problem under just-in-time environment. Research on solution property of automatic production system scheduling problem under just-in-time environment.
Jun-Ho Lee & Hyun-Jung Kim. (2023) The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools. IEEE Transactions on Automation Science and Engineering 20:4, pages 2668-2677.
Crossref
Qinghua Zhu, Hongpeng Li, Cong Wang & Yan Hou. (2023) Scheduling a Single-ARM Multi-Cluster Tool with a Condition-Based Cleaning Operation. IEEE/CAA Journal of Automatica Sinica 10:10, pages 1965-1983.
Crossref
Hong-Yeon Kim, Jun-Ho Lee & Hyun-Jung Kim. (2023) Cycle Planning for Concurrent Processing in a Dual-Armed Cluster Tool. Cycle Planning for Concurrent Processing in a Dual-Armed Cluster Tool.
Qinghua Zhu, Bin Li, Yan Hou, Hongpeng Li & Naiqi Wu. (2023) Scheduling Dual-Arm Multi-Cluster Tools With Regulation of Post-Processing Time. IEEE/CAA Journal of Automatica Sinica 10:8, pages 1730-1742.
Crossref
Tairan Song, Yan Qiao, Yunfang He, Naiqi Wu, Zhiwu Li & Bin Liu. (2023) Dual-Arm Cluster Tool Scheduling for Reentrant Wafer Flows. Electronics 12:11, pages 2411.
Crossref
Soroush Fatemi-Anaraki, Reza Tavakkoli-Moghaddam, Mehdi Foumani & Behdin Vahedi-Nouri. (2023) Scheduling of Multi-Robot Job Shop Systems in Dynamic Environments: Mixed-Integer Linear Programming and Constraint Programming Approaches. Omega 115, pages 102770.
Crossref
Tae-Eog Lee, Hyun-Jung Kim & Tae-Sun Yu. 2023. Springer Handbook of Automation. Springer Handbook of Automation 841 863 .
Hyun-Jung Kim & Jun-Ho Lee. (2022) Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning. IEEE Transactions on Automation Science and Engineering 19:2, pages 1120-1136.
Crossref
Bin Li, Qinghua Zhu, Yan Hou & Jiantie Zhou. (2021) Scheduling Single-Arm Multi-Cluster Tools With Regulation of Post-Processing Time. Scheduling Single-Arm Multi-Cluster Tools With Regulation of Post-Processing Time.
Qingyun Yu, Haolin Yang, Kuo-Yi Lin & Li Li. (2020) A self-organized approach for scheduling semiconductor manufacturing systems. Journal of Intelligent Manufacturing 32:3, pages 689-706.
Crossref
Hyun-Jung Kim & Jun-Ho Lee. (2018) Cyclic robot scheduling for 3D printer-based flexible assembly systems. Annals of Operations Research 298:1-2, pages 339-359.
Crossref
QingHua Zhu, MengChu Zhou, Yan Qiao, NaiQi Wu & Yan Hou. (2020) Multiobjective Scheduling of Dual-Blade Robotic Cells in Wafer Fabrication. IEEE Transactions on Systems, Man, and Cybernetics: Systems 50:12, pages 5015-5023.
Crossref
Hyun-Jung Kim & Jun-Ho Lee. (2019) Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules. IEEE Transactions on Automation Science and Engineering 16:2, pages 898-907.
Crossref
Fajun Yang, Naiqi Wu, Yan Qiao, Mengchu Zhou, Rong Su & Ting Qu. (2018) Petri Net-Based Efficient Determination of Optimal Schedules for Transport-Dominant Single-Arm Multi-Cluster Tools. IEEE Access 6, pages 355-365.
Crossref
QingHua Zhu, MengChu Zhou, Yan Qiao & NaiQi Wu. (2017) Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools. IEEE Transactions on Semiconductor Manufacturing 30:3, pages 261-269.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.