Dynamic response to demand variability for precast production rescheduling with multiple lines

&
Pages 5386-5401 | Received 07 May 2017, Accepted 01 Dec 2017, Published online: 03 Jan 2018

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Fuli Xiong, Siyuan Chen, Zongfang Ma & Linlin Li. (2023) Approximate model and algorithms for precast supply chain scheduling problem with time-dependent transportation times. International Journal of Production Research 61:7, pages 2057-2085.
Read now
Maroua Nouiri, Abdelghani Bekrar & Damien Trentesaux. (2020) An energy-efficient scheduling and rescheduling method for production and logistics systems†. International Journal of Production Research 58:11, pages 3263-3283.
Read now

Articles from other publishers (28)

Qiurui Liu, Yanfang Ma, Lin Chen, Witold Pedrycz, Mirosław J. Skibniewski & Zhen-Song Chen. (2024) Artificial intelligence for production, operations and logistics management in modular construction industry: A systematic literature review. Information Fusion 109, pages 102423.
Crossref
Zhu-Jun Wang, Yangyang Sun, Qin Su, Muhammet Deveci, Kannan Govindan, Mirosław J. Skibniewski & Zhen-Song Chen. (2024) Smart Contract Application in Resisting Extreme Weather Risks for the Prefabricated Construction Supply Chain: Prototype Exploration and Assessment. Group Decision and Negotiation.
Crossref
Wenqi Mao, Kexin Ran, Ting-Kwei Wang, Anyuan Yu, Hongyue Lv & Jieh-Haur Chen. (2024) An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Engineering, Construction and Architectural Management.
Crossref
Yiran Dan, Guiwen Liu, Chao Mao, Kaijian Li & Pengpeng Xu. (2024) Flowshop scheduling optimization for multi-shift precast production with on-time delivery. Engineering Applications of Artificial Intelligence 127, pages 107163.
Crossref
Máté Hegyháti, Krisztián Attila Bakon & Tibor Holczinger. (2023) Optimization with uncertainties: a scheduling example. Central European Journal of Operations Research 31:4, pages 1239-1263.
Crossref
Jingjing Wang & Huimin Liu. (2023) Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processes. Automation in Construction 154, pages 105030.
Crossref
Ruixue Zhang, Xueting Feng, Zefeng Mou & Yuanxin Zhang. (2023) Green optimization for precast production rescheduling based on disruption management. Journal of Cleaner Production 420, pages 138406.
Crossref
Cheng Fan, Deng Binchao & Yilin Yin. (2022) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management 30:7, pages 2991-3013.
Crossref
Xiaoyan Li, Xuedong Liang & Zhi Li. (2023) The Strategy of Strengthening Efficiency and Environmental Performance of Product Changeover in the Multiproduct Production System. SAGE Open 13:3.
Crossref
Chen Chen, Jinchi Han, Ziwen Liu & Robert Lee Kong Tiong. (2023) Flow shop scheduling of hybrid make-to-stock and make-to-order in a distributed precast concrete production system. Cleaner Logistics and Supply Chain 7, pages 100106.
Crossref
Achini Peiris, Felix Kin Peng Hui, Colin Duffield & Tuan Ngo. (2023) Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction 150, pages 104851.
Crossref
Jingfeng Chen & Xinnan Liu. (2023) GEP Algorithm-based Optimization Method for PCs Production Scheduling under Due Date Variation. GEP Algorithm-based Optimization Method for PCs Production Scheduling under Due Date Variation.
Liang Wang, Yueqiao Zhao & Xianfei Yin. (2023) Precast production scheduling in off-site construction: Mainstream contents and optimization perspective. Journal of Cleaner Production, pages 137054.
Crossref
Shuai Liu, Asif Mansoor, Ghulam Muhammad Ali, Ahmed Bouferguene & Mohamed Al-Hussein. 2023. Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022. Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022 473 491 .
Clyde Zhengdao Li, Shanyang Li, Xiao Li, Hengqin Wu, Bing Xiao, Vivian W. Y. Tam & Cornelia Asiedu-Kwakyewa. (2022) A Scientometric Review of Management of Prefabricated Construction from 2011–2021. Buildings 12:10, pages 1515.
Crossref
Mi Pan, Yi YangZhenjie ZhengWei Pan. (2022) Artificial Intelligence and Robotics for Prefabricated and Modular Construction: A Systematic Literature Review. Journal of Construction Engineering and Management 148:9.
Crossref
Tongguang Si, Hong Xian Li, Zhen Lei, Hexu Liu & SangHyeok Han. (2021) A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction. Advances in Civil Engineering 2021, pages 1-19.
Crossref
Boda Liu, Bin Yang, Jianzhuang Xiao, Dayu Zhu, Binghan Zhang, Zhichen Wang & Miaosi Dong. (2021) Review of Optimization Dynamically Applied in the Construction and the Application Potential of ICT. Sustainability 13:10, pages 5478.
Crossref
Yiran Dan, Guiwen Liu & Yan Fu. (2021) Optimized flowshop scheduling for precast production considering process connection and blocking. Automation in Construction 125, pages 103575.
Crossref
Zhaojing Wang, Yisheng LiuHao HuLei Dai. (2021) Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment. Journal of Construction Engineering and Management 147:4.
Crossref
Taehoon Kim, Yong-Woo Kim & Hunhee Cho. (2021) A simulation-based dynamic scheduling model for curtain wall production considering construction planning reliability. Journal of Cleaner Production 286, pages 124922.
Crossref
Junyoung Jang, Seungjun Ahn, Seung Hyun Cha, Kyeongwoon Cho, Choongwan Koo & Tae Wan Kim. (2021) Toward productivity in future construction: mapping knowledge and finding insights for achieving successful offsite construction projects. Journal of Computational Design and Engineering 8:1, pages 1-14.
Crossref
Juan Du, Peng Dong, Vijayan Sugumaran & Daniel Castro‐Lacouture. (2020) Dynamic decision support framework for production scheduling using a combined genetic algorithm and multiagent model. Expert Systems 38:1.
Crossref
Zhenmin Yuan, Yaning Qiao, Yaru Guo, Yaowu Wang, Chen Chen & Wenshun Wang. (2020) Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation. Advances in Civil Engineering 2020, pages 1-14.
Crossref
Taehoon Kim, Yong-woo Kim & Hunhee Cho. (2020) Dynamic production scheduling model under due date uncertainty in precast concrete construction. Journal of Cleaner Production 257, pages 120527.
Crossref
Zhaojing Wang, Tengyu Wang, Hao Hu, Jie Gong, Xu Ren & Qiying Xiao. (2020) Blockchain-based framework for improving supply chain traceability and information sharing in precast construction. Automation in Construction 111, pages 103063.
Crossref
Wen Jiang, Lanjun Wu & Yunzhong Cao. (2020) Multiple Precast Component Orders Acceptance and Scheduling. Mathematical Problems in Engineering 2020, pages 1-15.
Crossref
Zhaojing WangHao HuJie Gong. (2018) Modeling Worker Competence to Advance Precast Production Scheduling Optimization. Journal of Construction Engineering and Management 144:11.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.