559
Views
26
CrossRef citations to date
0
Altmetric
Research Article

Robust scheduling for a two-stage assembly shop with scenario-dependent processing times

, ORCID Icon, , ORCID Icon, &
Pages 5372-5387 | Received 20 Jan 2020, Accepted 29 May 2020, Published online: 22 Jun 2020

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Duo Wang & Junlong Zhang. (2024) Flow shop scheduling with human–robot collaboration: a joint chance-constrained programming approach. International Journal of Production Research 62:4, pages 1297-1317.
Read now
Zied Bahroun, Abdulrahim Shamayleh, Rami As’ad & Rim Zakaria. (2023) A user-induced proactive-reactive scheduling tool for dynamic flow-shop environments. International Journal of Systems Science: Operations & Logistics 10:1.
Read now
Binghai Zhou & Zhaoxu He. (2023) A novel hybrid-load AGV for JIT-based sustainable material handling scheduling with time window in mixed-model assembly line. International Journal of Production Research 61:3, pages 796-817.
Read now
Zied Bahroun, Abdulrahim Shamayleh, Rami As’ad & Rim Zakaria. (2021) Flexible decision support tool for dynamic single machine scheduling problems. Journal of Industrial and Production Engineering 38:3, pages 213-238.
Read now

Articles from other publishers (22)

Ningwei Zhang, Yuli Zhang, Shiji Song & C. L. Philip Chen. (2024) A Review of Robust Machine Scheduling. IEEE Transactions on Automation Science and Engineering 21:2, pages 1323-1334.
Crossref
Jesús Isaac Vázquez-Serrano, Leopoldo Eduardo Cárdenas-Barrón, Julio C. Vicencio-Ortiz, Timothy Matis, Carlos Martín Gaitán-Mercado & Rodrigo E. Peimbert-García. (2024) Hybrid optimization and discrete-event simulation model to reduce waiting times in a primary health center. Expert Systems with Applications 238, pages 121920.
Crossref
Felix Grumbach, Anna Müller, Pascal Reusch & Sebastian Trojahn. (2022) Robust-stable scheduling in dynamic flow shops based on deep reinforcement learning. Journal of Intelligent Manufacturing 35:2, pages 667-686.
Crossref
David Anunay Alexander, Avishek Pandey & Sri Krishna Kumar. (2023) Mathematical models for multi-stage hybrid assembly flow-shop scheduling with preventive maintenance and release times. Computers & Industrial Engineering 186, pages 109716.
Crossref
Dvir Shabtay & Miri Gilenson. (2023) A state-of-the-art survey on multi-scenario scheduling. European Journal of Operational Research 310:1, pages 3-23.
Crossref
Mengke Sun, Zongyan Cai, Caoyuan Yang & Haonan Zhang. (2023) Digital twin for energy-efficient integrated process planning and scheduling. The International Journal of Advanced Manufacturing Technology 127:7-8, pages 3819-3837.
Crossref
Haimin Lu & Zhi Pei. (2023) A distributionally robust approach for the two-machine permutation flow shop scheduling. Annals of Operations Research.
Crossref
Win-Chin Lin, Xingong Zhang, Xinbo Liu, Kai-Xiang Hu, Shuenn-Ren Cheng, Ameni Azzouz & Chin-Chia Wu. (2023) Sequencing single machine multiple-class customer order jobs using heuristics and improved simulated annealing algorithms. RAIRO - Operations Research 57:3, pages 1417-1441.
Crossref
Pallab Banerjee, Sharmistha Roy, Anurag Sinha, Md. Mehedi Hassan, Shrikant Burje, Anupam Agrawal, Anupam Kumar Bairagi, Samah Alshathri & Walid El-Shafai. (2023) MTD-DHJS: Makespan-Optimized Task Scheduling Algorithm for Cloud Computing With Dynamic Computational Time Prediction. IEEE Access 11, pages 105578-105618.
Crossref
Luca Fumagalli, Elisa Negri, Laura Cattaneo, Lorenzo Ragazzini & Marco Macchi. 2023. Digital Transformation in Industry. Digital Transformation in Industry 267 279 .
Zhiren Long, Xianxiu Wen, Mei Lan & Yongjian Yang. (2021) Nursing rescheduling problem with multiple rescheduling methods under uncertainty. Complex & Intelligent Systems 8:6, pages 4557-4569.
Crossref
Lung-Yu Li, Jian-You Xu, Shuenn-Ren Cheng, Xingong Zhang, Win-Chin Lin, Jia-Cheng Lin, Zong-Lin Wu & Chin-Chia Wu. (2022) A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment. Mathematics 10:21, pages 4146.
Crossref
Chin-Chia Wu, Jatinder N. D. Gupta, Win-Chin Lin, Shuenn-Ren Cheng, Yen-Lin Chiu, Juin-Han Chen & Long-Yuan Lee. (2022) Robust Scheduling of Two-Agent Customer Orders with Scenario-Dependent Component Processing Times and Release Dates. Mathematics 10:9, pages 1545.
Crossref
Peide Liu, Ayad Hendalianpour, Mahnaz Fakhrabadi & Mohamdreza Feylizadeh. (2021) Integrating IVFRN-BWM and Goal Programming to Allocate the Order Quantity Considering Discount for Green Supplier. International Journal of Fuzzy Systems 24:2, pages 989-1011.
Crossref
Weiguo Liu, Xuyin Wang, Lu Li & Peizhen Zhao. (2022) A maintenance activity scheduling with time-and-position dependent deteriorating effects. Mathematical Biosciences and Engineering 19:11, pages 11756-11767.
Crossref
Jun-Hee Han & Ju-Yong Lee. (2021) Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints. Applied Sciences 11:23, pages 11240.
Crossref
Weiguo Liu, Xuyin Wang, Xiaoxiao Wang & Peizhen Zhao. (2021) Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights. Mathematical Problems in Engineering 2021, pages 1-8.
Crossref
Prita Meilanitasari & Seung-Jun Shin. (2021) A Review of Prediction and Optimization for Sequence-Driven Scheduling in Job Shop Flexible Manufacturing Systems. Processes 9:8, pages 1391.
Crossref
Peide Liu, Ayad Hendalianpour, Jafar Razmi & Mohamad Sadegh Sangari. (2021) A solution algorithm for integrated production-inventory-routing of perishable goods with transshipment and uncertain demand. Complex & Intelligent Systems 7:3, pages 1349-1365.
Crossref
Xiaokang Han, Wenzhou Yan & Mei Lu. (2021) Research on Reasoning concerning Emergency Measures for Industrial Project Scheduling Control. Advances in Civil Engineering 2021, pages 1-13.
Crossref
Chin-Chia Wu, Win-Chin Lin, Xin-Gong Zhang, Dan-Yu Bai, Yung-Wei Tsai, Tao Ren & Shuenn-Ren Cheng. (2020) Cloud theory-based simulated annealing for a single-machine past sequence setup scheduling with scenario-dependent processing times. Complex & Intelligent Systems 7:1, pages 345-357.
Crossref
Chin-Chia Wu, Danyu Bai, Xingong Zhang, Shuenn-Ren Cheng, Jia-Cheng Lin, Zong-Lin Wu & Win-Chin Lin. (2021) A robust customer order scheduling problem along with scenario-dependent component processing times and due dates. Journal of Manufacturing Systems 58, pages 291-305.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.