Thanyalak Boonkanok & Rawinkhan Srinon. (2021) Consumer Product Repetitive Production Planning with Color Sequence Wheel to Reduce Total Changeover Time. Consumer Product Repetitive Production Planning with Color Sequence Wheel to Reduce Total Changeover Time.
Yashar Ahmadov & Petri Helo. (2016) A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing. Annals of Operations Research 270:1-2, pages 5-24.
Crossref
Moritz Schröter, Ben Lütkehoff, Markus Fischer, Matthias Blum & Volker Stich. 2018. Advances in Production Management Systems. Production Management for Data-Driven, Intelligent, Collaborative, and Sustainable Manufacturing. Advances in Production Management Systems. Production Management for Data-Driven, Intelligent, Collaborative, and Sustainable Manufacturing
502
509
.
Liji Shen, Lars Mönch & Udo Buscher. (2013) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups. Journal of Scheduling 17:5, pages 471-487.
Crossref
A. Azadeh, S. F. Ghaderi, M. Dehghanbaghi & A. Dabbaghi. (2009) Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness. The International Journal of Advanced Manufacturing Technology 46:5-8, pages 431-444.
Crossref
Francesco Gentile & K.J. Rogers. (2009) Order release and dispatching in a sequence dependent job shop. Order release and dispatching in a sequence dependent job shop.
Monika Kofler, Stefan Wagner, Andreas Beham, Gabriel Kronberger & Michael Affenzeller. 2009. Computer Aided Systems Theory - EUROCAST 2009. Computer Aided Systems Theory - EUROCAST 2009
817
824
.
Robert M. Nauss. (2008) Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock. European Journal of Operational Research 187:3, pages 1268-1281.
Crossref
Shih-Wei Lin & Kuo-Ching Ying. (2006) Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics. The International Journal of Advanced Manufacturing Technology 34:11-12, pages 1183-1190.
Crossref
F. Fred Choobineh, Esmail Mohebbi & Hansen Khoo. (2006) A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times. European Journal of Operational Research 175:1, pages 318-337.
Crossref
Carlos Andrés, José Miguel Albarracı́n, Guillermina Tormo, Eduardo Vicens & José Pedro Garcı́a-Sabater. (2005) Group technology in a hybrid flowshop environment: A case study. European Journal of Operational Research 167:1, pages 272-281.
Crossref
Chung‐Hsing Yeh. (2005) Sequencing shop floor operations: a practical approach. Journal of Manufacturing Technology Management 16:5, pages 531-541.
Crossref
Pei-Chann Chang, Jih-Chang Hsieh & Yen-Wen Wang. (2003) Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times. Applied Soft Computing 3:2, pages 139-148.
Crossref
Manuel D. Rossetti & Keith J.A. Stanford. (2003) Group sequencing a PCB assembly system via an expected sequence dependent setup heuristic. Computers & Industrial Engineering 45:1, pages 231-254.
Crossref
Thomas Sjöland, Per Kreuger & Martin Aronsson. 2002. Computational Logic: Logic Programming and Beyond. Computational Logic: Logic Programming and Beyond
655
675
.
O. E. Charles-Owaba. (2017) Optimality Conditions to the Acyclic Travelling Salesman Problem. OPSEARCH 38:5, pages 531-542.
Crossref
R.I. McIntosh, S.J. Culley, A.R. Mileham & G.W. Owen. 2001. Improving Changeover Performance. Improving Changeover Performance
47
106
.
J. E. Beasley, M. Krishnamoorthy, Y. M. Sharaiha & D. Abramson. (2000) Scheduling Aircraft Landings—The Static Case. Transportation Science 34:2, pages 180-197.
Crossref
Steven Moss, Cheryl Dale & Glenn Brame. (2000) Sequence-Dependent Scheduling at Baxter International. Interfaces 30:2, pages 70-80.
Crossref
Ali Allahverdi, Jatinder N.D Gupta & Tariq Aldowaisan. (1999) A review of scheduling research involving setup considerations. Omega 27:2, pages 219-239.
Crossref
T. J. Suh & I. I. Esat. (1998) Solving large scale combinatorial optimisation problems based on a divide and conquer strategy. Neural Computing & Applications 7:2, pages 166-179.
Crossref
K.C. Tan & R. Narasimhan. (1997) Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach. Omega 25:6, pages 619-634.
Crossref
S.C. Kim & P.M. Bobrowski. (1997) Scheduling jobs with uncertain setup times and sequence dependency. Omega 25:4, pages 437-447.
Crossref
C.J. Liao & W.C. Yu. (1996) Sequencing heuristics for dependent setups in a continuous process industry. Omega 24:6, pages 649-659.
Crossref
F. Kolahan, M. Liang & M. Zuo. (1995) Solving the combined part sequencing and tool replacement problem for an automated machining center: A tabu search approach. Computers & Industrial Engineering 28:4, pages 731-743.
Crossref
ChinYao Low. (1995) Job shop scheduling heuristics for sequence dependent setups. Computers & Industrial Engineering 29:1-4, pages 279-283.
Crossref
SEUNG‐CHUL KIM & PAUL M. BOBROWSKI. (2009) EVALUATING ORDER RELEASE MECHANISMS IN A JOB SHOP WITH SEQUENCE‐DEPENDENT SETUP TIMES. Production and Operations Management 4:2, pages 163-180.
Crossref
C.O. Ozgur & J.R. Brown. (1995) A two-stage traveling salesman procedure for the single machine sequence-dependent scheduling problem. Omega 23:2, pages 205-219.
Crossref
P.B. Luh, Ling Gou, T. Odahara, M. Tsuji, K. Yoneda, T. Hasegawa & Y. Kyoya. (1995) Job shop scheduling with group-dependent setups, finite buffers, and long time horizon. Job shop scheduling with group-dependent setups, finite buffers, and long time horizon.
Paul A. Rubin & Gary L. Ragatz. (1995) Scheduling in a sequence dependent setup environment with genetic search. Computers & Operations Research 22:1, pages 85-99.
Crossref
Mohamad H. Al-Haboubi & Shokri Z. Selim. (1993) A sequencing problem in the weaving industry. European Journal of Operational Research 66:1, pages 65-71.
Crossref
Urban Wemmerlöv. (2007) Fundamental Insights into Part Family Scheduling: The Single Machine Case. Decision Sciences 23:3, pages 565-595.
Crossref
A. Gonthier & J.B. Cavaille. (1990) Production Change Multicriteria Optimization with Due-Date Constraints. IFAC Proceedings Volumes 23:3, pages 337-340.
Crossref
PJ O'Grady & C Harrison. (1988) Search based job scheduling and sequencing with setup times. Omega 16:6, pages 547-552.
Crossref
Shahrukh Adi Irani, Udaya Gunasena, Ali Davachi & E. Emory Enscore. (1988) Single machine setup-dependent sequencing using a setup complexity ranking scheme. Journal of Manufacturing Systems 7:1, pages 11-23.
Crossref
Sushil K Gupta & Jerzy Kyparisis. (1987) Single machine scheduling research. Omega 15:3, pages 207-227.
Crossref
Joseph ElGomayel & Vahid Nader. (1983) Optimization of machine setup and tooling using the principles of group technology. Computers & Industrial Engineering 7:3, pages 187-198.
Crossref
Dennis M. Walker & Richard A. Wysk. (1983) A procedure to determine the least cost purchased-part planned lead-time for items controlled by an MRP system. Computers & Industrial Engineering 7:4, pages 295-308.
Crossref