22
Views
30
CrossRef citations to date
0
Altmetric
Original Articles

Heuristics for determining output and work allocations in series flow lines

&
Pages 169-181 | Received 23 Sep 1977, Published online: 17 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (14)

Agostino Villa. (2002) Emerging trends in large-scale supply chain management. International Journal of Production Research 40:15, pages 3487-3498.
Read now
R. PIKE & G. E. MARTINJ. (1994) The bowl phenomenon in unpaced lines. International Journal of Production Research 32:3, pages 483-499.
Read now
F. S. HILLlER & K. C. SO. (1993) Some data for applying the bowl phenomenon to large production line systems. International Journal of Production Research 31:4, pages 811-822.
Read now
B. S. DOWNEY & M. S. LEONARD. (1992) Assembly line with flexible work-force. International Journal of Production Research 30:3, pages 469-483.
Read now
LISSA GALBRAITH, WILLIAMA. MILLER & TIMOTHYJ. GREENE. (1991) Pull system performance measures: a review of approaches for system design and control. Production Planning & Control 2:1, pages 24-35.
Read now
KENNETHR. BAKER, STEPHENG. POWELL & DAVIDF. PYKE. (1990) Technical note The performance of push and pull systems: a corrected analysis. International Journal of Production Research 28:9, pages 1731-1736.
Read now
DENNISE. BLUMENFELD. (1990) A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity. International Journal of Production Research 28:6, pages 1163-1182.
Read now
BHABAR. SARKER & JAMESA. FITZSIMMONS. (1989) The performance of push and pull systems: a simulation and comparative study†. International Journal of Production Research 27:10, pages 1715-1731.
Read now
SOUMEN GHOSH & ROGERJ. GAGNON. (1989) A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27:4, pages 637-670.
Read now
RAMIRO VILLEDA, RICHARD DUDEK & MILTONL. SMITH. (1988) Increasing the production rate of a just-in-time production system with variable operation times. International Journal of Production Research 26:11, pages 1749-1768.
Read now
S. SABOO & W. E. WILHELM. (1987) Description of certain correlation processes in flowlines. International Journal of Production Research 25:9, pages 1355-1392.
Read now
EGINHARDJ. MUTH & ABDULLAH ALKAFF. (1987) The bowl phenomenon revisited. International Journal of Production Research 25:2, pages 161-173.
Read now
A. MISHRA, D. ACHARYA, N. P. RAO & G. P. SASTRY. (1985) Composite stage effects in unbalancing of series production systems. International Journal of Production Research 23:1, pages 1-20.
Read now
E. KOENIGSBERG & J. MAMER. (1982) The analysis of production systems. International Journal of Production Research 20:1, pages 1-16.
Read now

Articles from other publishers (16)

Tom McNamara, Sabry Shaaban & Sarah Hudson. (2016) Fifty years of the bowl phenomenon. Journal of Manufacturing Systems 41, pages 1-7.
Crossref
Xianda Kong, Hisashi Yamamoto, Jing Sun & Masayuki MATSUI. (2016) <b>Optimal Worker Assignment Considering Workers Skill on </b><b>Different Task in Limited-Cycle Multiple Periods </b>. Innovation and Supply Chain Management 10:2, pages 61-67.
Crossref
Xianda Kong, Hisashi Yamamoto & Shiro Masuda. (2015) Worker assignment optimization under reset limited-cycled model with multiple periods &#x2014; Focus on worker's clever tasks. Worker assignment optimization under reset limited-cycled model with multiple periods &#x2014; Focus on worker's clever tasks.
Hisashi Yamamoto, Jing Sun & Masayuki Matsui. (2010) A study on limited-cycle scheduling problem with multiple periods. Computers & Industrial Engineering 59:4, pages 675-681.
Crossref
Nureddin Kırkavak & Cemal Dinçer. (1999) The general behavior of pull production systems: The allocation problems. European Journal of Operational Research 119:2, pages 479-494.
Crossref
Shimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen WarneckeShimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen Warnecke. 1997. Industrial Assembly. Industrial Assembly 259 311 .
Michael J. Magazine & Kathryn E. Stecke. (1996) Throughput for production lines with serial work stations and parallel service facilities. Performance Evaluation 25:3, pages 211-232.
Crossref
Kenneth R. Baker. 1993. Perspectives in Operations Management. Perspectives in Operations Management 321 339 .
John A. Buzacott & J. George Shanthikumar. (1992) Design of manufacturing systems using queueing models. Queueing Systems 12:1-2, pages 135-213.
Crossref
Kenneth R. Baker. (1992) Tightly-coupled production systems: Models, analysis, and insights. Journal of Manufacturing Systems 11:6, pages 385-400.
Crossref
SOUMEN GHOSH & ROGER J. GAGNON. 1991. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5 355 405 .
R.J. Gagnon & S. Ghosh. (1991) Assembly line research: Historical roots, research life cycles and future directions. Omega 19:5, pages 381-399.
Crossref
Stelios H. Zanakis, James R. Evans & Alkis A. Vazacopoulos. (1989) Heuristic methods and applications: A categorized survey. European Journal of Operational Research 43:1, pages 88-110.
Crossref
Kathryn E. Stecke & Thomas L. Morin. (1985) The optimality of balancing workloads in certain types of flexible manufacturing systems. European Journal of Operational Research 20:1, pages 68-82.
Crossref
G.M. Buxey. (1983) Operational research into mass production. European Journal of Operational Research 14:1, pages 18-30.
Crossref
Richard C. Wilson. Capacity Planning and Productivity—A Tutorial. Capacity Planning and Productivity—A Tutorial.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.