77
Views
42
CrossRef citations to date
0
Altmetric
Original Articles

The efficiency of balanced and unbalanced production lines

Pages 61-75 | Received 25 Jan 1977, Published online: 15 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (17)

Anthony L. Patti, Kevin Watson & John H. Blackstone$suffix/text()$suffix/text(). (2008) The shape of protective capacity in unbalanced production systems with unplanned machine downtime. Production Planning & Control 19:5, pages 486-494.
Read now
M. Caridi, R. Cigolini & V. Farina. (2006) Designing unbalanced paced lines: a conceptual model and an experimental campaign. Production Planning & Control 17:5, pages 464-479.
Read now
J. B. ATWATER & S. S. CHAKRAVORTY. (1996) The impact of restricting the flow of inventory in serial production systems. International Journal of Production Research 34:9, pages 2657-2669.
Read now
C.-M. LIU, S.-F. SU & C.-L. LIN. (1996) Predictive models for performance evaluation of serial production lines. International Journal of Production Research 34:5, pages 1279-1291.
Read now
C.-M. LIU & C.-L. LIN. (1994) Performance evaluation of unbalanced serial production lines. International Journal of Production Research 32:12, pages 2897-2914.
Read now
D. MIDDLETON. (1994) The stochastic flowshop makespan. Part II. Some general results for the unbuffered case. International Journal of Production Research 32:9, pages 2067-2081.
Read now
S. L. JOHNS & B. HON. (1993) Control mechanisms for stable lead times. International Journal of Production Research 31:2, pages 429-441.
Read now
K. C. SO. (1989) On the efficiency of unbalancing production lines. International Journal of Production Research 27:4, pages 717-729.
Read now
SOUMEN GHOSH & ROGERJ. GAGNON. (1989) A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27:4, pages 637-670.
Read now
NARUMOL UDOMKESMALEE & CARLOSF. DAGANZO. (1989) Impact of parallel processing on job sequences in flexible assembly systems. International Journal of Production Research 27:1, pages 73-89.
Read now
RAMIRO VILLEDA, RICHARD DUDEK & MILTONL. SMITH. (1988) Increasing the production rate of a just-in-time production system with variable operation times. International Journal of Production Research 26:11, pages 1749-1768.
Read now
WILLIAMW. THOMPSON$suffix/text()$suffix/text() & ROGERL. BURFORD. (1988) Some observations on the bowl phenomenon. International Journal of Production Research 26:8, pages 1367-1373.
Read now
EGINHARDJ. MUTH & ABDULLAH ALKAFF. (1987) The bowl phenomenon revisited. International Journal of Production Research 25:2, pages 161-173.
Read now
ARIF SUHAIL. (1983) Reliability and optimization considerations in a conveyor-paced assembly line system. International Journal of Production Research 21:5, pages 627-640.
Read now
RICHARDB. CHASE & KALYAN SINGHAL. (1981) An exploratory study of interrelationships among technological and operational variables in paced assembly lines. International Journal of Production Research 19:6, pages 703-708.
Read now

Articles from other publishers (25)

Frederik Ostermeier, Nikolai West & Jochen Deuse. 2023. Intelligent and Transformative Production in Pandemic Times. Intelligent and Transformative Production in Pandemic Times 419 431 .
Maximilian Johannes Schlüter & Frederik Ferid Ostermeier. (2022) Dynamic line balancing in unpaced mixed-model assembly lines: A problem classification. CIRP Journal of Manufacturing Science and Technology 37, pages 134-142.
Crossref
Tom McNamara, Sabry Shaaban, Abdelkader Sbihi & Zouhair Laarraf. (2021) The operating behaviour of unbalanced, unpaced merging assembly lines. RAIRO - Operations Research 55:1, pages 99-113.
Crossref
Miray Öner-Közen, Stefan Minner & Fabian Steinthaler. (2017) Efficiency of paced and unpaced assembly lines under consideration of worker variability – A simulation study. Computers & Industrial Engineering 111, pages 516-526.
Crossref
Irina Heimbach, Jörn Grahl & Franz Rothlauf. (2012) The effects of state-dependent human behavior on the design of a serial line. Zeitschrift für Betriebswirtschaft 82:7-8, pages 745-762.
Crossref
Sabry Shaaban, Tom McNamara & Sarah Hudson. (2012) Reliable and Unreliable Unpaced Production Lines with Unbalanced Operation Time Means – A Comparison. IFAC Proceedings Volumes 45:6, pages 413-419.
Crossref
Tom McNamara, Sabry Shaaban & Sarah Hudson. (2011) Unpaced production lines with three simultaneous imbalance sources. Industrial Management & Data Systems 111:9, pages 1356-1380.
Crossref
Ravindra Kumar, Abid Haleem, Suresh K. Garg & Rajesh K. Singh. (2017) Performance Optimization of an Imbalanced Flexible Manufacturing System Using Taguchi Approach. Global Journal of Flexible Systems Management 12:1-2, pages 81-89.
Crossref
Liming Liu, Xue-Ming Yuan & John J. Liu. (2004) Operational capacity allocation for unreliable module-based assembly systems. European Journal of Operational Research 155:1, pages 134-153.
Crossref
Fernando Bernardi de Souza, Antonio Freitas Rentes & Oswaldo Luiz Agostinho. (2002) A interdependência entre sistemas de controle de produção e critérios de alocação de capacidades. Gestão & Produção 9:2, pages 215-234.
Crossref
Nureddin Kırkavak & Cemal Dinçer. (1999) The general behavior of pull production systems: The allocation problems. European Journal of Operational Research 119:2, pages 479-494.
Crossref
Fernando Bernardi de Souza & Sílvio R. I. Pires. (1999) Análise e proposições sobre o balanceamento e uso de excesso de capacidade em recursos produtivos. Gestão & Produção 6:2, pages 111-126.
Crossref
Sameh M. Saad & Mike D. Byrne. (1998) Comprehensive simulation analysis of a flexible hybrid assembly system. Integrated Manufacturing Systems 9:3, pages 156-167.
Crossref
Satya S. Chakravorty & J. Brian Atwater. (1996) A comparative study of line design approaches for serial production systems. International Journal of Operations & Production Management 16:6, pages 91-108.
Crossref
Kenneth R. Baker. 1993. Perspectives in Operations Management. Perspectives in Operations Management 321 339 .
Dileep R. Sule & Wayne J. Norris. (1992) Manpower assignment strategies in serial production lines with limited personnel: Evaluation of pull-push rules. Computers & Industrial Engineering 22:3, pages 231-243.
Crossref
Kenneth R. Baker. (1992) Tightly-coupled production systems: Models, analysis, and insights. Journal of Manufacturing Systems 11:6, pages 385-400.
Crossref
Sedef Meral & Nesim Erkip. (1991) Simulation analysis of a JIT production line. International Journal of Production Economics 24:1-2, pages 147-156.
Crossref
SOUMEN GHOSH & ROGER J. GAGNON. 1991. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5 355 405 .
R.J. Gagnon & S. Ghosh. (1991) Assembly line research: Historical roots, research life cycles and future directions. Omega 19:5, pages 381-399.
Crossref
J.-T. Lim, S.M. Meerkov & F. Top. (1989) Analysis and synthesis of asynchronous, asymptotically reliable, asymptotically controllable serial production lines. Analysis and synthesis of asynchronous, asymptotically reliable, asymptotically controllable serial production lines.
Timothy L. Smunt & William C. Perkins. (2002) Stochastic unpaced line design: Review and further experimental results. Journal of Operations Management 5:3, pages 351-373.
Crossref
Kathryn E. Stecke & Thomas L. Morin. (1985) The optimality of balancing workloads in certain types of flexible manufacturing systems. European Journal of Operational Research 20:1, pages 68-82.
Crossref
Adam Wolisz. (1984) Production rate optimization in a two-stage system with finite intermediate storage. European Journal of Operational Research 18:3, pages 369-376.
Crossref
G.M. Buxey. (1983) Operational research into mass production. European Journal of Operational Research 14:1, pages 18-30.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.