49
Views
23
CrossRef citations to date
0
Altmetric
Original Articles

The effect of incompletion cost on line balancing with multiple manning of work stations

Pages 235-245 | Received 25 Apr 1983, Published online: 25 Jun 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

S. Ehsan Hashemi-Petroodi, Alexandre Dolgui, Sergey Kovalev, Mikhail Y. Kovalyov & Simon Thevenin. (2021) Workforce reconfiguration strategies in manufacturing systems: a state of the art. International Journal of Production Research 59:22, pages 6721-6744.
Read now
Marcus Ritt, Alysson M. Costa & Cristóbal Miralles. (2016) The assembly line worker assignment and balancing problem with stochastic worker availability. International Journal of Production Research 54:3, pages 907-922.
Read now
SUBHASHC. SARIN & ERDAL EREL. (1990) Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research 28:7, pages 1305-1316.
Read now
AmiyaK. Chakravarty & Avraham Shtub. (1986) TECHNICAL NOTE: Dynamic Manning of Long Cycle Assembly Lines With Learning Effect. IIE Transactions 18:4, pages 392-397.
Read now
J. M. WILSON. (1986) Formulation of a problem involving assembly lines with multiple manning of work stations. International Journal of Production Research 24:1, pages 59-63.
Read now

Articles from other publishers (18)

Elif KAYMAZ & Fatih ÇAVDUR. (2022) Montaj Hattı Dengelemede Yeniden İşleme İstasyonlarının Paralel Görevler için Kullanımının Matematiksel Programlama ve Simülasyon ile AnaliziAnalyzing the Use of Rework Stations for Parallel Tasks in Assembly Line Balancing via Mathematical Programming and Simulation. Politeknik Dergisi 25:1, pages 205-222.
Crossref
F. Cavdur & E. Kaymaz. (2020) A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks. International Journal of Production Management and Engineering 8:2, pages 111.
Crossref
Yılmaz Delice, Emel Kızılkaya Aydoğan, Uğur Özcan & Mehmet Sıtkı İlkay. (2014) A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing. Journal of Intelligent Manufacturing 28:1, pages 23-36.
Crossref
F. Tevhide Altekin, Z. Pelin Bayındır & Volkan Gümüşkaya. (2016) Remedial actions for disassembly lines with stochastic task times. Computers & Industrial Engineering 99, pages 78-96.
Crossref
Ehsan Nazarian & Jeonghan Ko. (2013) Robust manufacturing line design with controlled moderate robustness in bottleneck buffer time to manage stochastic inter-task times. Journal of Manufacturing Systems 32:2, pages 382-391.
Crossref
Olga Battaïa & Alexandre Dolgui. (2013) A taxonomy of line balancing problems and their solutionapproaches. International Journal of Production Economics 142:2, pages 259-277.
Crossref
Jeonghan Ko & S. Jack Hu. (2009) Manufacturing System Design Considering Stochastic Product Evolution and Task Recurrence. Journal of Manufacturing Science and Engineering 131:5.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2008) Assembly line balancing: Which model to use when?. International Journal of Production Economics 111:2, pages 509-528.
Crossref
Nils Boysen & Malte Fliedner. (2008) A versatile algorithm for assembly line balancing. European Journal of Operational Research 184:1, pages 39-56.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) A classification of assembly line balancing problems. European Journal of Operational Research 183:2, pages 674-693.
Crossref
Rita Gamberini, Andrea Grassi & Bianca Rimini. (2006) A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics 102:2, pages 226-243.
Crossref
Christian Becker & Armin Scholl. (2006) A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168:3, pages 694-715.
Crossref
Nils Boysen & Malte Fliedner. (2006) Ein flexibler zweistufiger Graphen-Algorithmus zur Fließbandabstimmung mit praxisrelevanten Nebenbedingungen. Journal of Business Economics 76:1, pages 55-78.
Crossref
Subhash C. Sarin, Erdal Erel & Ezey M. Dar-El. (1999) A methodology for solving single-model, stochastic assembly line balancing problem. Omega 27:5, pages 525-535.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1997. Produktionsplanung. Produktionsplanung 181 278 .
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1993. Produktionsplanung. Produktionsplanung 171 248 .
Stelios H. Zanakis, James R. Evans & Alkis A. Vazacopoulos. (1989) Heuristic methods and applications: A categorized survey. European Journal of Operational Research 43:1, pages 88-110.
Crossref
Shigeji Miyazaki & Hiroshi Ohta. 1988. System Modelling and Optimization. System Modelling and Optimization 681 690 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.