93
Views
93
CrossRef citations to date
0
Altmetric
Original Articles

Review of operator/machine interference models

&
Pages 129-151 | Received 01 Mar 1984, Published online: 24 Oct 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (19)

S. Ehsan Hashemi-Petroodi, Alexandre Dolgui, Sergey Kovalev, Mikhail Y. Kovalyov & Simon Thevenin. (2021) Workforce reconfiguration strategies in manufacturing systems: a state of the art. International Journal of Production Research 59:22, pages 6721-6744.
Read now
Tariq Tashtoush, Azmi Alazzam & Ali Rodan. (2020) Utilizing fuzzy logic controller in manufacturing facilities design: Machine and operator allocation. Cogent Engineering 7:1.
Read now
Gang He, Wenqing Wu & Yuanyuan Zhang. (2019) Performance analysis of machine repair system with single working vacation. Communications in Statistics - Theory and Methods 48:22, pages 5602-5620.
Read now
Orçun Dayıbaş, Halit Oğuztüzün & Levent Yılmaz. (2019) On the use of model-driven engineering principles for the management of simulation experiments. Journal of Simulation 13:2, pages 83-95.
Read now
Dong-Yuh Yang & Ya-Dun Chang. (2018) Sensitivity analysis of the machine repair problem with general repeated attempts. International Journal of Computer Mathematics 95:9, pages 1761-1774.
Read now
Louis-Philippe Kerkhove & Mario Vanhoucke. (2014) Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics. International Journal of Production Research 52:9, pages 2630-2653.
Read now
Kan Wu. (2014) Classification of queueing models for a workstation with interruptions: a review. International Journal of Production Research 52:3, pages 902-917.
Read now
M. Colledani, M. Ekvall, T. Lundholm, P. Moriggi, A. Polato & T. Tolio. (2010) Analytical methods to support continuous improvements at Scania. International Journal of Production Research 48:7, pages 1913-1945.
Read now
F. J. F. Silva & D. S. de la Figuera. (2007) A capacitated facility location problem with constrained backlogging probabilities. International Journal of Production Research 45:21, pages 5117-5134.
Read now
Shih-Pin Chen. (2006) Non-linear programming for the optimization of machine repair problems in fuzzy environments. Engineering Optimization 38:7, pages 789-799.
Read now
C. J. MALMBORG. (1996) Machine scheduling models in environmentally focused chemical manufacturing. International Journal of Production Research 34:1, pages 209-225.
Read now
C. KOULAMAS. (1995) Application of ELSP solution techniques to the deterministic robotic scheduling problem. International Journal of Production Research 33:10, pages 2933-2944.
Read now
C. KOULAMAS & E. IAKOVOU. (1995) Machining economics with machine interference considerations. International Journal of Production Research 33:1, pages 71-78.
Read now
C. P. KOULAMAS. (1992) Lot sizing and machining economics: the multi-item, multi-stage cost minimization case. International Journal of Production Research 30:10, pages 2265-2280.
Read now
C. P. KOULAMAS. (1992) A bi-criterion algorithm for minimizing machine interference and reducing job waiting time. International Journal of Systems Science 23:7, pages 1229-1235.
Read now
M.N. Gopalan & N. Anantharaman. (1991) Stochastic analysis of machine interference of a production system wit[hdot] identical machines. Stochastic Analysis and Applications 9:1, pages 41-52.
Read now
CHRISTOSP. KOULAMAS & MILTONL. SMITH. (1988) Look-ahead scheduling for minimizing machine interference. International Journal of Production Research 26:9, pages 1523-1533.
Read now
SALIGRAMAR. AGNIHOTHRI. (1988) A Mean Value Analysis of the Travelling Repairman Problem. IIE Transactions 20:2, pages 223-230.
Read now

Articles from other publishers (74)

Haofang Feng, Sheng Hao Zhang & Yong Zhang. (2023) Managing production-inventory-maintenance systems with condition monitoring. European Journal of Operational Research 310:2, pages 698-711.
Crossref
Taho Yang, Mei-Chuan Wang & Yiyo Kuo. (2023) A study of the operator assignment problem in powder-coating processing using simulation optimization. Robotic Intelligence and Automation 43:3, pages 358-369.
Crossref
Paulo Ghinato, Susumu Fujii & Hiroshi Morita. (2023) TWO EFFECTIVE METHODS FOR WORKFORCE REDUCTION UNDER LEAN PRODUCTION PRINCIPLES. TWO EFFECTIVE METHODS FOR WORKFORCE REDUCTION UNDER LEAN PRODUCTION PRINCIPLES.
Pedram Sahba, Barış Balcıog̃lu & Dragan Banjevic. (2015) The impact of disruption characteristics on the performance of a server. Annals of Operations Research 317:1, pages 239-252.
Crossref
R. Kalyanaraman & G. Janani. Finite population batch service queue with batch dependent service rate. Finite population batch service queue with batch dependent service rate.
Miroslav Šegvić, Štefica Mrvelj, Marko Matulin & Anita Domitrović. (2022) Closed Loop Airline Rotable Component Float Availability and Control: A Case Study. Transportation Research Procedia 64, pages 128-137.
Crossref
Hessam Bavafa, Sergei Savin & Christian Terwiesch. (2021) Customizing Primary Care Delivery Using E‐Visits. Production and Operations Management 30:11, pages 4306-4327.
Crossref
Maik J.A. Havinga & Bram de Jonge. (2020) Condition-based maintenance in the cyclic patrolling repairman problem. International Journal of Production Economics 222, pages 107497.
Crossref
S. Ehsan Hashemi-Petroodi, Simon Thevenin, Sergey Kovalev & Alexandre Dolgui. (2020) Operations management issues in design and control of hybrid human-robot collaborative manufacturing systems: a survey. Annual Reviews in Control 49, pages 264-276.
Crossref
Jau-Chuan Ke, Tzu-Hsin Liu & Dong-Yuh Yang. (2018) Modeling of machine interference problem with unreliable repairman and standbys imperfect switchover. Reliability Engineering & System Safety 174, pages 12-18.
Crossref
Ryu changnam & 윤봉규. (2018) A Model to analyze the performance of a repair system with correlated breakdown and repair. Korean Journal of Logistics 26:1, pages 1-12.
Crossref
Staunton Haynes, Jeffrey W. Herrmann & Paul Zimmerman. (2018) Using Discrete Event Simulation to Improve Aircraft Engine Reliability Forecasts. Using Discrete Event Simulation to Improve Aircraft Engine Reliability Forecasts.
Yanli Meng, Xiaodong Liu & Muyan Zhou. (2017) A novel model to determine the optimal number of servers in finite input source fuzzy queueing system. A novel model to determine the optimal number of servers in finite input source fuzzy queueing system.
Nilay Tanık Argon, Chao Deng & Vidyadhar G. Kulkarni. (2016) Optimal control of a single server in a finite-population queueing network. Queueing Systems 85:1-2, pages 149-172.
Crossref
Yossi Hadad & Baruch Keren. (2016) A revised method for allocating the optimum number of similar machines to operators. International Journal of Productivity and Performance Management 65:2, pages 223-244.
Crossref
Richard Hedman, Mukund Subramaniyan & Peter Almström. (2016) Analysis of Critical Factors for Automatic Measurement of OEE. Procedia CIRP 57, pages 128-133.
Crossref
Cheng-Dar Liou. (2015) Optimization analysis of the machine repair problem with multiple vacations and working breakdowns. Journal of Industrial & Management Optimization 11:1, pages 83-104.
Crossref
M. Concepción Ausín. 2014. Wiley StatsRef: Statistics Reference Online. Wiley StatsRef: Statistics Reference Online.
Marcello Colledani, Tullio Tolio, Anath Fischer, Benoit Iung, Gisela Lanza, Robert Schmitt & József Váncza. (2014) Design and management of manufacturing systems for production quality. CIRP Annals 63:2, pages 773-796.
Crossref
Yossi Hadad, Baruch Keren & Gregory Gurevich. (2013) A multinomial model for the machine interference problem with different service types and multiple operators. Computers & Industrial Engineering 66:2, pages 264-273.
Crossref
Ralf Gössinger & Michael Kaluzny. (2013) Release of maintenance jobs in a decentralized multi-stage production/maintenance system with continuous condition monitoring. Journal of Business Economics 83:7, pages 727-758.
Crossref
Pedram Sahba, Bariş Balciog̃lu & Dragan Banjevic. (2013) Analysis of the finite‐source multiclass priority queue with an unreliable server and setup time. Naval Research Logistics (NRL) 60:4, pages 331-342.
Crossref
R. Kalyanaraman. (2011) A single server batch service finite source queue with feedback. A single server batch service finite source queue with feedback.
A. Baki Engin. (2009) Using economic X control chart design methodology to estimate and optimize machine efficiency in the case of multimachine assignments. Applied Stochastic Models in Business and Industry 26:5, pages 513-534.
Crossref
A. Baki Engin. (2009) Comparative analysis for periodical and random servicing systems considering different working circumstances: A textile application. Journal of Manufacturing Systems 28:4, pages 89-97.
Crossref
María José Pardo & David de la Fuente. (2008) Optimal selection of the service rate for a finite input source fuzzy queuing system. Fuzzy Sets and Systems 159:3, pages 325-342.
Crossref
A. Baki˙ Engi˙n. (2008) Determination of optimum economic inspection by economic control chart design and by machine efficiency estimation: An application in weaving industry. Simulation Modelling Practice and Theory 16:1, pages 147-170.
Crossref
M. Concepción Ausín. 2007. Encyclopedia of Statistics in Quality and Reliability. Encyclopedia of Statistics in Quality and Reliability.
Lani Haque & Michael J. Armstrong. (2007) A survey of the machine interference problem. European Journal of Operational Research 179:2, pages 469-482.
Crossref
Seyed M. R. Iravani & Vijayalakshmi Krishnamurthy. (2007) Workforce Agility in Repair and Maintenance Environments. Manufacturing & Service Operations Management 9:2, pages 168-184.
Crossref
Seyed M. R. Iravani, Vijayalakshmi Krishnamurthy & Gary H. Chao. (2006) Optimal server scheduling in nonpreemptive finite-population queueing systems. Queueing Systems 55:2, pages 95-105.
Crossref
Taho Yang, Mu-Chen Chen & Chih-Ching Hung. (2007) Multiple attribute decision-making methods for the dynamic operator allocation problem. Mathematics and Computers in Simulation 73:5, pages 285-299.
Crossref
R. Shankar, P. Vijayaraghavan & T. Narendran. (2006) Modeling customer support performance in Indian IT hardware industry. Journal of Modelling in Management 1:3, pages 232-254.
Crossref
Shih-Pin Chen. (2006) A mathematical programming approach to the machine interference problem with fuzzy parameters. Applied Mathematics and Computation 174:1, pages 374-387.
Crossref
Taho Yang, Rong-Shean Lee, Mu-Chen Chen & Pangwei Chen. (2005) Queueing network model for a single-operator machine interference problem with external operations. European Journal of Operational Research 167:1, pages 163-178.
Crossref
Muh-Cherng Wu & Kuo-Cheng Fu. (2005) An operator staffing and assignment model for foundry fabs. The International Journal of Advanced Manufacturing Technology 26:11-12, pages 1429-1435.
Crossref
P.D. Jadhav & J.S. Smith. (2005) Analyzing Printed Circuit Board Assembly Lines Using a PCB Asembly Template. Analyzing Printed Circuit Board Assembly Lines Using a PCB Asembly Template.
Amir H. Abdekhodaee, Andrew Wirth & Heng Soon Gan. (2004) Equal processing and equal setup time cases of scheduling parallel machines with a single server. Computers & Operations Research 31:11, pages 1867-1889.
Crossref
Dug Hee Moon, Dae Kyoung Kim & Jong Yun Jung. (2004) An operator load-balancing problem in a semi-automatic parallel machine shop. Computers & Industrial Engineering 46:2, pages 355-362.
Crossref
Madhu Jain. (2017) N Policy for Redundant Repairable System with Additional Repairmen. OPSEARCH 40:2, pages 97-114.
Crossref
Ebru K. Bish. (2003) A multiple-crane-constrained scheduling problem in a container terminal. European Journal of Operational Research 144:1, pages 83-107.
Crossref
Heinrich Kuhn. 2003. Analysis and Modeling of Manufacturing Systems. Analysis and Modeling of Manufacturing Systems 155 179 .
Michael J. Armstrong. (2002) Age repair policies for the machine repair problem. European Journal of Operational Research 138:1, pages 127-141.
Crossref
Hung-Nan Chen & R. Dabbas. (2002) Modeling staffing requirements within a semiconductor manufacturing environment. Modeling staffing requirements within a semiconductor manufacturing environment.
Ki‐Young Jeong & Don T. Phillips. (2001) Operational efficiency and effectiveness measurement. International Journal of Operations & Production Management 21:11, pages 1404-1416.
Crossref
Ebru K. Bish, Thin‐Yin Leong, Chung‐Lun Li, Jonathan W. C. Ng & David Simchi‐Levi. (2001) Analysis of a new vehicle scheduling and location problem. Naval Research Logistics (NRL) 48:5, pages 363-385.
Crossref
Seyed M.R. Iravani, Izak Duenyas & Tava Lennon Olsen. (2000) A Production/Inventory System Subject to Failure with Limited Repair Capacity. Operations Research 48:6, pages 951-964.
Crossref
Nicholas G. Hall, Chris N. Potts & Chelliah Sriskandarajah. (2000) Parallel machine scheduling with a common server. Discrete Applied Mathematics 102:3, pages 223-243.
Crossref
Manish K. Govil & Michael C. Fu. (1999) Queueing theory in manufacturing: A survey. Journal of Manufacturing Systems 18:3, pages 214-240.
Crossref
Paulo Ghinato, Susumu Fujii & Hiroshi Morita. (1998) An Optimization Study on Man-Machine Assignment for Multifunction Workforce Utilization. IFAC Proceedings Volumes 31:26, pages 437-442.
Crossref
Moshe Eben-Chaime. (1998) Spreadsheet calculations for the machine interference queueing model. Computers & Industrial Engineering 34:2, pages 385-390.
Crossref
Madhu Jain. (1997) An (m, M) machine repair problem with spares and state dependent rates: A diffusion process approach. Microelectronics Reliability 37:6, pages 929-933.
Crossref
M. Mittler & C. Kern. (1997) Discrete-Time Approximation of the Machine Interference Problem with Generally Distributed Failure, Repair, and Walking Times. European Journal of Control 3:4, pages 254-267.
Crossref
Tayfur AltiokTayfur Altiok. 1997. Performance Analysis of Manufacturing Systems. Performance Analysis of Manufacturing Systems 66 117 .
Christos P. Koulamas. (1996) Scheduling two parallel semiautomatic machines to minimize machine interference. Computers & Operations Research 23:10, pages 945-956.
Crossref
Ho Woo Lee, Seung Hyun Yoon & Soon Seok Lee. (1995) Continuous approximations of the machine repair system. Applied Mathematical Modelling 19:9, pages 550-559.
Crossref
T. Park & H. Lee. 1995. Planning, Design, and Analysis of Cellular Manufacturing Systems. Planning, Design, and Analysis of Cellular Manufacturing Systems 181 202 .
Ping Yang. (1994) A unified algorithm for computing the stationary queue length distributions inM(k)/G/1/N and GI/M(k)/1/N queues. Queueing Systems 17:3-4, pages 383-401.
Crossref
U.C. Gupta & T.S.S.Srini Vasa Rao. (1994) A recursive method to compute the steady state probabilities of the machine interference model:. Computers & Operations Research 21:6, pages 597-605.
Crossref
M. Jain. (1993) Diffusion equation for GIx/G/r machine interference problem with spare machines. Microelectronics Reliability 33:9, pages 1415-1418.
Crossref
J. Sztrik & B.D. Bunday. (1993) Machine interference problem with a random environment. European Journal of Operational Research 65:2, pages 259-269.
Crossref
J. Sztrik & B.D. Bunday. (1993) Asymptotic analysis of the heterogeneous machine interference problem with random environments. Applied Mathematical Modelling 17:2, pages 105-110.
Crossref
Rajan Suri, Jerry L. Sanders & Manjunath Kamath. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory 199 286 .
Tapas K. Das & Martin A. Wortman. (1993) Analysis of asymmetric patrolling repairman systems. European Journal of Operational Research 64:1, pages 45-60.
Crossref
Christos P. Koulamas. (1992) Design of tool magazine and operational areas for a multi-tool machine. European Journal of Operational Research 63:2, pages 240-253.
Crossref
T. Takine & T. Hasegawa. (1992) A cyclic-service finite source model with round-robin scheduling. Queueing Systems 11:1-2, pages 91-108.
Crossref
Jangkab Noh, Sung-Jin Kang & Richard M. Feldman. (1992) A control policy for replacement involving two machines and one repairman. European Journal of Operational Research 56:3, pages 413-422.
Crossref
W. SchweizerW. Schweizer. 1992. Entwicklung eines interaktiven Simulators auf der Basis von Petri-Netzen zur Modellierung und Bewertung hybrider Montagestrukturen. Entwicklung eines interaktiven Simulators auf der Basis von Petri-Netzen zur Modellierung und Bewertung hybrider Montagestrukturen 121 132 .
Manjunath Kamath & Jerry L. Sanders. (1991) Modeling operator/workstation interference in asynchronous automatic assembly systems. Discrete Event Dynamic Systems 1:1, pages 93-124.
Crossref
Saligrama R. Agnihothri. (1991) Complementarity between the finite capacity and finite source queuing systems. Computers & Operations Research 18:2, pages 183-188.
Crossref
Robert J. Graves, Mickey R. Wilhelm, Leon F. McGinnis & Richard E. WardGunter P. Sharp, Kyung Il-Choe & Chang S. Yoon. 1991. Material Handling ’90. Material Handling ’90 317 341 .
Saligrama R. Agnihothri. (1989) Interrelationships between performance measures for the machine-repairman problem. Naval Research Logistics 36:3, pages 265-271.
Crossref
E. A. Elsayed & J. J. Norton. (1987) Machine interference in automated cells. Annals of Operations Research 9:1, pages 449-468.
Crossref
Stefan Creemers & Marc Lambrecht. (2007) Modeling a Healthcare System as a Queueing Network: The Case of a Belgian Hospital. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.