47
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling production activities in multi-stage batch manufacturing systems

Pages 315-328 | Received 01 Feb 1984, Published online: 02 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

M. Cheng, N.J. Mukherjee & S.C. Sarin. (2013) A review of lot streaming. International Journal of Production Research 51:23-24, pages 7023-7046.
Read now
Jen Huei Chang & Huan Neng Chiu. (2005) A comprehensive review of lot streaming. International Journal of Production Research 43:8, pages 1515-1536.
Read now
JOSEPH BUKCHIN & MICHAEL MASIN. (2004) Multi-objective lot splitting for a single product m-machine flowshop line. IIE Transactions 36:2, pages 191-202.
Read now
JOSEPH BUKCHIN, MICHAL TZUR & MICHAL JAFFE. (2002) Lot splitting to minimize average flow-time in a two-machine flow-shop. IIE Transactions 34:11, pages 953-970.
Read now
C. SRISKANDARAJAH & E. WAGNEUR. (1999) Lot streaming and scheduling multiple products in two-machine no-wait flowshops. IIE Transactions 31:8, pages 695-707.
Read now
P. J. EGBELU. (1993) Economic design of unit load-based FMSs employing AGVs for transport. International Journal of Production Research 31:12, pages 2753-2775.
Read now
GEORGE STEINER & WILLIAMG. TRUSCOTT. (1993) BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST. IIE Transactions 25:5, pages 90-97.
Read now
PIUSJ. EGBELU. (1991) Batch production time in a multi-stage system with material-handling consideration. International Journal of Production Research 29:4, pages 695-712.
Read now

Articles from other publishers (21)

Jiekun Song, Zeguo He, Lina Jiang, Zhicheng Liu & Xueli Leng. (2023) Synergy Management of a Complex Industrial Production System from the Perspective of Flow Structure. Systems 11:9, pages 453.
Crossref
Kenneth R. Baker & Dan Trietsch. 2018. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 341 372 .
Sanjoy Kumar Paul, Ruhul Sarker & Daryl Essam. (2015) A disruption recovery plan in a three-stage production-inventory system. Computers & Operations Research 57, pages 60-72.
Crossref
José A. Ventura & Suk-Hun Yoon. (2012) A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. Journal of Intelligent Manufacturing 24:6, pages 1185-1196.
Crossref
Taofeng Ye. (2012) Analysis on multi-stage lot streaming: The effect of transfer. Computers & Industrial Engineering 62:4, pages 1046-1054.
Crossref
Yossi Bukchin, Michael Masin & Rinat Kirshner. (2010) Modeling and analysis of multiobjective lot splitting for N ‐product M ‐machine flowshop lines . Naval Research Logistics (NRL) 57:4, pages 354-366.
Crossref
Kenneth R. Baker & Dan Trietsch. 2009. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 271 299 .
Jiyin Liu. (2008) Single-job lot streaming in m−1 two-stage hybrid flowshops. European Journal of Operational Research 187:3, pages 1171-1183.
Crossref
Suk-Hun Yoon & Jose A. Ventura. (2002) Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling. Computers & Operations Research 29:10, pages 1301-1315.
Crossref
Subodha Kumar, Tapan P Bagchi & C Sriskandarajah. (2000) Lot streaming and scheduling heuristics for m-machine no-wait flowshops. Computers & Industrial Engineering 38:1, pages 149-172.
Crossref
Sukran N. Kadipasaoglu, Wenguang Xiang & Basheer M. Khumawala. (1999) Batch scheduling in a multistage, multiproduct manufacturing system – an application. International Journal of Operations & Production Management 19:4, pages 421-437.
Crossref
Erdal Erel. (1998) A study on production lines with discrete batch WIP inventory transfer. International Journal of Production Economics 55:1, pages 71-85.
Crossref
Pius J. Egbelu. (1996) Integration of operation routing and economic production quantity decisions in batch manufacturing systems. European Journal of Operational Research 88:3, pages 446-463.
Crossref
C. Saygin, S.E. Kiliç, T. Tóth & F. Erdélyi. (1995) On Scheduling Approaches of Flexible Manufacturing Systems: Gap Between Theory and Practice. IFAC Proceedings Volumes 28:24, pages 61-66.
Crossref
R.G. Vickson. (1995) Optimal lot streaming for multiple products in a two-machine flow shop. European Journal of Operational Research 85:3, pages 556-575.
Crossref
C. Sriskandarajah & E. Wagneur. (1995) Lot streaming of a single product in two-machine no-wait flowshops. Lot streaming of a single product in two-machine no-wait flowshops.
C.A. Glass, J.N.D. Gupta & C.N. Potts. (1994) Lot streaming in three-stage production processes. European Journal of Operational Research 75:2, pages 378-394.
Crossref
Shanthakumar Palaniswami & Lawrence Jenicke. (1992) A Knowledge‐based Simulation System for Manufacturing Scheduling. International Journal of Operations & Production Management 12:11, pages 4-14.
Crossref
Robert J. Graves, Mickey R. Wilhelm, Leon F. McGinnis & Richard E. WardPius J. Egbelu. 1991. Material Handling ’90. Material Handling ’90 35 55 .
S.K. Goyal & A. Gunasekaran. (1990) Multi-stage production-inventory systems. European Journal of Operational Research 46:1, pages 1-20.
Crossref
William G. Truscott. (2002) Production scheduling with capacity‐constrained transportation activities. Journal of Operations Management 6:3-4, pages 333-348.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.