Meng Xu, Yi Mei, Fangfang Zhang & Mengjie Zhang. (2024) Genetic Programming and Reinforcement Learning on Learning Heuristics for Dynamic Scheduling: A Preliminary Comparison. IEEE Computational Intelligence Magazine 19:2, pages 18-33.
Crossref
Stéphane Dauzère-Pérès, Junwen Ding, Liji Shen & Karim Tamssaouet. (2024) The flexible job shop scheduling problem: A review. European Journal of Operational Research 314:2, pages 409-432.
Crossref
Wenqiang Zhang, Guanwei Xiao, Mitsuo Gen, Huili Geng, Xiaomeng Wang, Miaolei Deng & Guohui Zhang. (2024) Enhancing multi-objective evolutionary algorithms with machine learning for scheduling problems: recent advances and survey. Frontiers in Industrial Engineering 2.
Crossref
Anthony Bagherian, Gulshan Chauhan, Arun Lal Srivastav & Rajiv Kumar Sharma. (2024) Evaluating the Ranking of Performance Variables in Flexible Manufacturing System through the Best-Worst Method. Designs 8:1, pages 12.
Crossref
Wenqiang Zhang, Huili Geng, Xuan Bao, Mitsuo Gen, Guohui Zhang & Miaolei Deng. 2024. Bio-Inspired Computing: Theories and Applications. Bio-Inspired Computing: Theories and Applications
50
60
.
Lísia Peroza Ruiz & Adelano Esposito. 2024. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems
641
650
.
Bin Jiang, Yajie Ma, Lijun Chen, Binda Huang, Yuying Huang & Li Guan. (2023) A Review on Intelligent Scheduling and Optimization for Flexible Job Shop. International Journal of Control, Automation and Systems 21:10, pages 3127-3150.
Crossref
Yun-Wen Chen, Wei-Hao Su & Kai-Ying Chen. (2023) The Academic Development Trajectories and Applications of Flexible Manufacturing Systems Based on Main Path Analysis Method. Processes 11:4, pages 1297.
Crossref
Esther Alvarez & F. Javier Zubillaga. (2023) A FRAMEWORK FOR PRODUCTION PLANNING AND SCHEDULING IN FMC. A FRAMEWORK FOR PRODUCTION PLANNING AND SCHEDULING IN FMC.
Kanchan D. Ganvir & Rakesh Kumar Jain. (2022) A Perspective of Flexible Manufacturing System in Manufacturing Sectors. Journal of Advanced Manufacturing Systems 21:04, pages 763-795.
Crossref
Giovanni Lugaresi, Ettore Lanzarone, Nicla Frigerio & Andrea Matta. (2020) A robust cardinality-constrained model to address the machine loading problem. Robotics and Computer-Integrated Manufacturing 62, pages 101883.
Crossref
Xinyu Li & Liang GaoXinyu Li & Liang Gao. 2020. Effective Methods for Integrated Process Planning and Scheduling. Effective Methods for Integrated Process Planning and Scheduling
17
45
.
Jin Xie, Liang Gao, Kunkun Peng, Xinyu Li & Haoran Li. (2019) Review on flexible job shop scheduling. IET Collaborative Intelligent Manufacturing 1:3, pages 67-77.
Crossref
K. C. Bhosale & P. J. Pawar. (2018) Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA). Flexible Services and Manufacturing Journal 31:2, pages 381-423.
Crossref
Kritika Gaur, Indu & Vivek Chawla. 2019. Harmony Search and Nature Inspired Optimization Algorithms. Harmony Search and Nature Inspired Optimization Algorithms
697
705
.
Giovanni Lugaresi, Ettore Lanzarone, Nicola Frigerio & Andrea Matta. (2017) A Cardinality-constrained Approach for Robust Machine Loading Problems. Procedia Manufacturing 11, pages 1718-1725.
Crossref
Ruchir Santuka, Siba Sankar Mahapatra, Prasant Ranjan Dhal & Antaryami Mishra. (2015) An Improved Particle Swarm Optimization Approach for Solving Machine Loading Problem in Flexible Manufacturing System. Journal of Advanced Manufacturing Systems 14:03, pages 167-187.
Crossref
Tamer F. Abdelmaguid. (2015) A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times. Applied Mathematics and Computation 260, pages 188-203.
Crossref
Ranbir Singh, Rajender Singh & B. K. Khan. (2015) A Critical Review of Machine Loading Problem in Flexible Manufacturing System. World Journal of Engineering and Technology 03:04, pages 271-290.
Crossref
Paolo Priore, Alberto Gómez, Raúl Pino & Rafael Rosillo. (2014) Dynamic scheduling of manufacturing systems using machine learning: An updated review. Artificial Intelligence for Engineering Design, Analysis and Manufacturing 28:1, pages 83-97.
Crossref
Shashikant Burnwal & Sankha Deb. (2012) Scheduling optimization of flexible manufacturing system using cuckoo search-based approach. The International Journal of Advanced Manufacturing Technology 64:5-8, pages 951-959.
Crossref
Rhythm Suren Wadhwa. (2011) Bee Colony Algorithm application for manipulating metalcastings in SME. Bee Colony Algorithm application for manipulating metalcastings in SME.
Umi Kalsom Yusof, Rahmat Budiarto, Ibrahim Venkat & Safaai Deris. (2011) Machine Loading Optimization in Flexible Manufacturing System Using a Hybrid of Bio-inspired and Musical-Composition Approach. Machine Loading Optimization in Flexible Manufacturing System Using a Hybrid of Bio-inspired and Musical-Composition Approach.
Nitesh Khilwani, J. A. Harding & Nishikant Mishra. 2011. Evolutionary Computing in Advanced Manufacturing. Evolutionary Computing in Advanced Manufacturing
123
150
.
Subhash Wadhwa, Ajay Singholi & Mohammed Ali. (2017) Evaluating the Effect of Part-mix and Routing Flexibility on FMS Performance. Global Journal of Flexible Systems Management 11:4, pages 17-23.
Crossref
P. Praveen & Boppana V. Chowdary. (2017) A Real Time Mechanism for Operation Assignment in a Flexible Manufacturing System: A Combined Operations Splitting and Balanced Workload Approach. Global Journal of Flexible Systems Management 10:4, pages 23-32.
Crossref
Selin Özpeynirci & Meral Azizoğlu. (2009) Bounding approaches for operation assignment and capacity allocation problem in flexible manufacturing systems. Computers & Operations Research 36:9, pages 2531-2540.
Crossref
N. Suresh Kumar & R. Sridharan. (2009) Simulation modelling and analysis of part and tool flow control decisions in a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing 25:4-5, pages 829-838.
Crossref
S. Wadhwa, Yves Ducq, Mohammed Ali & Anuj Prakash. (2017) Performance Analysis of a Flexible Manufacturing System. Global Journal of Flexible Systems Management 10:3, pages 23-34.
Crossref
Sandhyarani Biswas & S. S. Mahapatra. (2007) Modified particle swarm optimization for solving machine-loading problems in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 39:9-10, pages 931-942.
Crossref
M. Saravanan & A. Noorul Haq. (2007) Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 38:9-10, pages 978-986.
Crossref
Anoop Prakash, Nitesh Khilwani, M.K. Tiwari & Yuval Cohen. (2008) Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems. Advances in Engineering Software 39:3, pages 219-232.
Crossref
M.K. Tiwari, J. Saha & S.K. Mukhopadhyay. (2008) Part-selection and machine-loading problems in a flexible manufacturing system environment: a heuristic approach based on reallocation paradigm. International Journal of Computer Applications in Technology 32:2, pages 142.
Crossref
Suresh Kumar N & R. Sridharan. (2007) Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems. Robotics and Computer-Integrated Manufacturing 23:4, pages 361-370.
Crossref
Michael Zapf, Ute Lindheimer & Armin Heinzl. (2006) The myth of accelerating business processes through parallel job designs. Information Systems and e-Business Management 5:2, pages 117-137.
Crossref
Huei Chuen Huang, Chulung Lee & Zhiyong Xu. 2007. Container Terminals and Cargo Systems. Container Terminals and Cargo Systems
291
313
.
Chun Wang, Kewei Li, Hamada Ghenniwa, Weiming Shen & Ying Wang. 2007. Collaborative Product Design and Manufacturing Methodologies and Applications. Collaborative Product Design and Manufacturing Methodologies and Applications
175
199
.
M. K. Tiwari, J. Saha & S. K. Mukhopadhyay. (2006) Heuristic solution approaches for combined-job sequencing and machine loading problem in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 31:7-8, pages 716-730.
Crossref
M.K. Tiwari, S. Kumar, S. Kumar, Prakash & R. Shankar. (2006) Solving Part-Type Selection and Operation Allocation Problems in an FMS: An Approach Using Constraints-Based Fast Simulated Annealing Algorithm. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 36:6, pages 1170-1184.
Crossref
Huei Chuen Huang, Chulung Lee & Zhiyong Xu. (2006) The workload balancing problem at aircargo terminals. OR Spectrum 28:4, pages 705-727.
Crossref
N. Nagarjuna, O. Mahesh & K. Rajagopal. (2006) A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing 22:4, pages 342-352.
Crossref
A K Choudhary, M K Tiwari & J A Harding. (2006) Part Selection and Operation-Machine Assignment in a Flexible Manufacturing System Environment: A Genetic Algorithm with Chromosome Differentiation-Based Methodology. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:5, pages 677-694.
Crossref
Paolo Priore, David de la Fuente, Javier Puente & José Parreño. (2006) A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems. Engineering Applications of Artificial Intelligence 19:3, pages 247-255.
Crossref
Hans Corsten, Ralf Gössinger & Norbert Wolf. (2005) Flexibility-driven order releases in job-shop production. Technovation 25:8, pages 815-830.
Crossref
J. Jerald, P. Asokan, G. Prabaharan & R. Saravanan. (2004) Scheduling optimisation of flexible manufacturing systems using particle swarm optimisation algorithm. The International Journal of Advanced Manufacturing Technology 25:9-10, pages 964-971.
Crossref
Chun Wang, H. Ghenniwa & Weiming Shen. (2005) Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities. Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities.
Felix T.S. Chan & H.K. Chan. (2004) Analysis of dynamic control strategies of an FMS under different scenarios. Robotics and Computer-Integrated Manufacturing 20:5, pages 423-437.
Crossref
Rahul Swarnkar & M.K. Tiwari. (2004) Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robotics and Computer-Integrated Manufacturing 20:3, pages 199-209.
Crossref
F.T.S. Chan, R. Swarnkar & M.K. Tiwari. (2004) A random search approach to the machine loading problem of an FMS. A random search approach to the machine loading problem of an FMS.
F T S Chan. (2005) The effects of scheduling flexibility on the performance of a flexible manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 217:7, pages 899-918.
Crossref
Zubair M. Mohamed, Mohamed A. Youssef & Faizul Huq. (2001) The impact of machine flexibility on the performance of flexible manufacturing systems. International Journal of Operations & Production Management 21:5/6, pages 707-742.
Crossref
Gideon Halevi. 2001. Handbook of Production Management Methods. Handbook of Production Management Methods
59
310
.
Shiu Hong Choi & James Siu Lung Lee. (2000) Operational decisions for minimization of penalty cost in non‐pre‐emptive FMS. Integrated Manufacturing Systems 11:5, pages 311-320.
Crossref
Barouch Matzliach & Michal Tzur. (2000) Storage management of items in two levels of availability. European Journal of Operational Research 121:2, pages 363-379.
Crossref
Elizabeth Maria Klippel, Arlindo Gomes de Alvarenga & Francisco José Negreiros Gomes. (1999) A two‐phase procedure for cell formation in manufacturing systems. Integrated Manufacturing Systems 10:6, pages 367-375.
Crossref
Piero Persi, Walter Ukovich, Raffaele Pesenti & Marino Nicolich. (1999) A hierarchic approach to production planning and scheduling of a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing 15:5, pages 373-385.
Crossref
Zubair M. Mohamed, Ashok Kumar & Jaideep Motwani. (1999) An improved part grouping model for minimizing makespan in FMS. European Journal of Operational Research 116:1, pages 171-182.
Crossref
Tamas Koltai & Sebastian Lozano. (1998) Sensitivity calculation of the throughput of an FMS with respect to the routing mix using perturbation analysis. European Journal of Operational Research 105:3, pages 483-493.
Crossref
Peter B. Luh. 1998. Control Problems in Robotics and Automation. Control Problems in Robotics and Automation
227
243
.
Michael HöckMichael Höck. 1998. Produktionsplanung und -steuerung einer flexiblen Fertigung. Produktionsplanung und -steuerung einer flexiblen Fertigung
84
244
.
AMIYA K. CHAKRAVARTY. (1997) A MODEL FOR SWITCHING DISPATCHING RULES IN REAL TIME IN A FLEXIBLE MANUFACTURING CELL. Production and Operations Management 6:4, pages 398-418.
Crossref
Zubair M Mohamed & John J Bernardo. (1997) Tool planning models for flexible manufacturing systems. European Journal of Operational Research 103:3, pages 497-514.
Crossref
Jiyin Liu & B.L. MacCarthy. (1997) A global MILP model for FMS scheduling. European Journal of Operational Research 100:3, pages 441-453.
Crossref
T.J. Sawik. (1997) An interactive approach to bicriterion loading of a flexible assembly system. Mathematical and Computer Modelling 25:6, pages 71-83.
Crossref
Zubair M. Mohamed. (1996) A flexible approach to (re)configure Flexible Manufacturing Cells. European Journal of Operational Research 95:3, pages 566-576.
Crossref
K. Raghava Rau & O. V. Krishnaiah Chetty. (1996) Production planning of FMS under tool magazine constraints: A dynamic programming approach. The International Journal of Advanced Manufacturing Technology 11:5, pages 366-371.
Crossref
Bharatendu Srivastava & Wun-Hwa Chen. (1996) Batching in production planning for flexible manufacturing systems. International Journal of Production Economics 43:2-3, pages 127-137.
Crossref
Alessandro Agnetis. (1996) Planning the routing mix in FASs to minimize total transportation time. International Journal of Flexible Manufacturing Systems 8:2, pages 131-157.
Crossref
Pacifico Marcello Pelagagge & Gino Cardarelli. (1996) An effective loading rule for FMS real time scheduling. Integrated Manufacturing Systems 7:1, pages 52-59.
Crossref
B. Srivastava & Wun-Hwa Chen. (1996) Heuristic solutions for loading in flexible manufacturing systems. IEEE Transactions on Robotics and Automation 12:6, pages 858-868.
Crossref
Zubair M. Mohamed. (1995) Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems. European Journal of Operational Research 87:2, pages 289-298.
Crossref
C. Saygin, S.E. Kiliç, T. Tóth & F. Erdélyi. (1995) On Scheduling Approaches of Flexible Manufacturing Systems: Gap Between Theory and Practice. IFAC Proceedings Volumes 28:24, pages 61-66.
Crossref
Meng Jinyan, Soh Yeng Chai & Wang Youyi. (1995) FMS jobshop scheduling using Lagrangian relaxation method. FMS jobshop scheduling using Lagrangian relaxation method.
K. Kato. (1995) An integrated approach for loading, routeing, and scheduling in flexible manufacturing systems. An integrated approach for loading, routeing, and scheduling in flexible manufacturing systems.
Mohamed Ben-Daya. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology
113
139
.
A. Gunasekaran, T. Martikainen & P. Yli-Olli. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology
3
44
.
Chang-Yong Song, Hark Hwang & Yeong-Dae Kim. (1995) Heuristic algorithm for the tool movement policy in flexible manufacturing systems. Journal of Manufacturing Systems 14:3, pages 160-168.
Crossref
Yves Crama & Alwin G. Oerlemans. (1994) A column generation approach to job grouping for flexible manufacturing systems. European Journal of Operational Research 78:1, pages 58-80.
Crossref
Chung-Yee Lee & George L. Vairaktarakis. (1994) Minimizing makespan in hybrid flowshops. Operations Research Letters 16:3, pages 149-158.
Crossref
Yeong-Dae Kim & Candace Arai Yano. (1994) A new branch and bound algorithm for loading problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems 6:4, pages 361-381.
Crossref
Bimal K. Modi & Kripa Shanker. (1994) A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS. International Journal of Production Economics 34:1, pages 73-82.
Crossref
Yohanan Arzi & Adar Kalir. (1994) Estimating product workloads in a production system with alternative dissimilar machines operated in a produce-to-order environment. Journal of Manufacturing Systems 13:2, pages 139-147.
Crossref
MELTEM DENIZEL‐SIVRI & S. SELCUK ERENGUC. (1993) A BRANCH AND BOUND PROCEDURE FOR SETUP PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS. Production and Operations Management 2:4, pages 289-305.
Crossref
Athar Masood & K. Srihari. (1993) RDCAPP: A real-time dynamic CAPP system for an FMS. The International Journal of Advanced Manufacturing Technology 8:6, pages 358-370.
Crossref
Bharatendu Srivastava & Wun-Hwa Chen. (1993) Part type selection problem in flexible manufacturing systems: tabu search algorithms. Annals of Operations Research 41:3, pages 279-297.
Crossref
Abel A. Moreno & Fong-Yuen Ding. (1993) Heuristics for the FMS-loading and part-type-selection problems. International Journal of Flexible Manufacturing Systems 5:4, pages 287-300.
Crossref
MING LIANG & SOURIN P. DUTTA. (1993) SOLVING A COMBINED PART‐SELECTION, MACHINE‐LOADING, AND TOOL‐CONFIGURATION PROBLEM IN FLEXIBLE MANUFACTURING SYSTEMS*. Production and Operations Management 2:2, pages 97-113.
Crossref
A. Gunasekaran, T. Martikainen & P. Yli-Olli. (1993) Flexible manufacturing systems: An investigation for research and applications. European Journal of Operational Research 66:1, pages 1-26.
Crossref
K. Kato, F. Oba & F. Hashimoto. (1993) Heuristics based integrated design environment for planning and scheduling in FMS. Heuristics based integrated design environment for planning and scheduling in FMS.
C.W. Holsapple, V.S. Jacob, R. Pakath & J.S. Zaveri. (1993) A genetics-based hybrid scheduler for generating static schedules in flexible manufacturing contexts. IEEE Transactions on Systems, Man, and Cybernetics 23:4, pages 953-972.
Crossref
S.M. Taboun & T. Ulger. (1992) Multi-objective modelling of operation-allocation problem in flexible manufacturing systems. Computers & Industrial Engineering 23:1-4, pages 295-299.
Crossref
Soumen Ghosh & Cheryl Gaimon. (1992) Routing flexibility and production scheduling in a flexible manufacturing system. European Journal of Operational Research 60:3, pages 344-364.
Crossref
John J. Bernardo & Zubair Mohamed. (1992) The measurement and use of operational flexibility in the loading of Flexible Manufacturing Systems. European Journal of Operational Research 60:2, pages 144-155.
Crossref
Dharmaraj Veeramani, David M. Upton & Moshe M. Barash. (1992) Cutting-tool management in computer-integrated manufacturing. International Journal of Flexible Manufacturing Systems 4:3-4, pages 237-265.
Crossref
Panagiotis Kouvelis. (1992) Design and planning problems in flexible manufacturing systems: a critical review. Journal of Intelligent Manufacturing 3:2, pages 75-99.
Crossref
Yeong-Dae Kim & Candace Arai Yano. (1992) An iterative approach to system setup problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems 4:2, pages 183-209.
Crossref
Gerald W. Evans, Sai Kolli & Mansooreh Mollaghasemi. 1992. New Directions for Operations Research in Manufacturing. New Directions for Operations Research in Manufacturing
520
530
.
Yash P. Gupta, Gerald W. Evans & Mahesh C. Gupta. (1991) A review of multi-criterion approaches to FMS scheduling problems. International Journal of Production Economics 22:1, pages 13-31.
Crossref
Gad Rabinowitz, Abraham Mehrez & Subhashish Samaddar. (1991) A scheduling model for multirobot assembly cells. International Journal of Flexible Manufacturing Systems 3:2, pages 149-180.
Crossref
CATHERINE M. HARMONOSKY. 1991. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5
83
122
.
Kripa Shanker & Anil Kumar Agrawal. (1991) Loading problem and resource considerations in FMS: a review. International Journal of Production Economics 25:1-3, pages 111-119.
Crossref
Jim Hutchison & Basheer Khumawala. (2002) Scheduling random flexible manufacturing systems with dynamic environments. Journal of Operations Management 9:3, pages 335-351.
Crossref
K. Srihari & T. J. Greene. (1990) Macro-capp: A prototype capp system for an FMS. The International Journal of Advanced Manufacturing Technology 5:1, pages 34-51.
Crossref
Kathryn E. Stecke & Ilyong Kim. (1989) Performance evaluation for systems of pooled machines of unequal sizes: Unbalancing versus balancing. European Journal of Operational Research 42:1, pages 22-38.
Crossref
Günter SchmidtGünter Schmidt. 1989. CAM: Algorithmen und Decision Support für die Fertigungssteuerung. CAM: Algorithmen und Decision Support für die Fertigungssteuerung
67
87
.
Günter SchmidtGünter Schmidt. 1989. CAM: Algorithmen und Decision Support für die Fertigungssteuerung. CAM: Algorithmen und Decision Support für die Fertigungssteuerung
46
67
.
Suranjan DE. (1988) A knowledge-based approach to scheduling in an F.M.S.. Annals of Operations Research 12:1, pages 109-134.
Crossref
Jose A. Ventura, F.Frank Chen & Michael S. Leonard. (1988) Loading tools to machines in flexible manufacturing systems. Computers & Industrial Engineering 15:1-4, pages 223-230.
Crossref
K Srihari & Timothy J Greene. (1988) Alternate routings in CAPP implementation in a FMS. Computers & Industrial Engineering 15:1-4, pages 41-50.
Crossref
P. Kumar, N. Singh & N. K. Tewari. (1987) Multicriterion analysis of the loading problem in flexible manufacturing systems using Min-Max approach. The International Journal of Advanced Manufacturing Technology 2:2, pages 13-20.
Crossref