Anupma Yadav & S. C. Jayswal. (2018) Evaluation of batching and layout on the performance of flexible manufacturing system. The International Journal of Advanced Manufacturing Technology 101:5-8, pages 1435-1449.
Crossref
Chrissoleon T. Papadopoulos, Jingshan Li & Michael E.J. O'Kelly. (2019) A classification and review of timed Markov models of manufacturing systems. Computers & Industrial Engineering 128, pages 219-244.
Crossref
Mangey Ram & Nupur Goyal. (2018) Stochastic Design Exploration with Rework of Flexible Manufacturing System Under Copula-Coverage Approach. International Journal of Reliability, Quality and Safety Engineering 25:02, pages 1850007.
Crossref
Miryam BaradMiryam Barad. 2018. Strategies and Techniques for Quality and Flexibility. Strategies and Techniques for Quality and Flexibility
31
57
.
V Kumar, S Kumar, M K Tiwari & F Chan. (2008) Performance evaluation of flexible manufacturing systems under uncertain and dynamic situations. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 222:7, pages 915-934.
Crossref
J. George Shanthikumar & David D. Yao. (2007) John A. Buzacott and His Pioneering Contributions to Manufacturing and Service Systems. Production and Operations Management 16:6, pages 657-664.
Crossref
Ayse Kavusturucu & Surendra M. Gupta. (1998) A methodology for analyzing finite buffer tandem manufacturing systems with N-policy. Computers & Industrial Engineering 34:4, pages 837-848.
Crossref
A. Zakarian & A. Kusiak. (1997) Modeling manufacturing dependability. IEEE Transactions on Robotics and Automation 13:2, pages 161-168.
Crossref
Harvey H. Millar & Tao Yang. (1996) Batch sizes and lead-time performance in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems 8:1, pages 5-21.
Crossref
Ursula DankertUrsula Dankert. 1995. Planung des Designs flexibler Fertigungssysteme. Planung des Designs flexibler Fertigungssysteme
8
70
.
C.S. Sung & S.T. Kwon. (1994) Performance modeling of an FMS with finite input and output buffers. International Journal of Production Economics 37:2-3, pages 161-175.
Crossref
Petro Yuanidis, Maciej A. Styblinski, Donald R. Smith & Chanan Singh. (1994) Reliability modeling of flexible manufacturing systems. Microelectronics Reliability 34:7, pages 1203-1220.
Crossref
Yavuz A. Bozer, Myeon-Sig Cho & Mandyam M. Srinivasan. (1994) Expected waiting times in single-device trip-based material handling systems. European Journal of Operational Research 75:1, pages 200-216.
Crossref
G.B. Reddy, S.S.N. Murty & K. Ghosh. (1993) Timed Petri net: An expeditious tool for modelling and analysis of manufacturing systems. Mathematical and Computer Modelling 18:9, pages 17-30.
Crossref
Li Zhuang & Khalil S. Hindi. (1993) Approximate decomposition for closed queueing network models of FMSs with a block-and-wait and state-dependent routing mechanism. European Journal of Operational Research 67:3, pages 373-386.
Crossref
Lie-Fern Hsu, Charles S. Tapiero & Cinho Lin. (2011) Network of queues modeling in flexible manufacturing systems : a survey. RAIRO - Operations Research 27:2, pages 201-248.
Crossref
Rajan Suri, Jerry L. Sanders & Manjunath Kamath. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory
199
286
.
Gad Rabinowitz, Abraham Mehrez & Subhashish Samaddar. (1991) A scheduling model for multirobot assembly cells. International Journal of Flexible Manufacturing Systems 3:2, pages 149-180.
Crossref
J.R. Watson & A.A. Desrochers. (1991) Applying generalized stochastic Petri nets to manufacturing systems containing nonexponential transition functions. IEEE Transactions on Systems, Man, and Cybernetics 21:5, pages 1008-1017.
Crossref
Dae-Won Kim, Bum-Hee Lee & Myoung-Sam Ko. (2009) A Knowledge-Based Approach to Modelling of Robotic Assembly Cells. Robotica 9:1, pages 31-42.
Crossref
Li ZHUANG & Khalil S. HINDI. 1991. Advances in Production Management Systems. Advances in Production Management Systems
523
530
.
Li Zhuang & Khalil S. Hindi. (1991) Approximate MVA for closed queueing network models of FMS with a block-and-wait mechanism. Computers & Industrial Engineering 20:1, pages 35-44.
Crossref
A.A. Bulgak & J.L. Sanders. (1991) Approximate analytical performance models for automatic assembly systems with statistical process control and automated inspection. Journal of Manufacturing Systems 10:2, pages 121-133.
Crossref
Robert J. Graves, Mickey R. Wilhelm, Leon F. McGinnis & Richard E. WardLeon F. McGinnis. 1991. Material Handling ’90. Material Handling ’90
67
93
.
Robert J. Graves, Mickey R. Wilhelm, Leon F. McGinnis & Richard E. WardZulma R. Toros Ramos & Leon F. McGinnis. 1991. Material Handling ’90. Material Handling ’90
435
450
.
Robert J. Graves, Mickey R. Wilhelm, Leon F. McGinnis & Richard E. WardZulma R. Toro Ramos & Leon F. McGinnis. 1991. Material Handling ’90. Material Handling ’90
417
433
.
M. Barad & D. Sipper. (1990) Flexibility and types of changes in FMSs: A timed petri-nets assessment of machine flexibility. The International Journal of Advanced Manufacturing Technology 5:4, pages 292-306.
Crossref
Li Zhuang & K.S. Hindi. (1990) Mean value analysis for multiclass closed queueing network models of flexible manufacturing systems with limited buffers. European Journal of Operational Research 46:3, pages 366-379.
Crossref
K. PRESTON WHITEJR.JR.. 1990. Advances in Industrial Systems. Advances in Industrial Systems
115
157
.
Akif Asil Bulgak & Jerry L. Sanders. (1990) An analytical performance model for assembly systems with automatic inspection stations and repair loops. Computers & Industrial Engineering 18:3, pages 373-380.
Crossref
V. Albino, G.O. Okogbaa & R.L. Shell. (1990) A computerized integrated performance-reliability measure of a flexible automated production system. Computers & Industrial Engineering 18:4, pages 547-558.
Crossref
P.K. Mishra & P.C. Pandey. (1989) Simulation modeling of batch job shop type flexible manufacturing systems. Journal of Mechanical Working Technology 20, pages 441-450.
Crossref
A. Seidmann & A. Tenenbaum. (1989) Optimal queueing systems controls with finite buffers and with multiple component cost functions. IEEE Transactions on Systems, Man, and Cybernetics 19:2, pages 356-364.
Crossref
J. A. Buzacott. 1989. Operations Research Models in Flexible Manufacturing Systems. Operations Research Models in Flexible Manufacturing Systems
123
134
.
G. Romanin-Jacur. 1989. Operations Research Models in Flexible Manufacturing Systems. Operations Research Models in Flexible Manufacturing Systems
213
236
.
Günter SchmidtGünter Schmidt. 1989. CAM: Algorithmen und Decision Support für die Fertigungssteuerung. CAM: Algorithmen und Decision Support für die Fertigungssteuerung
23
45
.
Abraham Seidmann. (1988) Optimal dynamic routing in Flexible Manufacturing Systems with limited buffers. Annals of Operations Research 15:1, pages 289-311.
Crossref
Manjunath Kamath, Rajan Suri & Jerry L. Sanders. (1988) Analytical performance models for closed-loop flexible assembly systems. International Journal of Flexible Manufacturing Systems 1:1, pages 51-84.
Crossref
Abraham Seidmann. (1988) Regenerative pull (Kanban) production control policies. European Journal of Operational Research 35:3, pages 401-413.
Crossref
D. Sipper & M. Barad. (1988) Flexibility hirarchy in FMS: Concepts and Petri nets evaluation. Flexibility hirarchy in FMS: Concepts and Petri nets evaluation.
W. H. M. Zijm. 1988. DGOR/NSOR. DGOR/NSOR
142
161
.
Lie -Fern Hsu & Charles S. Tapiero. (1987) Maintenance of an unreliable M/G/1 queue-like job shop. Queueing Systems 2:4, pages 333-349.
Crossref
Yu-Chi Ho. (1987) Performance evaluation and perturbation analysis of discrete event dynamic systems. IEEE Transactions on Automatic Control 32:7, pages 563-572.
Crossref
M. Jafari. (1987) Performance modelling of a flexible manufacturing cell with two workstations and a single material handling device. Performance modelling of a flexible manufacturing cell with two workstations and a single material handling device.
J. A. Buzacott & D. D. Yao. (1986) On queueing network models of flexible manufacturing systems. Queueing Systems 1:1, pages 5-27.
Crossref
David D. Yao & J.A. Buzacott. (1986) The exponentialization approach to flexible manufacturing system models with general processing times. European Journal of Operational Research 24:3, pages 410-416.
Crossref