206
Views
96
CrossRef citations to date
0
Altmetric
Original Articles

A robustness approach to facilities design

&
Pages 479-486 | Received 01 May 1986, Published online: 15 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (24)

Hani Pourvaziri, Saeideh Salimpour, Seyed Taghi Akhavan Niaki & Ahmed Azab. (2022) Robust facility layout design for flexible manufacturing: a doe-based heuristic. International Journal of Production Research 60:18, pages 5633-5654.
Read now
Massimo Manzini & Marcello Urgo. (2019) An approach for the robust design of a reconfigurable assembly cell with 7-axis robot. International Journal of Computer Integrated Manufacturing 32:8, pages 777-797.
Read now
Mert Şahinkoç & Ümit Bilge. (2018) Facility layout problem with QAP formulation under scenario-based uncertainty. INFOR: Information Systems and Operational Research 56:4, pages 406-427.
Read now
Yifei Zhao & Stein W. Wallace. (2016) Appraising redundancy in facility layout. International Journal of Production Research 54:3, pages 665-679.
Read now
Behrang Bootaki, Iraj Mahdavi & Mohammd Mahdi Paydar. (2015) New bi-objective robust design-based utilisation towards dynamic cell formation problem with fuzzy random demands. International Journal of Computer Integrated Manufacturing 28:6, pages 577-592.
Read now
Charles J. Malmborg. (2013) The concurrent block layout problem. International Journal of Production Research 51:6, pages 1745-1761.
Read now
Wai Kin (Victor) Chan & Charles J. Malmborg. (2010) A Monte Carlo simulation based heuristic procedure for solving dynamic line layout problems for facilities using conventional material handling devices. International Journal of Production Research 48:10, pages 2937-2956.
Read now
Krishna K. Krishnan, Id Jithavech & Haitao Liao. (2009) Mitigation of risk in facility layout design for single and multi-period problems. International Journal of Production Research 47:21, pages 5911-5940.
Read now
V. Madhusudanan Pillai & Kankata Subbarao. (2008) A robust cellular manufacturing system design for dynamic part population using a genetic algorithm. International Journal of Production Research 46:18, pages 5191-5210.
Read now
S. P. Singh & R. R. K. Sharma. (2008) Two-level modified simulated annealing based approach for solving facility layout problem. International Journal of Production Research 46:13, pages 3563-3582.
Read now
N. Khilwani, R. Shankar & M. K. Tiwari. (2008) Facility layout problem: an approach based on a group decision-making system and psychoclonal algorithm. International Journal of Production Research 46:4, pages 895-927.
Read now
LawrenceV. Snyder. (2006) Facility location under uncertainty: a review. IIE Transactions 38:7, pages 547-564.
Read now
MAHER LAHMAR & SAIF BENJAAFAR. (2005) Design of distributed layouts. IIE Transactions 37:4, pages 303-318.
Read now
Marcello Braglia , Simone Zanoni & Lucio Zavanella. (2005) Robust versus stable layout design in stochastic environments. Production Planning & Control 16:1, pages 71-80.
Read now
S. Kulturel-Konak, A. E. Smith & B. A. Norman. (2004) Layout optimization considering production uncertainty and routing flexibility. International Journal of Production Research 42:21, pages 4475-4493.
Read now
Marcello Braglia, Simone Zanoni & Lucio Zavanella. (2003) Layout design in dynamic environments: Strategies and quantitative indices. International Journal of Production Research 41:5, pages 995-1016.
Read now
Chien-Wen Chen & D.Y. Sha. (2001) A LITERATURE REVIEW AND ANALYSIS TO THE FACILITY LAYOUT PROBLEM. Journal of the Chinese Institute of Industrial Engineers 18:1, pages 55-73.
Read now
G. Aiello & M. Enea. (2001) Fuzzy approach to the robust facility layout in uncertain production environments. International Journal of Production Research 39:18, pages 4089-4101.
Read now
PANOS KOUVELIS, RICHARDL. DANIELS & GEORGE VAIRAKTARAKIS. (2000) Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Transactions 32:5, pages 421-432.
Read now
SAIFALLAH BENJAAFAR & MEHDI SHEIKHZADEH. (2000) Design of flexible plant layouts. IIE Transactions 32:4, pages 309-322.
Read now
RICHARDL. DANIELS & JANICEE. CARRILLO. (1997) β-Robust scheduling for single-machine systems with uncertain processing times. IIE Transactions 29:11, pages 977-985.
Read now
PANAGIOTIS KOUVELIS, WEN-CHYUAN CHIANG & GANG YU. (1995) Optimal algorithms for row layout problems in automated manufacturing systems. IIE Transactions 27:1, pages 99-104.
Read now
D. B. WEBSTER & S. V. MURTY. (1992) Computer-based FMS facilities design tool. International Journal of Production Research 30:10, pages 2439-2455.
Read now
MEIRJ. ROSENBLATT & DEANH. KROPP. (1992) The Single Period Stochastic Plant Layout Problem. IIE Transactions 24:2, pages 169-176.
Read now

Articles from other publishers (72)

Kemal Subulan, Bilge Varol & Adil Baykasoğlu. (2023) Designing robust capability-based distributed machine layouts with random machine availability and fuzzy demand/process flow information. Soft Computing.
Crossref
Akash Tayal, Arun Solanki & Simar Preet Singh. (2020) Integrated frame work for identifying sustainable manufacturing layouts based on big data, machine learning, meta-heuristic and data envelopment analysis. Sustainable Cities and Society 62, pages 102383.
Crossref
Akash Tayal, Utku Kose, Arun Solanki, Anand Nayyar & José Antonio Marmolejo Saucedo. (2019) Efficiency analysis for stochastic dynamic facility layout problem using meta‐heuristic, data envelopment analysis and machine learning. Computational Intelligence 36:1, pages 172-202.
Crossref
Akash Tayal & Surya Prakash Singh. (2017) Formulating multi-objective stochastic dynamic facility layout problem for disaster relief. Annals of Operations Research 283:1-2, pages 837-863.
Crossref
Niloofar Shokoohi Targhi, Majid Sabzehparvar & Sadoullah Ebrahimnezhad. (2019) A Mathematical Model for Robust Facility Layout Problem in 3D Space with Possibility of Floors. A Mathematical Model for Robust Facility Layout Problem in 3D Space with Possibility of Floors.
Xi Xiao, Yaoguang Hu, Weidong Wang & Weibo Ren. (2019) A robust optimization approach for unequal-area dynamic facility layout with demand uncertainty. Procedia CIRP 81, pages 594-599.
Crossref
Ravi Kumar & Surya Prakash Singh. 2019. Advanced Computing and Communication Technologies. Advanced Computing and Communication Technologies 19 33 .
Eiji Morinaga, Komei Iwasaki, Hidefumi Wakamatsu & Eiji Arai. 2019. Advances in Production Management Systems. Towards Smart Production Management Systems. Advances in Production Management Systems. Towards Smart Production Management Systems 189 195 .
Yunfang Peng, Tian Zeng, Lingzhi Fan, Yajuan Han & Beixin Xia. (2018) An Improved Genetic Algorithm Based Robust Approach for Stochastic Dynamic Facility Layout Problem. Discrete Dynamics in Nature and Society 2018, pages 1-8.
Crossref
Akash Tayal & Surya Prakash Singh. (2016) Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem. Annals of Operations Research 270:1-2, pages 489-514.
Crossref
Hasan Hosseini-Nasab, Sepideh Fereidouni, Seyyed Mohammad Taghi Fatemi Ghomi & Mohammad Bagher Fakhrzad. (2017) Classification of facility layout problems: a review study. The International Journal of Advanced Manufacturing Technology 94:1-4, pages 957-977.
Crossref
Akash Tayal & Surya Prakash Singh. (2016) Designing Flexible Stochastic Dynamic Layout: An Integrated Firefly and Chaotic Simulated Annealing-Based Approach. Global Journal of Flexible Systems Management 18:2, pages 89-98.
Crossref
Akash Tayal, Angappa Gunasekaran, Surya Prakash Singh, Rameshwar Dubey & Thanos Papadopoulos. (2016) Formulating and solving sustainable stochastic dynamic facility layout problem: a key to sustainable operations. Annals of Operations Research 253:1, pages 621-655.
Crossref
Shanshan Zha, Yu Guo, Shaohua Huang, Falin Wang & Xiao Huang. (2017) Robust Facility Layout Design under Uncertain Product Demands. Procedia CIRP 63, pages 354-359.
Crossref
Eiji Morinaga, Komei Iwasaki, Hidefumi Wakamatsu & Eiji Arai. 2017. Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing. Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing 168 175 .
Moshe Sniedovich. (2016) Wald's mighty maximin: a tutorial. International Transactions in Operational Research 23:4, pages 625-653.
Crossref
Niloufar Izadinia & Kourosh Eshghi. (2016) A robust mathematical model and ACO solution for multi-floor discrete layout problem with uncertain locations and demands. Computers & Industrial Engineering 96, pages 237-248.
Crossref
Bernd Hillebrand & Grigory Pishchulov. 2016. Logistics Management. Logistics Management 121 132 .
Mohammad Hassan Salmani, Kourosh Eshghi & Hossein Neghabi. (2015) A bi-objective MIP model for facility layout problem in uncertain environment. The International Journal of Advanced Manufacturing Technology 81:9-12, pages 1563-1575.
Crossref
Kamal Deep & Pardeep K. Singh. (2015) Design of robust cellular manufacturing system for dynamic part population considering multiple processing routes using genetic algorithm. Journal of Manufacturing Systems 35, pages 155-163.
Crossref
Niloufar Izadinia, Kourosh Eshghi & Mohammad Hassan Salmani. (2014) A robust model for multi-floor layout problem. Computers & Industrial Engineering 78, pages 127-134.
Crossref
Sanghwan Kim, Hyun Chung & Mingyu Kim. (2014) Optimization of P.E. area division and arrangement based on product mix. Journal of Marine Science and Technology 19:4, pages 351-359.
Crossref
Hossein Neghabi, Kourosh Eshghi & Mohammad Hassan Salmani. (2014) A new model for robust facility layout problem. Information Sciences 278, pages 498-509.
Crossref
N. He, D.Z. Zhang & Q. Li. (2014) Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system. International Journal of Production Economics 149, pages 117-130.
Crossref
Rajesh Matai, S. P. Singh & M. L. Mittal. (2013) A non-greedy systematic neighbourhood search heuristic for solving facility layout problem. The International Journal of Advanced Manufacturing Technology 68:5-8, pages 1665-1675.
Crossref
Carla Simone Ruppenthal Neumann & Flávio Sanson Fogliatto. (2013) Sistemática para avaliação e melhoria da flexibilidade de layout em ambientes dinâmicos. Gestão & Produção 20:2, pages 235-254.
Crossref
El-Houssaine Aghezzaf & Carles Sitompul. 2013. Production and Manufacturing System Management. Production and Manufacturing System Management 200 229 .
T V Krishna Mohan & V Madhusudanan Pillai. (2013) Detailed Dynamic Layout Planning: An Adaptive Layout Approach. IFAC Proceedings Volumes 46:9, pages 2027-2032.
Crossref
Moshe Sniedovich. (2012) Fooled by Local Robustness. Risk Analysis 32:10, pages 1630-1637.
Crossref
Colin J. Thompson, Rob M. Cannon & Mark A. Burgman. (2012) Surveillance for threatened and invasive species when uncertainty is severe. Diversity and Distributions 18:4, pages 410-416.
Crossref
Ghorbanali Moslemipour, Tian Soon Lee & Dirk Rilling. (2011) A review of intelligent approaches for designing dynamic and robust layouts in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 60:1-4, pages 11-27.
Crossref
Deogratias Eustace, Eugene Russell & Landman E. Dean. 2012. Network Reliability in Practice. Network Reliability in Practice 97 114 .
Alain Martel & Walid Klibi. 2012. Supply Chain Disruptions. Supply Chain Disruptions 241 273 .
Id Jithavech & Krishna Kumar Krishnan. (2009) A simulation-based approach for risk assessment of facility layout designs under stochastic product demands. The International Journal of Advanced Manufacturing Technology 49:1-4, pages 27-40.
Crossref
Barbara Anthony, Vineet Goyal, Anupam Gupta & Viswanath Nagarajan. (2010) A Plant Location Guide for the Unsure: Approximation Algorithms for Min-Max Location Problems. Mathematics of Operations Research 35:1, pages 79-101.
Crossref
Bernard Roy. (2010) Robustness in operational research and decision aiding: A multi-faceted issue. European Journal of Operational Research 200:3, pages 629-638.
Crossref
Alexandre Dolgui & Jean-Marie Proth. 2010. Supply Chain Engineering. Supply Chain Engineering 371 417 .
Dhamodharan Raman, Sev V. Nagalingam & Grier C.I. Lin. (2009) Towards measuring the effectiveness of a facilities layout. Robotics and Computer-Integrated Manufacturing 25:1, pages 191-203.
Crossref
Jerzy Józefczyk & Michał Markowski. (2009) Simulated annealing based robust algorithm for routing-scheduling problem with uncertain execution times. IFAC Proceedings Volumes 42:4, pages 1989-1994.
Crossref
Jerzy Józefczyk. (2008) Worst‐case allocation algorithms in a complex of operations with interval parameters. Kybernetes 37:5, pages 652-676.
Crossref
Jerzy Józefczyk. (2007) ROBUST DECISION-MAKING ALGORITHM FOR TWO-LEVEL OPERATIONAL SYSTEMS. IFAC Proceedings Volumes 40:18, pages 611-616.
Crossref
Sadan Kulturel-Konak. (2007) Approaches to uncertainties in facility layout problems: Perspectives at the beginning of the 21st Century. Journal of Intelligent Manufacturing 18:2, pages 273-284.
Crossref
M. Siemiatkowski & W. Przybylski. (2006) Modelling and simulation analysis of process alternatives in the cellular manufacturing of axially symmetric parts. The International Journal of Advanced Manufacturing Technology 32:5-6, pages 516-530.
Crossref
Jaydeep Balakrishnan & Chun Hung Cheng. (2007) Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions. European Journal of Operational Research 177:1, pages 281-309.
Crossref
Panos Kouvelis & Serpil Sayın. (2006) Algorithm robust for the bicriteria discrete optimization problem. Annals of Operations Research 147:1, pages 71-85.
Crossref
S. P. Singh & R. R. K. Sharma. (2005) A review of different approaches to the facility layout problems. The International Journal of Advanced Manufacturing Technology 30:5-6, pages 425-433.
Crossref
Bryan A. Norman & Alice E. Smith. (2006) A continuous approach to considering uncertainty in facility design. Computers & Operations Research 33:6, pages 1760-1775.
Crossref
Daniel Golovin, Vineet Goyal & R. Ravi. 2006. STACS 2006. STACS 2006 206 217 .
M. Enea, G. Galante & E. Panascia. (2005) The facility layout problem approached using a fuzzy model and a genetic search. Journal of Intelligent Manufacturing 16:3, pages 303-316.
Crossref
Jerzy Józefczyk. (2005) ROBUST ALGORITHM FOR THE UNCERTAIN SCHEDULING PROBLEM WITH MOVING EXECUTORS. IFAC Proceedings Volumes 38:1, pages 115-120.
Crossref
Marcello Braglia, Simone Zanoni & Lucio Zavanella. (2005) Layout design in dynamic environments: analytical issues. International Transactions in Operational Research 12:1, pages 1-19.
Crossref
K. Dhamdhere, V. Goyal, R. Ravi & M. Singh. (2005) How to Pay, Come What May: Approximation Algorithms for Demand-Robust Covering Problems. How to Pay, Come What May: Approximation Algorithms for Demand-Robust Covering Problems.
Nathalie Marcoux, Diane Riopel & André Langevin. 2005. Logistics Systems: Design and Optimization. Logistics Systems: Design and Optimization 123 170 .
Saif Benjaafar, Sunderesh S. Heragu & Shahrukh A. Irani. (2002) Next Generation Factory Layouts: Research Challenges and Recent Progress. Interfaces 32:6, pages 58-76.
Crossref
Igor Averbakh & Oded Berman. (2000) Minmax Regret Median Location on a Network Under Uncertainty. INFORMS Journal on Computing 12:2, pages 104-110.
Crossref
Alice E. Smith & Bryan A. Norman. 2000. Evolutionary Design and Manufacture. Evolutionary Design and Manufacture 175 186 .
Helmut E. Mausser & Manuel Laguna. (1999) A heuristic to minimax absolute regret for linear programs with interval objective function coefficients. European Journal of Operational Research 117:1, pages 157-174.
Crossref
H.E. Mausser & M. Laguna. (2006) A New Mixed Integer Formulation for the Maximum Regret Problem. International Transactions in Operational Research 5:5, pages 389-403.
Crossref
Jaydeep Balakrishnan & Chun Hung Cheng. (1998) Dynamic layout algorithms: a state-of-the-art survey. Omega 26:4, pages 507-521.
Crossref
Taho Yang & Brett A. Peters. (1998) Flexible machine layout design for dynamic and uncertain production environments. European Journal of Operational Research 108:1, pages 49-64.
Crossref
B.A. Norman & A.E. Smhh. (1997) Random Keys Genetic Algorithm With Adaptive Penalty Function For Optimization Of Constrained Facility Layout Problems. Random Keys Genetic Algorithm With Adaptive Penalty Function For Optimization Of Constrained Facility Layout Problems.
Panos Kouvelis & Gang YuPanos Kouvelis & Gang Yu. 1997. Robust Discrete Optimization and Its Applications. Robust Discrete Optimization and Its Applications 290 332 .
Panos Kouvelis & Gang YuPanos Kouvelis & Gang Yu. 1997. Robust Discrete Optimization and Its Applications. Robust Discrete Optimization and Its Applications 1 25 .
Genaro J. Gutiérrez, Panagiotis Kouvelis & Abbas A. Kurawarwala. (1996) A robustness approach to uncapacitated network design problems. European Journal of Operational Research 94:2, pages 362-376.
Crossref
Runwei CHENG, Mitsuo GEN & Tatsumi TOZAWA. (1996) . Journal of Japan Society for Fuzzy Theory and Systems 8:2, pages 335-346.
Crossref
S. Benjaafar & M. Sheikhzadeh. (1996) Design of flexible layouts for manufacturing systems. Design of flexible layouts for manufacturing systems.
Russell D. Meller & Kai-Yin Gau. (1996) The facility layout problem: Recent and emerging trends and perspectives. Journal of Manufacturing Systems 15:5, pages 351-366.
Crossref
Genaro J. Gutierrez & Panagiotis Kouvelis. (1995) A robustness approach to international sourcing. Annals of Operations Research 59:1, pages 165-193.
Crossref
S. Benajaafar. (1995) Design of flexible layouts for manufacturing systems. Design of flexible layouts for manufacturing systems.
Panagiotis Kouvelis, Abbas A. Kurawarwala & Genaro J. Gutiérrez. (1992) Algorithms for robust single and multiple period layout planning for manufacturing systems. European Journal of Operational Research 63:2, pages 287-303.
Crossref
P Kouvelis, W-C Chiang & AS Kiran. (1992) A survey of layout issues in flexible manufacturing systems. Omega 20:3, pages 375-390.
Crossref
Meir J. Rosenblatt & Boaz Golany. (1992) A distance assignment approach to the facility layout problem. European Journal of Operational Research 57:2, pages 253-270.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.