Pierre Massotte & Patrick Corsi. 2020. Complex Decision‐Making in Economy and Finance. Complex Decision‐Making in Economy and Finance
313
326
.
Elie Maalouf, Julien Le Duigou, Bassam Hussein & Joanna Daaboul. 2020. Product Lifecycle Management Enabling Smart X. Product Lifecycle Management Enabling Smart X
3
14
.
Pierre Massotte & Patrick Corsi. 2017. Smart Decisions in Complex Systems. Smart Decisions in Complex Systems
303
326
.
Guiovanni Jules, Mozafar Saadat & Salman Saeidlou. (2013) Holonic Goal-Driven Scheduling Model for Manufacturing Networks. Holonic Goal-Driven Scheduling Model for Manufacturing Networks.
W. L. Yeung. (2013) Short paper adapting the contract net protocol for publish/subscribe messaging. Short paper adapting the contract net protocol for publish/subscribe messaging.
Nicholas G. Hall & Zhixin Liu. (2013) Market Good Flexibility in Capacity Auctions. Production and Operations Management 22:2, pages 459-472.
Crossref
W. L. Yeung. 2013. IAENG Transactions on Engineering Technologies. IAENG Transactions on Engineering Technologies
725
738
.
C. Y. Cheng, L. C. Wang & S. L. Hsu. (2010) Simulation and multi-agent-based integrated solution for manufacturing planning and control. Simulation and multi-agent-based integrated solution for manufacturing planning and control.
T. N. Wong & C. B. Leung. (2010) Application of Auto-ID in agent-based manufacturing control. Application of Auto-ID in agent-based manufacturing control.
Qing Liu, Tiequn Huang & Qiwei Yu. (2010) Negotiation Mechanism for Reactive, Dynamic and Distributed Multi-agent Manufacturing System. Negotiation Mechanism for Reactive, Dynamic and Distributed Multi-agent Manufacturing System.
Xiaohua Liu, Jie Lin & Feng Wang. (2009) Simulation System of Production Scheduling Multi-agent-Based. Simulation System of Production Scheduling Multi-agent-Based.
T. N. Wong, C.W. Leung & H.P. Tang. (2008) A multi-agent system framework for manufacturing planning and control. A multi-agent system framework for manufacturing planning and control.
J.-M. Frayret, S. D’Amours, A. Rousseau, S. Harvey & J. Gaudreault. (2008) Agent-based supply-chain planning in the forest products industry. International Journal of Flexible Manufacturing Systems 19:4, pages 358-391.
Crossref
Ning Liu, Mohamed A. Abdelrahman & Srini Ramaswamy. (2007) A Complete Multiagent Framework for Robust and Adaptable Dynamic Job Shop Scheduling. IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 37:5, pages 904-916.
Crossref
Nobuhiro Sugimura, Rajesh Shrestha, Yoshitaka Tanimizu & Koji Iwamura. 2007. Process Planning and Scheduling for Distributed Manufacturing. Process Planning and Scheduling for Distributed Manufacturing
311
334
.
. 2007. Industrial Robots Programming. Industrial Robots Programming
35
107
.
T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung. (2006) Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications 31:3, pages 486-494.
Crossref
Takayuki Miyama, Tatsushi Nishi & Masami Konishi. (2006) Optimization of Lotsizing and Scheduling by an Autonomous Decentralized Scheduling Method for Aluminum Production Line. IEEJ Transactions on Electronics, Information and Systems 126:6, pages 771-779.
Crossref
Tatsushi Nishi, Masami Konishi & Shinji Hasebe. (2005) An autonomous decentralized supply chain planning system for multi-stage production processes. Journal of Intelligent Manufacturing 16:3, pages 259-275.
Crossref
Robin G. Qiu, Patrick McDonnell, Sanjay Joshi & David W. Russell. (2004) A heuristic game theoretic approach to resource sharing in reconfigurable manufacturing. The International Journal of Advanced Manufacturing Technology 25:1-2, pages 78-87.
Crossref
Juha‐Miikka Nurmilaakso. (2004) Supply chain scheduling using distributed parallel simulation. Journal of Manufacturing Technology Management 15:8, pages 756-770.
Crossref
Tatsushi Nishi, Masami Konishi & Shinji Hasebe. (2004) A decentralized scheduling method for flowshop problems with resource constraints. Electrical Engineering in Japan 149:1, pages 44-51.
Crossref
N. Liu, M.A. Abdelrahman & S. Ramaswamy. (2004) A multi-agent model for reactive job shop scheduling. A multi-agent model for reactive job shop scheduling.
Tatsushi Nishi, Masami Konishi & Shinji Hasebe. (2003) A Decentralized Scheduling Method for Flowshop Problems with Resource Constraints資源制約を有するフローショップ問題に対する装置を要素とした分散型スケジューリング手法. IEEJ Transactions on Electronics, Information and Systems 123:7, pages 1327-1333.
Crossref
S.S. Heragu, R.J. Graves, Byung-In Kim & A. St Onge. (2002) Intelligent agent based framework for manufacturing systems control. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 32:5, pages 560-573.
Crossref
Riyaz Sikora & Michael J. Shaw. 2002. Business Modelling. Business Modelling
169
185
.
J. Sun & D. Xue. (2001) A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Computers in Industry 46:2, pages 189-207.
Crossref
J.Norberto Pires & J.M.G. Sá da Costa. (2000) Object-oriented and distributed approach for programming robotic manufacturing cells. Robotics and Computer-Integrated Manufacturing 16:1, pages 29-42.
Crossref
Jui Chiew (J. C.) Tan & Patrick T. Harker. (1999) Designing Workflow Coordination: Centralized Versus Market-Based Mechanisms. Information Systems Research 10:4, pages 328-342.
Crossref
N. Jawahar, P. Aravindan, S. G. Ponnambalam & L. N. Raghavendra. (1998) Knowledge-based workcell attribute oriented dynamic schedulers for flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 14:7, pages 514-538.
Crossref
C. Ou-Yang & J.S. Lin. (1998) The development of a hybrid hierarchical/heterarchical shop floor control system applying bidding method in job dispatching. Robotics and Computer-Integrated Manufacturing 14:3, pages 199-217.
Crossref
Albert D Baker. (1998) A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull. Journal of Manufacturing Systems 17:4, pages 297-320.
Crossref
Kap Hwan Kim, Jun Yeob Song & Ki Hong Wang. (1997) A negotiation based scheduling for items with flexible process plans. Computers & Industrial Engineering 33:3-4, pages 785-788.
Crossref
A. Tharumarajah & R. Bemelman. (1997) Approaches and issues in scheduling a distributed shop-floor environment. Computers in Industry 34:1, pages 95-109.
Crossref
Jau-Woie Chang, Shean-Shyong Chiou & Yih-Ping Luh. (1997) Function modules demanded for production control in distributed manufacturing system. The International Journal of Advanced Manufacturing Technology 13:6, pages 434-442.
Crossref
R. Sikora & M.J. Shaw. (1997) Coordination mechanisms for multi-agent manufacturing systems: applications to integrated manufacturing scheduling. IEEE Transactions on Engineering Management 44:2, pages 175-187.
Crossref
Sophie D'Amours, Benoit Montreuil & François Soumis. (1997) Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks. European Journal of Operational Research 96:1, pages 148-166.
Crossref
Kap Hwan Kim, Jong Wook Bae, Joon Yub Song & Hyun Yong Lee. (1996) A distributed scheduling and shop floor control method. Computers & Industrial Engineering 31:3-4, pages 583-586.
Crossref
Pierre Lefrançois, Louis Cloutier & Benoit Montreuil. (1996) An agent-driven approach to design factory information systems. Computers in Industry 32:2, pages 197-217.
Crossref
A. Saad, K. Kawamura, G. Biswas, M.E. Johnson & A. Salama. (1995) Evaluating a contract net-based heterarchical scheduling approach for flexible manufacturing. Evaluating a contract net-based heterarchical scheduling approach for flexible manufacturing.
Olugbenga O. Mejabi. (1994) An Exploration of Concepts in System Integration. Integrated Manufacturing Systems 5:4/5, pages 5-12.
Crossref
K. Iwata, M. Onosato & M. Koike. (1994) Random Manufacturing System: a New Concept of Manufacturing Systems for Production to Order. CIRP Annals 43:1, pages 379-383.
Crossref
Agostino Villa, Paolo Brandimarte & Mario Calderini. 1994. Information and Collaboration Models of Integration. Information and Collaboration Models of Integration
135
145
.
V. Suresh & Dipak Chaudhuri. (1993) Dynamic scheduling—a survey of research. International Journal of Production Economics 32:1, pages 53-63.
Crossref
D. Veeramani, B. Bhargava & M.M. Barash. (1993) Information system architecture for heterarchial control of large FMSs. Computer Integrated Manufacturing Systems 6:2, pages 76-92.
Crossref
K.J. Tilley & D.J. Williams. (1992) Modelling of communications and control in an auction-based manufacturing control system. Modelling of communications and control in an auction-based manufacturing control system.
Paul Rogers. 1991. Manufacturing Cells. Manufacturing Cells
173
194
.
J.R. Drolet, B. Montreuil & C. Moodie. (1989) Decision Architecture for Scheduling Virtual Cellular Manufacturing Systems. IFAC Proceedings Volumes 22:14, pages 99-103.
Crossref
J. Bowen, P. O'Grady, H. Nuttle & M. Terribile. (1989) An artificial intelligence approach to loading workstation resources in a distributed job shop controller. Computer Integrated Manufacturing Systems 2:1, pages 21-28.
Crossref
Michael J. Shaw & Andrew B. Whinston. 1989. Distributed Artificial Intelligence. Distributed Artificial Intelligence
413
429
.
Satyendra P. Rana, Sanjeev Taneja & Ambrish Vashishta. 1989. CAD/CAM Robotics and Factories of the Future. CAD/CAM Robotics and Factories of the Future
37
41
.
Satyendra P. Rana, Sanjeev Taneja & Ambrish Vashishta. 1989. CAD/CAM Robotics and Factories of the Future. CAD/CAM Robotics and Factories of the Future
37
41
.
S. K. Taneja, S. P. Rana, N. Singh, Michael D. Oliff, James Davis, Lorenzo Vicens, Jingfan Paul Yung, Hsu-Pin Ben Wang, Haiping Xu, H. Bera, R. M. Mackowiak, P. H. Cohen, R. A. Wysk, C. Goss, C.-H. Chu, P. Pan, S. P. Pequignot & A. Soom. 1989. CAD/CAM Robotics and Factories of the Future. CAD/CAM Robotics and Factories of the Future
117
164
.
Michael J. Shaw & Andrew B. Whinston. (1988) A distributed knowledge-based approach to flexible automation: The contract net framework. International Journal of Flexible Manufacturing Systems 1:1, pages 85-104.
Crossref