Donald Davendra, Frank Herrmann & Magdalena Bialic-Davendra. (2022) Chaotic Flower Pollination Algorithm for scheduling tardiness-constrained flow shop with simultaneously loaded stations. Neural Computing and Applications.
Crossref
David Garcia, Houda Tlahig, Belgacem Bettayeb & M'hammed Sahnoun. (2021) Evaluation of Dispatching Rules Performance for a DJSSP: Towards their Application in Industry 4.0. Evaluation of Dispatching Rules Performance for a DJSSP: Towards their Application in Industry 4.0.
Jae-Gon Kim, Hong-Bae Jun, June-Young Bang, Jong-Ho Shin & Seong-Hoon Choi. (2020) Minimizing Tardiness Penalty Costs in Job Shop Scheduling under Maximum Allowable Tardiness. Processes 8:11, pages 1398.
Crossref
Donald Davendra, Frank Hermann & Magdalena Bialic-Davendra. (2020) Scheduling Tardiness Constrained Flow Shop with Simultaneously Loaded Stations Using Genetic Algorithm. Scheduling Tardiness Constrained Flow Shop with Simultaneously Loaded Stations Using Genetic Algorithm.
Hegen Xiong, Huali Fan, Guozhang Jiang & Gongfa Li. (2017) A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints. European Journal of Operational Research 257:1, pages 13-24.
Crossref
Jae-Gon Kim, Seung-Kil Lim & June-Young Bang. (2015) Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times. Mathematical Problems in Engineering 2015, pages 1-11.
Crossref
Farhad Ghassemi Tari & Laya Olfat. (2013) Heuristic rules for tardiness problem in flow shop with intermediate due dates. The International Journal of Advanced Manufacturing Technology 71:1-4, pages 381-393.
Crossref
Zhicong Zhang, Kaishun Hu, Shuai Li, Huiyu Huang & Shaoyong Zhao. (2013) Chip Attach Scheduling in Semiconductor Assembly. Journal of Industrial Engineering 2013, pages 1-11.
Crossref
Durgesh Sharma, Suresh Garg & Chitra Sharma. (2012) Multi Objective Optimization in Scheduling of FMS Using Roulette Wheel Selection Process. Advanced Materials Research 622-623, pages 35-39.
Crossref
Tsung-Che Chiang & Li-Chen Fu. (2012) Rule-based scheduling in wafer fabrication with due date-based objectives. Computers & Operations Research 39:11, pages 2820-2835.
Crossref
Zhicong Zhang, Li Zheng, Na Li, Weiping Wang, Shouyan Zhong & Kaishun Hu. (2012) Minimizing mean weighted tardiness in unrelated parallel machine scheduling with reinforcement learning. Computers & Operations Research 39:7, pages 1315-1324.
Crossref
K. Kianfar, S.M.T. Fatemi Ghomi & A. Oroojlooy Jadid. (2012) Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA. Engineering Applications of Artificial Intelligence 25:3, pages 494-506.
Crossref
Tsung-Che Chiang. (2010) Model simplification for accelerating simulation-based evaluation of dispatching rules in wafer fabrication facilities. Model simplification for accelerating simulation-based evaluation of dispatching rules in wafer fabrication facilities.
Yong-Chan Choi, Yeong-Dae Kim & June-Young Bang. (2010) Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines. The International Journal of Advanced Manufacturing Technology 51:9-12, pages 1225-1241.
Crossref
Alexandre Dolgui & Jean-Marie Proth. 2010. Supply Chain Engineering. Supply Chain Engineering
327
369
.
K. Kianfar, S. M. T. Fatemi Ghomi & B. Karimi. (2009) New dispatching rules to minimize rejection and tardiness costs in a dynamic flexible flow shop. The International Journal of Advanced Manufacturing Technology 45:7-8, pages 759-771.
Crossref
Amit Kumar Gupta, Viswanath Kumar Ganesan & Appa Iyer Sivakumar. (2008) Cycle time variance minimization in dynamic scheduling of single machine systems. The International Journal of Advanced Manufacturing Technology 42:5-6, pages 544-552.
Crossref
Atif Shahzad & Nasser Mebarki. (2009) A Study of Tardiness Based Measures for Benchmark Priority Dispatching Rules used in Dynamic Job Shop. IFAC Proceedings Volumes 42:4, pages 1983-1988.
Crossref
Nasser Mebarki & Atif Shahzad. (2008) A procedure to compute a probabilistic bound for the maximum tardiness using stochastic simulation. IFAC Proceedings Volumes 41:2, pages 10534-10539.
Crossref
Gérard Bel & Jean‐Bernard Cavaillé. 2008. Production Scheduling. Production Scheduling
139
165
.
Yan Yan & Guoxin Wang. (2007) A job shop scheduling approach based on simulation optimization. A job shop scheduling approach based on simulation optimization.
Zhicong Zhang, Li Zheng & Michael X. Weng. (2006) Dynamic parallel machine scheduling with mean weighted tardiness objective by Q-Learning. The International Journal of Advanced Manufacturing Technology 34:9-10, pages 968-980.
Crossref
Jean-Marie Proth. (2007) Scheduling: New trends in industrial environment. Annual Reviews in Control 31:1, pages 157-166.
Crossref
K. Natarajan, K. M. Mohanasundaram, B. Shoban Babu, S. Suresh, K. Antony Arokia Durai Raj & C. Rajendran. (2006) Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness. The International Journal of Advanced Manufacturing Technology 31:7-8, pages 751-761.
Crossref
Tsung-Che Chiang & Li-Chen Fu. (2006) A Simulation Study on Dispatching Rules in Semiconductor Wafer Fabrication Facilities with Due Date-based Objectives. A Simulation Study on Dispatching Rules in Semiconductor Wafer Fabrication Facilities with Due Date-based Objectives.
T.J. Chua, F.Y. Wang, T.X. Cai & X.F. Yin. (2006) A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm. A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm.
Paolo Priore, David de la Fuente, Javier Puente & José Parreño. (2006) A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems. Engineering Applications of Artificial Intelligence 19:3, pages 247-255.
Crossref
Christopher D. Geiger, Reha Uzsoy & Haldun Aytuğ. (2006) Rapid Modeling and Discovery of Priority Dispatching Rules: An Autonomous Learning Approach. Journal of Scheduling 9:1, pages 7-34.
Crossref
S. Thiagarajan & Chandrasekharan Rajendran. (2005) Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers & Industrial Engineering 49:4, pages 463-503.
Crossref
R. Alvarez-Valdes, A. Fuertes, J.M. Tamarit, G. Giménez & R. Ramos. (2005) A heuristic to schedule flexible job-shop in a glass factory. European Journal of Operational Research 165:2, pages 525-534.
Crossref
M.S Jayamohan & Chandrasekharan Rajendran. (2004) Development and analysis of cost-based dispatching rules for job shop scheduling. European Journal of Operational Research 157:2, pages 307-321.
Crossref
Dirk C Mattfeld & Christian Bierwirth. (2004) An efficient genetic algorithm for job shop scheduling with tardiness objectives. European Journal of Operational Research 155:3, pages 616-630.
Crossref
Alberto Petroni & Antonio Rizzi. (2002) A fuzzy logic based methodology to rank shop floor dispatching rules. International Journal of Production Economics 76:1, pages 99-108.
Crossref
Yeong-Dae Kim, Geun-Cheol Lee, Seong-Kook Choi & Seung-Kil Lim. (2001) Tool requirements planning in a flexible manufacturing system with an automatic tool transporter. IEEE Transactions on Robotics and Automation 17:6, pages 795-804.
Crossref
M. Jahangirian & G.V. Conroy. (2000) Intelligent dynamic scheduling system: the application of genetic algorithms. Integrated Manufacturing Systems 11:4, pages 247-257.
Crossref
Chandrasekharan Rajendran & Oliver Holthaus. (1999) A comparative study of dispatching rules in dynamic flowshops and jobshops. European Journal of Operational Research 116:1, pages 156-170.
Crossref
Oliver Holthaus. (1999) Scheduling in job shops with machine breakdowns: an experimental study. Computers & Industrial Engineering 36:1, pages 137-162.
Crossref
Yeong-Dae Kim, Jung-Ug Kim, Seung-Kil Lim & Hong-Bae Jun. (1998) Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing 11:1, pages 155-164.
Crossref
Dirk C. Mattfeld & Christian Bierwirth. 1998. Adaptive Computing in Design and Manufacture. Adaptive Computing in Design and Manufacture
59
67
.
O. Holthaus. (1997) Design of efficient job shop scheduling rules. Computers & Industrial Engineering 33:1-2, pages 249-252.
Crossref
Oliver Holthaus & Hans Ziegler. (1997) Look ahead job demanding for improving job shop performance. Operations-Research-Spektrum 19:1, pages 23-29.
Crossref
Oliver Holthaus & Chandrasekharan Rajendran. (1997) Efficient dispatching rules for scheduling in a job shop. International Journal of Production Economics 48:1, pages 87-105.
Crossref
Oliver Holthaus, Otto Rosenberg & Hans Ziegler. 1996. Distributed Information Systems in Business. Distributed Information Systems in Business
123
137
.
Yeong-Dae Kim. (1995) A backward approach in list scheduling algorithms for multi-machine tardiness problems. Computers & Operations Research 22:3, pages 307-319.
Crossref
Min Hee Kim & Yeong-Dae Kim. (1994) Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems 13:2, pages 85-93.
Crossref
Sebastian Engell, Frank Herrmann & Manfred Moser. 1994. Computer control of flexible manufacturing systems. Computer control of flexible manufacturing systems
75
107
.
Harald Dyckhoff, Ulrich Derigs, Marc Salomon & Henk C. TijmsOliver Holthaus & Hans Ziegler. 1994. Operations Research Proceedings 1993. Operations Research Proceedings 1993
157
163
.
THOMAS R. ROHLEDER & GARY SCUDDER. (2009) A COMPARISON OF ORDER‐RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM. Production and Operations Management 2:3, pages 221-238.
Crossref
M. Moser & S. Engell. (1992) A survey of priority rules for FMS scheduling and their performance for the benchmark problem. A survey of priority rules for FMS scheduling and their performance for the benchmark problem.
Yeong-Dae Kim & Candace Arai Yano. (1992) An iterative approach to system setup problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems 4:2, pages 183-209.
Crossref
Marilyn S. Jones & Roberta S. Russell. (1990) Multiple Performance Measures in the Selection of a
Sequencing Rule. International Journal of Operations & Production Management 10:8, pages 29-41.
Crossref
R Ramasesh. (1990) Dynamic job shop scheduling: A survey of simulation research. Omega 18:1, pages 43-57.
Crossref