31
Views
33
CrossRef citations to date
0
Altmetric
Original Articles

An integrated production-inventory model with reprocessing and inspection

&
Pages 1299-1315 | Received 01 Oct 1987, Published online: 07 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (11)

R. Satheesh Kumar & A. Nagarajan. (2023) Inspection strategies for quality products with rewards in a multi-stage production. Journal of Control and Decision 10:4, pages 596-609.
Read now
Mohammad Rezaei-Malek, Ali Siadat, Jean-Yves Dantan & Reza Tavakkoli-Moghaddam. (2019) A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty. International Journal of Production Research 57:19, pages 5951-5973.
Read now
Mohammad Rezaei-Malek, Mehrdad Mohammadi, Jean-Yves Dantan, Ali Siadat & Reza Tavakkoli-Moghaddam. (2019) A review on optimisation of part quality inspection planning in a multi-stage manufacturing system. International Journal of Production Research 57:15-16, pages 4880-4897.
Read now
Adir Even & G. Shankaranarayanan. (2009) Utility Cost Perspectives in Data Quality Management. Journal of Computer Information Systems 50:2, pages 127-135.
Read now
Pablo Biswas & Bhaba R. Sarker. (2008) Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research 46:23, pages 6585-6610.
Read now
S B Yu & J Efstathiou. (2006) Complexity in rework cells: theory, analysis and comparison. Journal of the Operational Research Society 57:5, pages 593-602.
Read now
SampatrajS. Mandroli, AbhishekK. Shrivastava & Yu Ding. (2006) A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes. IIE Transactions 38:4, pages 309-328.
Read now
E J Comeaux & B R Sarker. (2005) Joint optimization of process improvement investments for supplier–buyer cooperative commerce. Journal of the Operational Research Society 56:11, pages 1310-1324.
Read now
Simme DouweP. Flapper, JanC. Fransoo, RobA. C. M. Broekmeulen & Karl Inderfurth. (2002) Planning and control of rework in the process industries: A review. Production Planning & Control 13:1, pages 26-34.
Read now
INDUSHOBHAN. CHENGALUR, DONALDP. BALLOU & HAROLDL. PAZER. (1992) Dynamically determined optimal inspection strategies for serial production processes. International Journal of Production Research 30:1, pages 169-187.
Read now
M. RAGHAVACHARI & GIRIKUMAR TAYI. (1991) Inspection configuration and reprocessing decisions in serial production systems. International Journal of Production Research 29:5, pages 897-911.
Read now

Articles from other publishers (22)

Prerna Gautam, Sumit Maheshwari & Chandra K. Jaggi. (2022) Sustainable production inventory model with greening degree and dual determinants of defective items. Journal of Cleaner Production 367, pages 132879.
Crossref
Prerna Gautam, Sumit Maheshwari, Ahmad Hasan, Amrina Kausar & Chandra K. Jaggi. (2022) Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives. RAIRO - Operations Research 56:1, pages 183-197.
Crossref
Biswajit Sarkar, Mehran Ullah & Seok-Beom Choi. (2019) Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items. Mathematics 7:6, pages 497.
Crossref
Muhammad Tayyab, Biswajit Sarkar & Bernardo Yahya. (2018) Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand. Mathematics 7:1, pages 13.
Crossref
M. Rezaei-Malek, R. Tavakkoli-Moghaddam, A. Siadat & J.-Y. Dantan. (2018) A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system. The International Journal of Advanced Manufacturing Technology 96:9-12, pages 3633-3650.
Crossref
M. Rezaei-Malek, A. Siadat, J.-Y. Dantan & R. Tavakkoli-Moghaddam. (2018) An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System. IFAC-PapersOnLine 51:11, pages 270-275.
Crossref
Muhammad Tayyab & Biswajit Sarkar. (2016) Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate. Journal of Cleaner Production 139, pages 922-934.
Crossref
Tal Raviv. (2012) An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework. OR Spectrum 35:3, pages 609-638.
Crossref
Ali G. Shetwan, Valentin I. Vitanov & Benny Tjahjono. (2011) Allocation of quality control stations in multistage manufacturing systems. Computers & Industrial Engineering 60:4, pages 473-484.
Crossref
Adir Even & G. Shankaranarayanan. (2009) Dual Assessment of Data Quality in Customer Databases. Journal of Data and Information Quality 1:3, pages 1-29.
Crossref
Bhaba R. Sarker, A.M.M. Jamal & Sanjay Mondal. (2008) Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184:3, pages 915-929.
Crossref
Udo Buscher & Gerd Lindner. (2007) Optimizing a production system with rework and equal sized batch shipments. Computers & Operations Research 34:2, pages 515-535.
Crossref
Ruud H. Teunter & Simme Douwe P. Flapper. (2006) A comparison of bottling alternatives in the pharmaceutical industry. Journal of Operations Management 24:3, pages 215-234.
Crossref
Simme Douwe P. Flapper & Ruud H. Teunter. (2004) Logistic planning of rework with deteriorating work-in-process. International Journal of Production Economics 88:1, pages 51-59.
Crossref
M. A. Rahim & K. S. Al-Sultan. 1997. Optimization in Quality Control. Optimization in Quality Control 55 86 .
Haresh Gurnani, Zvi Drezner & Ram Akella. (1996) Capacity planning under different inspection strategies. European Journal of Operational Research 89:2, pages 302-312.
Crossref
M.N. Gopalan & S. Kannan. (1996) Probability of first passage analysis of a two-stage transfer-line production system with storage and rework. Microelectronics Reliability 36:3, pages 403-407.
Crossref
M.N. Gopalan & S. Kannan. (1995) Expected number analysis of a two-server queueing network subject to inter-stage inspection and rework. Computers & Operations Research 22:9, pages 935-946.
Crossref
Ranjit Rebello, Alessandro Agnetis & Pitu B. Mirchandani. (1995) Specialized inspection problems in serial production systems. European Journal of Operational Research 80:2, pages 277-296.
Crossref
M.N. Gopalan & S. Kannan. (1994) Multi‐type Rework in Two‐stage Production Systems. International Journal of Quality & Reliability Management 11:6, pages 38-49.
Crossref
S.K. Goyal, A. Gunasekaran, T. Martikainen & P. Yli-Olli. (1993) Integrating production and quality control policies: A survey. European Journal of Operational Research 69:1, pages 1-13.
Crossref
Christopher S. Tang. (1991) Designing an optimal production system with inspection. European Journal of Operational Research 52:1, pages 45-54.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.