Xiaoqin Wen & Chenhanzhi Wang. (2022) Optimal-Quality Choice and Committed Delivery Time in Build-To-Order Supply Chain. Sustainability 14:18, pages 11746.
Crossref
Nana Wan & Xu Chen. (2019) The role of put option contracts in supply chain management under inflation. International Transactions in Operational Research 26:4, pages 1451-1474.
Crossref
Ata Jalili Marand, Ou Tang & Hongyan Li. (2019) Quandary of service logistics: Fast or reliable?. European Journal of Operational Research 275:3, pages 983-996.
Crossref
Nana Wan & Xu Chen. (2018) Contracts choice for supply chain under inflation. International Transactions in Operational Research 25:6, pages 1907-1925.
Crossref
Guo Li, Mengqi Liu & Xu Guan. (2015) Diversity of payment contracts in a decentralized assembly system. Annals of Operations Research 257:1-2, pages 613-639.
Crossref
Kris Lieckens & Nico Vandaele. (2015) Differential evolution to solve the lot size problem in stochastic supply chain management systems. Annals of Operations Research 242:2, pages 239-263.
Crossref
Cenk ŞAHİN. (2016) Dinamik Teslim Zamanı Atama Problemi için Holonik Sistem Tasarımı. Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi 31:1, pages 149-158.
Crossref
Kevin R. Gue & Hyun Ho Kim. (2015) An approximation model for sojourn time distributions in acyclic multi-server queueing networks. Computers & Operations Research 63, pages 46-55.
Crossref
Nana Wan & Xu Chen. (2015) Supply Chain Bilateral Coordination with Option Contracts under Inflation Scenarios. Discrete Dynamics in Nature and Society 2015, pages 1-16.
Crossref
Nana Wan & Xu Chen. (2015) Bilateral Coordination Strategy of Supply Chain with Bidirectional Option Contracts under Inflation. Mathematical Problems in Engineering 2015, pages 1-16.
Crossref
Guo Li, Mengqi Liu, Zhaohua Wang & Bingzong Peng. (2013) Supply coordination based on bonus policy in assembly under uncertain delivery time. Chinese Journal of Mechanical Engineering 26:2, pages 293-303.
Crossref
George Ioannou & Stavrianna Dimitriou. (2012) Lead time estimation in MRP/ERP for make-to-order manufacturing systems. International Journal of Production Economics 139:2, pages 551-563.
Crossref
Kevin R. Gue & Hyun Ho Kim. (2012) Predicting departure times in multi-stage queueing systems. Computers & Operations Research 39:7, pages 1734-1744.
Crossref
Xiaode Zuo & Jie Deng. (2012) Profit model for supply chain cooperative partnership before and after. Profit model for supply chain cooperative partnership before and after.
Xiaode Zuo, Zhiqiang Guo & Jianpeng Li. (2011) Study on the impact of time factors on supply chain. Study on the impact of time factors on supply chain.
Heng Liu, Yong-kai Ma & Xiao-wo Tang. (2011) The optimal decision of risk-averse retailer under time-sensitive and price-sensitive demand. The optimal decision of risk-averse retailer under time-sensitive and price-sensitive demand.
Wang Yu-yan & Shen Liang. (2010) Study on the delivery response time decision model of TPT-CLSC. Study on the delivery response time decision model of TPT-CLSC.
Xu Qingqing, Zhang Min & Miao Lixin. (2010) A new newsvendor problem with time-based parameters under normally distributed demands. A new newsvendor problem with time-based parameters under normally distributed demands.
Cheng-lin Shen & Xin-xin Zhang. (2009) Pricing and lead time joint decisions in two-echelon supply chain with retailers' competition. Pricing and lead time joint decisions in two-echelon supply chain with retailers' competition.
Chenglin Shen, Xinxin Zhang & Ke Ma. (2009) Coordination contracts for a kind of reverse supply chain based on retailer's delivery time guarantee. Coordination contracts for a kind of reverse supply chain based on retailer's delivery time guarantee.
Jose M Framinan. (2009) Handling variability for robust order promising and fulfilment. Handling variability for robust order promising and fulfilment.
Li Li & Wen-Sheng Yang. (2009) Response Time-Based Supply Chain Contract Coordination Under Time-Sensitive Demand. Response Time-Based Supply Chain Contract Coordination Under Time-Sensitive Demand.
Amir Azaron & Farhad Kianfar. (2008) Due date assignment for multistage assembly systems. Optimization Letters 3:2, pages 199-210.
Crossref
Abdulrahman Alenezi, Scott A. Moses & Theodore B. Trafalis. (2008) Real-time prediction of order flowtimes using support vector regression. Computers & Operations Research 35:11, pages 3489-3503.
Crossref
Hua Feng & Yuanfeng Cui. (2007) Interaction Between Strategic Commitment to Price and Downstream Innovation in Time Sensitive Markets. Interaction Between Strategic Commitment to Price and Downstream Innovation in Time Sensitive Markets.
Nirmal Govind & Theresa Roeder. (2006) Estimating Expected Completion Times with Probabilistic Job Routing. Estimating Expected Completion Times with Probabilistic Job Routing.
Le Xiao-juan, Lin Yong & Yu Jian-hong. (2006) Coordianted Order Decision for Short Life Product Supply Chain Based on Random Delivery Time. Coordianted Order Decision for Short Life Product Supply Chain Based on Random Delivery Time.
Amir Azaron, Hideki Katagiri, Kosuke Kato & Masatoshi Sakawa. (2006) Modelling complex assemblies as a queueing network for lead time control. European Journal of Operational Research 174:1, pages 150-168.
Crossref
Sergio Chayet, Wallace J. Hopp & Xiaowei Xu. 2004. Handbook of Quantitative Supply Chain Analysis. Handbook of Quantitative Supply Chain Analysis
295
334
.
Pinar Keskinocak & Sridhar Tayur. 2004. Handbook of Quantitative Supply Chain Analysis. Handbook of Quantitative Supply Chain Analysis
485
554
.
Nico J. Vandaele & Marc R. Lambrecht. 2003. Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains. Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains
53
85
.
I Sabuncuoglu & A Comlekci. (2002) Operation-based flowtime estimation in a dynamic job shop. Omega 30:6, pages 423-442.
Crossref
Jiaqin Yang & Richard H. Deane. (2002) A lotsize reduction model for just‐in‐time manufacturing systems. Integrated Manufacturing Systems 13:7, pages 471-488.
Crossref
Jae Uck You, Min Young Chung & Dan Keun Sung. (2002) Performance evaluation using an approximation method for sojourn time distributions in an IN/ISDN signaling platform. Computer Communications 25:14, pages 1283-1296.
Crossref
D.P. Song, C. Hicks & C.F. Earl. (2002) Product due date assignment for complex assemblies. International Journal of Production Economics 76:3, pages 243-256.
Crossref
H. Grant, S. Moses & D. Goldsmann. (2002) Using simulation to evaluate buffer adjustment methods in order promising. Using simulation to evaluate buffer adjustment methods in order promising.
Kut C. So. (2000) Price and Time Competition for Service Delivery. Manufacturing & Service Operations Management 2:4, pages 392-409.
Crossref
Wai Ki Ching & Xun Yu Zhou. (2000) Circulant approximation for preconditioning in stochastic automata networks. Computers & Mathematics with Applications 39:3-4, pages 147-160.
Crossref
Mark L. Spearman & Rachel Q. Zhang. (1999) Optimal Lead Time Policies. Management Science 45:2, pages 290-295.
Crossref
Marc R. Lambrecht, Philip L. Ivens & Nico J. Vandaele. (1998) ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling. Management Science 44:11-part-1, pages 1548-1561.
Crossref
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
Jae Uck You, Min Young Chung & Dan Keun Sung. (1998) An approximation method for sojourn time distributions in telecommunication networks. An approximation method for sojourn time distributions in telecommunication networks.
C.N. Hasan & M.L. Spearman. (1995) Determining job completion time distributions in stochastic production environments. Determining job completion time distributions in stochastic production environments.
Stephen R. Lawrence. (1994) Negotiating due-dates between customers and producers. International Journal of Production Economics 37:1, pages 127-138.
Crossref
STEPHEN R. LAWRENCE & ARNOLD H. BUSS. (2009) SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS. Production and Operations Management 3:1, pages 21-37.
Crossref
C. Roger Glassey & Sridhar Seshadri. (1993) Transient flows in queueing systems via closure approximations. Queueing Systems 14:1-2, pages 177-201.
Crossref
Uday S. Karmarkar. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory
287
329
.
Rajan Suri, Jerry L. Sanders & Manjunath Kamath. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory
199
286
.
Abraham Seidmann. 1993. Perspectives in Operations Management. Perspectives in Operations Management
301
320
.
Gabriel R. Bitran & Sriram Dasu. (1992) A review of open queueing network models of manufacturing systems. Queueing Systems 12:1-2, pages 95-133.
Crossref
J.R. Rajasekera, M.R. Murr & K.C. So. (1991) A due-date assignment model for a flow shop with application in a lightguide cable shop. Journal of Manufacturing Systems 10:1, pages 1-7.
Crossref
Erica L. Plambeck. (2003) Optimal Leadtime Differentiation via Diffusion Approximations. SSRN Electronic Journal.
Crossref
Kris Lieckens & Nico Vandaele. (2014) A Decision Support System for the Stochastic Aggregate Planning Problem. SSRN Electronic Journal.
Crossref
Kris Lieckens & Nico Vandaele. (2011) Differential Evolution to Solve the Lot Size Problem in Stochastic Production Systems. SSRN Electronic Journal.
Crossref
Mohsen Elhafsi & Erik Rolland. (2008) Negotiating Price/Delivery Date in a Stochastic Manufacturing Environment. SSRN Electronic Journal.
Crossref