17
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

The use of value-based priorities when early shipments are forbidden†

&
Pages 353-369 | Published online: 28 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

K. K. YANG & C. C. SUM. (1994) A comparison of job shop dispatching rules using a total cost criterion. International Journal of Production Research 32:4, pages 807-820.
Read now
G. D. SCUDDER, T. R. HOFFMANN & T. R. ROHLEDER. (1993) Scheduling with forbidden early shipments: alternative performance criteria and conditions. International Journal of Production Research 31:10, pages 2287-2305.
Read now

Articles from other publishers (13)

Francesco Gentile & K.J. Rogers. (2009) Order release and dispatching in a sequence dependent job shop. Order release and dispatching in a sequence dependent job shop.
S. Thiagarajan & Chandrasekharan Rajendran. (2005) Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers & Industrial Engineering 49:4, pages 463-503.
Crossref
W.-S Yoo & L.A Martin-Vega. (2001) Scheduling single-machine problems for on-time delivery. Computers & Industrial Engineering 39:3-4, pages 371-392.
Crossref
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
Bor-Yuh Leu. (2016) Simulation Analysis of Scheduling Heuristics in a Flow-Line Manufacturing Cell with Two Types of Order Shipment Environments. SIMULATION 66:2, pages 106-116.
Crossref
Bor‐Yuh Leu & John W. Nazemetz. (1995) Comparative analysis of group scheduling heuristics in a flow shop cellular system. International Journal of Operations & Production Management 15:9, pages 143-157.
Crossref
Joel D. Wisner. (1995) A review of the order release policy research. International Journal of Operations & Production Management 15:6, pages 25-40.
Crossref
THOMAS R. ROHLEDER & GARY SCUDDER. (2009) A COMPARISON OF ORDER‐RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM. Production and Operations Management 2:3, pages 221-238.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (2007) An Experimental Comparison of Time‐Based and Economic‐Based Scheduling Methods to Maximize Net Present Value*. Decision Sciences 24:5, pages 1037-1056.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (1993) Comparing performance measures in dynamic job shops: economics vs. time. International Journal of Production Economics 32:2, pages 169-183.
Crossref
Rema Padman & Dwight E. Smith-Daniels. (1993) Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach. European Journal of Operational Research 64:2, pages 295-311.
Crossref
Imtiaz Ahmed & Warren W. Fisher. (2007) Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling*. Decision Sciences 23:3, pages 633-647.
Crossref
Gary D. Scudder, Dwight E. Smith-Daniels & Thomas Rohleder. (1990) Use of the net present value criterion in a random job shop where early shipments are forbidden. Journal of Operations Management 9:4, pages 526-547.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.