Lísia Peroza Ruiz & Adelano Esposito. 2024. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems
641
650
.
Mohammad Hemmati Far, Hassan Haleh & Abbas Saghaei. (2019) A fuzzy bi-objective flexible cell scheduling optimization model under green and energy-efficient strategy using Pareto-based algorithms: SATPSPGA, SANRGA, and NSGA-II. The International Journal of Advanced Manufacturing Technology 105:9, pages 3853-3879.
Crossref
K. C. Bhosale & P. J. Pawar. (2018) Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA). Flexible Services and Manufacturing Journal 31:2, pages 381-423.
Crossref
Ruchir Santuka, Siba Sankar Mahapatra, Prasant Ranjan Dhal & Antaryami Mishra. (2015) An Improved Particle Swarm Optimization Approach for Solving Machine Loading Problem in Flexible Manufacturing System. Journal of Advanced Manufacturing Systems 14:03, pages 167-187.
Crossref
Ranbir Singh, Rajender Singh & B. K. Khan. (2015) A Critical Review of Machine Loading Problem in Flexible Manufacturing System. World Journal of Engineering and Technology 03:04, pages 271-290.
Crossref
Shashikant Burnwal & Sankha Deb. (2012) Scheduling optimization of flexible manufacturing system using cuckoo search-based approach. The International Journal of Advanced Manufacturing Technology 64:5-8, pages 951-959.
Crossref
Vijay M Kumar, ANN Murthy & K Chandrashekara. (2012) A hybrid algorithm optimization approach for machine loading problem in flexible manufacturing system. Journal of Industrial Engineering International 8:1.
Crossref
Murat Arıkan & Serpil Erol. (2011) A hybrid simulated annealing-tabu search algorithm for the part selection and machine loading problems in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 59:5-8, pages 669-679.
Crossref
Hyung-Won Kim, Jae-Min Yu, Ji-Su Kim, Hyoung-Ho Doh, Dong-Ho Lee & Sung-Ho Nam. (2011) Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints. The International Journal of Advanced Manufacturing Technology 58:5-8, pages 683-691.
Crossref
Umi Kalsom Yusof, Rahmat Budiarto, Ibrahim Venkat & Safaai Deris. (2011) Machine Loading Optimization in Flexible Manufacturing System Using a Hybrid of Bio-inspired and Musical-Composition Approach. Machine Loading Optimization in Flexible Manufacturing System Using a Hybrid of Bio-inspired and Musical-Composition Approach.
Nitesh Khilwani, J. A. Harding & Nishikant Mishra. 2011. Evolutionary Computing in Advanced Manufacturing. Evolutionary Computing in Advanced Manufacturing
123
150
.
Mayank K. Pandey. 2011. Evolutionary Computing in Advanced Manufacturing. Evolutionary Computing in Advanced Manufacturing
95
121
.
Umi Kalsom Yusof, Rahmat Budiarto & Safaai Deris. (2011) Harmony search algorithm for flexible manufacturing system (FMS) machine loading problem. Harmony search algorithm for flexible manufacturing system (FMS) machine loading problem.
P. R. Dhall, S. S. Mahapatra, S. Datta & A. Mishra. (2010) An improved artificial immune system for solving loading problems in flexible manufacturing systems. An improved artificial immune system for solving loading problems in flexible manufacturing systems.
M.K. Tiwari, Sujit Kumar Jha & Raj Bardhan Anand. (2010) Operation allocation and part type selection in E-manufacturing: An auction based heuristic supported by agent technology. Robotics and Computer-Integrated Manufacturing 26:4, pages 312-324.
Crossref
Selin Özpeynirci & Meral Azizoğlu. (2009) Bounding approaches for operation assignment and capacity allocation problem in flexible manufacturing systems. Computers & Operations Research 36:9, pages 2531-2540.
Crossref
M. K. Tiwari & M. K. Pandey. 2009. Collaborative Design and Planning for Digital Manufacturing. Collaborative Design and Planning for Digital Manufacturing
217
244
.
Sandhyarani Biswas & S. S. Mahapatra. (2007) Modified particle swarm optimization for solving machine-loading problems in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 39:9-10, pages 931-942.
Crossref
Anoop Prakash, Nitesh Khilwani, M.K. Tiwari & Yuval Cohen. (2008) Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems. Advances in Engineering Software 39:3, pages 219-232.
Crossref
Nitesh Khilwani, Anoop Prakash, Ravi Shankar & M.K. Tiwari. (2008) Fast clonal algorithm. Engineering Applications of Artificial Intelligence 21:1, pages 106-128.
Crossref
M.K. Tiwari, J. Saha & S.K. Mukhopadhyay. (2008) Part-selection and machine-loading problems in a flexible manufacturing system environment: a heuristic approach based on reallocation paradigm. International Journal of Computer Applications in Technology 32:2, pages 142.
Crossref
Zhou Bing hai, Wang Shi jin & Xi Li feng. (2008) Agent-based decision support system for dynamic scheduling of a flexible manufacturing system. International Journal of Computer Applications in Technology 32:1, pages 47.
Crossref
M. Yogeswaran, S. G. Ponnambalam & M. K. Tiwari. (2007) An hybrid heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in FMS. An hybrid heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in FMS.
Tilak Raj, Ravi Shankar & Mohammed Suhaib. (2007) A review of some issues and identification of some barriers in the implementation of FMS. International Journal of Flexible Manufacturing Systems 19:1, pages 1-40.
Crossref
Akhilesh Kumar, Prakash, M.K. Tiwari, Ravi Shankar & Alok Baveja. (2006) Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm. European Journal of Operational Research 175:2, pages 1043-1069.
Crossref
M.K. Tiwari, S. Kumar, S. Kumar, Prakash & R. Shankar. (2006) Solving Part-Type Selection and Operation Allocation Problems in an FMS: An Approach Using Constraints-Based Fast Simulated Annealing Algorithm. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 36:6, pages 1170-1184.
Crossref
N. Nagarjuna, O. Mahesh & K. Rajagopal. (2006) A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing 22:4, pages 342-352.
Crossref
A K Choudhary, M K Tiwari & J A Harding. (2006) Part Selection and Operation-Machine Assignment in a Flexible Manufacturing System Environment: A Genetic Algorithm with Chromosome Differentiation-Based Methodology. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:5, pages 677-694.
Crossref
Rahul Swarnkar & M.K. Tiwari. (2004) Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robotics and Computer-Integrated Manufacturing 20:3, pages 199-209.
Crossref
F.T.S. Chan, R. Swarnkar & M.K. Tiwari. (2004) A random search approach to the machine loading problem of an FMS. A random search approach to the machine loading problem of an FMS.
C.N. Potts & J.D. Whitehead. (2001) Workload balancing and loop layout in the design of a flexible manufacturing system. European Journal of Operational Research 129:2, pages 326-336.
Crossref
A.I. Abdelmola, S.M. Taboun & S. Merchawi. (1998) Productivity optimization of cellular manufacturing systems. Computers & Industrial Engineering 35:3-4, pages 403-406.
Crossref
Kidong Kim, Hyung Sang Hahn, Chankwon Park, Namkyu Park, Young Soo Lee & Jinwoo Park. (1997) A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment. IFAC Proceedings Volumes 30:14, pages 19-24.
Crossref
Divakar Rajamani & Gajendra Kumar Adil. (1996) Machine loading in flexible manufacturing systems considering routeing flexibility. The International Journal of Advanced Manufacturing Technology 11:5, pages 372-380.
Crossref
Alessandro Agnetis. (1996) Planning the routing mix in FASs to minimize total transportation time. International Journal of Flexible Manufacturing Systems 8:2, pages 131-157.
Crossref
B. Srivastava & Wun-Hwa Chen. (1996) Heuristic solutions for loading in flexible manufacturing systems. IEEE Transactions on Robotics and Automation 12:6, pages 858-868.
Crossref
Mohamed Ben-Daya. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology
113
139
.
A. Gunasekaran, T. Martikainen & P. Yli-Olli. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology
3
44
.
Chang-Yong Song, Hark Hwang & Yeong-Dae Kim. (1995) Heuristic algorithm for the tool movement policy in flexible manufacturing systems. Journal of Manufacturing Systems 14:3, pages 160-168.
Crossref
Hiroshi Kayayama. (1994) FMS tool change schemes and their characteristics. Computers & Industrial Engineering 27:1-4, pages 75-80.
Crossref
Ming Liang. (1994) Integrating machining speed, part selection and machine loading decisions in flexible manufacturing systems. Computers & Industrial Engineering 26:3, pages 599-608.
Crossref
R.S. Lashkari & M. Duan. (1994) Mathematical modelling of a loading problem in flexible assembly systems. Computers & Industrial Engineering 26:2, pages 243-251.
Crossref
Ming Liang. (1993) Part selection, machine loading, and machining speed selection in flexible manufacturing systems. Computers & Industrial Engineering 25:1-4, pages 259-262.
Crossref
A. Gunasekaran, T. Martikainen & P. Yli-Olli. (1993) Flexible manufacturing systems: An investigation for research and applications. European Journal of Operational Research 66:1, pages 1-26.
Crossref
Tarun Gupta & Eltayeb Abuelyaman. (1992) A two-phase procedure for the study of computer network reliability in automated manufacturing systems. Computers in Industry 20:3, pages 335-344.
Crossref
Dharmaraj Veeramani, David M. Upton & Moshe M. Barash. (1992) Cutting-tool management in computer-integrated manufacturing. International Journal of Flexible Manufacturing Systems 4:3-4, pages 237-265.
Crossref