20
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

A simulation study of part sequencing in a flexible assembly cell

, &
Pages 1769-1793 | Received 01 May 1988, Published online: 30 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

YING-CHIN HO & COLINL. MOODIE. (1994) A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system. International Journal of Computer Integrated Manufacturing 7:3, pages 163-174.
Read now

Articles from other publishers (9)

Tero Keski-Valkama. (2017) A Simulator for Event-oriented Data in Flexible Assembly System Fault Prediction. Procedia Computer Science 119, pages 121-130.
Crossref
O. V. Krishnaiah Chetty & O. C. Gnanasekaran. (1996) Modelling, simulation and scheduling of flexible assembly systems with coloured Petri nets. The International Journal of Advanced Manufacturing Technology 11:6, pages 430-438.
Crossref
R. Lau & J. Favrel. (1995) On-off scheduling. On-off scheduling.
Mohamed Ben-Daya. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology 113 139 .
A. Gunasekaran, T. Martikainen & P. Yli-Olli. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology 3 44 .
Roger A. Lindau, Thomas Kanflo & Kenth R. Lumsden. (1994) Impact of Real‐time Information for Scheduling a Car‐body Shop – A Simulation Study. International Journal of Operations & Production Management 14:3, pages 114-125.
Crossref
Shu-Chu Liu & Li Lin. (1993) Dynamic sequencing of robot moves in a manufacturing cell. European Journal of Operational Research 69:3, pages 482-497.
Crossref
A. Gunasekaran, T. Martikainen & P. Yli-Olli. (1993) Flexible manufacturing systems: An investigation for research and applications. European Journal of Operational Research 66:1, pages 1-26.
Crossref
S.M. Taboun, S. Sankaran & S. Bhole. (1991) Comparison and evaluation of similarity measures in group technology. Computers & Industrial Engineering 20:3, pages 343-353.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.