93
Views
52
CrossRef citations to date
0
Altmetric
Original Articles

A model for the design of zone control automated guided vehicle systems

Pages 1741-1758 | Received 01 Dec 1989, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (14)

F. Fred Choobineh, Ardavan Asef-Vaziri & Xiaolei Huang. (2012) Fleet sizing of automated guided vehicles: a linear programming approach based on closed queuing networks. International Journal of Production Research 50:12, pages 3222-3235.
Read now
A. Gnanavel Babu, J. Jerald, A. Noorul Haq, V. Muthu Luxmi & T.P. Vigneswaralu. (2010) Scheduling of machines and automated guided vehicles in FMS using differential evolution. International Journal of Production Research 48:16, pages 4683-4699.
Read now
Reza Zanjirani Farahani, Behrooz Karimi & Sara Tamadon. (2007) Designing an efficient method for simultaneously determining the loop and the location of the P/D stations using genetic algorithm. International Journal of Production Research 45:6, pages 1405-1427.
Read now
Naiqi Wu & Wenqu Zeng. (2002) Deadlock avoidance in an automated guidance vehicle system using a coloured Petri net model. International Journal of Production Research 40:1, pages 223-238.
Read now
D.Y. Sha & Ling-Feng Hsieh. (2000) A design of the load routing problem in a tandem AGV system. Journal of the Chinese Institute of Industrial Engineers 17:1, pages 103-110.
Read now
JOHNE. KOBZA, YU-CHENG SHEN & RODERICKJ. REASOR. (1998) A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems. IIE Transactions 30:2, pages 133-142.
Read now
C. J. MALMBORG. (1996) An integrated materials handling model for machine location in existing facilities. International Journal of Production Research 34:4, pages 1145-1159.
Read now
C.-C. LEE & J. T. LIN. (1995) Deadlock prediction and avoidance based on Petri nets for zone-control automated guided vehicle systems. International Journal of Production Research 33:12, pages 3249-3265.
Read now
C. J. MALMBORG. (1994) Heuristic, storage space minimization methods for facility layouts served by looped AGV systems. International Journal of Production Research 32:11, pages 2695-2710.
Read now
C. J. MALMBORG. (1994) A heuristic model for simultaneous storage space allocation and block layout planning. International Journal of Production Research 32:3, pages 517-530.
Read now
J. T. LIN, C. C. K. CHANG & WEN-CHUNG LIU. (1994) A load-routeing problem in a tandem-configuration automated guided-vehicle system. International Journal of Production Research 32:2, pages 411-427.
Read now
G. ULUSOY & Ü BILGE. (1993) Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research 31:12, pages 2857-2873.
Read now
K. RAVI RAJU & O. V. KRISHNAIAH CHETTY. (1993) Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed Petri net-based approach. International Journal of Production Research 31:5, pages 1069-1096.
Read now
CHIH-MING LIU & SHYH-HAI DUH. (1992) Study of AGVS design and dispatching rules by analytical and simulation methods. International Journal of Computer Integrated Manufacturing 5:4-5, pages 290-299.
Read now

Articles from other publishers (38)

Jean-Lou De Carufel, Darryl Hill, Anil Maheshwari, Sasanka Roy & Luís Fernando Schultz Xavier da Silveira. (2023) Constant delay lattice train schedules. Discrete Applied Mathematics 339, pages 1-10.
Crossref
Venkata Ranga Surya Prasad Alla, Nageswara Rao Medikondu, Prakash Babu Kanakavalli & Vijaya Prakash Ravulapalli. (2023) Design and development of mixed integer programming model for scheduling tasks through artificial intelligence. International Journal on Interactive Design and Manufacturing (IJIDeM).
Crossref
Martin Marschall, Milan Gregor, Lukáš Ďurica, Vladimír Vavrík, Tomáš Bielik, Patrik Grznár & Štefan Mozol. (2022) Defining the Number of Mobile Robotic Systems Needed for Reconfiguration of Modular Manufacturing Systems via Simulation. Machines 10:5, pages 316.
Crossref
Aleksander Nieoczym, Jacek Caban, Ondrej Stopka, Tomasz Krajka & Mária Stopková. (2021) The planning process of transport tasks for autonomous vans. Open Engineering 11:1, pages 871-879.
Crossref
Aleksander Nieoczym, Jacek Caban, Agnieszka Dudziak & Monika Stoma. (2020) Autonomous vans - the planning process of transport tasks. Open Engineering 10:1, pages 18-25.
Crossref
Puneeth Valmiki, Abhinav Simha Reddy, Gowtham Panchakarla, Kranthi Kumar, Rajesh Purohit & Amit Suhane. (2018) A Study on Simulation Methods for AGV Fleet Size Estimation in a Flexible Manufacturing System. Materials Today: Proceedings 5:2, pages 3994-3999.
Crossref
K.C Bhosale & P.J. Pawar. (2018) Material Flow Optimisation of Flexible Manufacturing System using Real Coded Genetic Algorithm (RCGA). Materials Today: Proceedings 5:2, pages 7160-7167.
Crossref
Shayan Kavakeb, Trung Thanh Nguyen, Zaili Yang & Ian Jenkinson. (2016) Evolutionary Fleet Sizing in Static and Uncertain Environments with Shuttle Transportation Tasks-The Case Studies of Container Terminals [Application Notes]. IEEE Computational Intelligence Magazine 11:1, pages 55-69.
Crossref
F. Nieuwkoop, F. Corman, R.R. Negenborn, M.B. Duinkerken, M. van Schuylenburg & G. Lodewijks. (2014) Decision support for vehicle configuration determination in Inter Terminal Transport system design. Decision support for vehicle configuration determination in Inter Terminal Transport system design.
D Herrero-Perez & H Martinez-Barbera. (2010) Modeling Distributed Transportation Systems Composed of Flexible Automated Guided Vehicles in Flexible Manufacturing Systems. IEEE Transactions on Industrial Informatics 6:2, pages 166-180.
Crossref
Mohammed Ali & Wasif Ullah Khan. (2017) Implementation Issues of AGVs in Flexible Manufacturing System : A Review. Global Journal of Flexible Systems Management 11:1-2, pages 55-61.
Crossref
Tilak Raj, Ravi Shankar & Mohammed Suhaib. (2007) A review of some issues and identification of some barriers in the implementation of FMS. International Journal of Flexible Manufacturing Systems 19:1, pages 1-40.
Crossref
NaiQi Wu & MengChu Zhou. (2007) Shortest Routing of Bidirectional Automated Guided Vehicles Avoiding Deadlock and Blocking. IEEE/ASME Transactions on Mechatronics 12:1, pages 63-72.
Crossref
Iris F.A. Vis. (2006) Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research 170:3, pages 677-709.
Crossref
S. Arora & A.K. Mittal. (2006) A priority based conflict resolution approach for automated guided vehicles. A priority based conflict resolution approach for automated guided vehicles.
Naiqi Wu & MengChu Zhou. (2005) Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles. IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics) 35:6, pages 1193-1202.
Crossref
Pyung-Hoi Koo, Jaejin Jang & Jungdae Suh. (2004) Estimation of Part Waiting Time and Fleet Sizing in AGV Systems. International Journal of Flexible Manufacturing Systems 16:3, pages 211-228.
Crossref
Naiqi Wu & MengChu Zhou. (2003) AGV routing for conflict resolution in AGV systems. AGV routing for conflict resolution in AGV systems.
Philippe Chevalier, Yves Pochet & Laurence Talbot. 2002. Quantitative Approaches to Distribution Logistics and Supply Chain Management. Quantitative Approaches to Distribution Logistics and Supply Chain Management 309 329 .
Naiai Wu & Mengchu Zhou. (2001) Resource-oriented Petri nets in deadlock avoidance of AGV systems. Resource-oriented Petri nets in deadlock avoidance of AGV systems.
Wooyeon Yu & Pius J. Egbelu. (2001) Design of a variable path tandem layout for automated guided vehicle systems. Journal of Manufacturing Systems 20:5, pages 305-319.
Crossref
Ignacio Castillo, Sergio A. Reyes & Brett A. Peters. (2001) Modeling and analysis of tandem AGV systems using generalized stochastic Petri nets. Journal of Manufacturing Systems 20:4, pages 236-249.
Crossref
Eileen Bordelon Hoff & Bhaba R. Sarker. (1998) An overview of path design and dispatching methods for automated guided vehicles. Integrated Manufacturing Systems 9:5, pages 296-307.
Crossref
Gündüz Ulusoy, Funda Sivrikaya-Şerifoǧlu & Ümit Bilge. (1997) A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Operations Research 24:4, pages 335-351.
Crossref
Yu-Cheng Shen & L.K. Lau. (1997) Planning of flow path to minimize expected waiting time for free-ranging automated guided vehicle systems. Planning of flow path to minimize expected waiting time for free-ranging automated guided vehicle systems.
Edward A. Ross, Farzad Mahmoodi & Charles T. Mosier. (2007) Tandem Configuration Automated Guided Vehicle Systems: A Comparative Study*. Decision Sciences 27:1, pages 81-102.
Crossref
David Sinriech. (1995) Network design models for discrete material flow systems: A literature review. The International Journal of Advanced Manufacturing Technology 10:4, pages 277-291.
Crossref
Mehdi Kaighobadi & Kurapati Venkatesh. (1994) Flexible Manufacturing Systems: An Overview. International Journal of Operations & Production Management 14:4, pages 26-49.
Crossref
Charles J. Malmborg & Yu-Cheng Shen. (1994) Heuristic dispatching models for multi-vehicle materials handling systems. Applied Mathematical Modelling 18:3, pages 124-133.
Crossref
C.J. Malmborg. (1994) Materials handling interface models for storage systems design. Materials handling interface models for storage systems design.
C.J. Malmborg. (1994) A concurrent facility design procedure for flexible manufacturing systems. A concurrent facility design procedure for flexible manufacturing systems.
C. J. Malmborg. 1994. Material Flow Systems in Manufacturing. Material Flow Systems in Manufacturing 138 156 .
K. Ravi Raju & O.V. Krishnaiah Chetty. (1993) Addressing design and control issues of AGV-based FMSs with Petri net aided simulation. Computer Integrated Manufacturing Systems 6:2, pages 125-134.
Crossref
Gündüz Ulusoy & Ümit Bilge. (1992) Simultaneous Scheduling of Machines and Material Handling System in an FMS. IFAC Proceedings Volumes 25:8, pages 15-25.
Crossref
Charles J. Malmborg. (1992) A decision support system for automated guided vehicle system design. Applied Mathematical Modelling 16:4, pages 170-180.
Crossref
C.J. Malmborg & L.M. Berrings. (1992) A decision support system for the design of batch manufacturing system. A decision support system for the design of batch manufacturing system.
Charles J. Malmborg. (1991) Tightened analytical bounds on the impact of dispatching rules in automated guided vehicle systems. Applied Mathematical Modelling 15:6, pages 305-311.
Crossref
C.J. Malmborg & Y.-C. Shen. (1991) Simulation based validation of real time control rules in discrete materials handling systems. Simulation based validation of real time control rules in discrete materials handling systems.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.