Chen-Yang Cheng, Shu-Fen Li, Chia-Leng Lee, Ranon Jientrakul & Chumpol Yuangyai. (2022) A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing. Sustainability 14:2, pages 697.
Crossref
Hector Miguel, Gastelum-Gonzalez, Luis Antonio, Gama Moreno, Ana Luisa & Garcia-Corralejo. (2021) Hybrid Push-Pull Systems: Classification, Optimal Methods and Uncertainty. Hybrid Push-Pull Systems: Classification, Optimal Methods and Uncertainty.
George Varlas, Michael Vidalis, Stelios Koukoumialos & Alexandros Diamantidis. (2021) Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand. TOP 29:3, pages 799-832.
Crossref
Nai-Yuan Chiang, Yiqing Lin & Quan Long. (2020) Efficient propagation of uncertainties in manufacturing supply chains: Time buckets, L-leap, and multilevel Monte Carlo methods. Operations Research Perspectives 7, pages 100144.
Crossref
Chukwunonyelum Emmanuel Onyeocha, Jiayi Wang, Joseph Khoury & John Geraghty. (2015) A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system. Operations Research Perspectives 2, pages 137-149.
Crossref
추봉성. (2015) A Simulation Approach for Selection of Push/Pull Production System with Delivery Delay. Journal of Distribution and Management Research 18:2, pages 15-22.
Crossref
Afnan Eliyan, Hamsa Delghan & Fatih Mutlu. (2015) The impact of production scheduling policies and buffer zone size in process synchronization an application in the primary aluminum industry. The impact of production scheduling policies and buffer zone size in process synchronization an application in the primary aluminum industry.
Philipp Dickmann, Michael F. Zäh, Niklas Möller, Hermann Lödding, Thomas Rücker, Herfried M. Schneider, Eva Dickmann, Joachim Hirsch, Christian Schliederer, Christine Wendlinger, Stefan Hartmann, Johann Gillinger, Bernhard Nied, Klaus Dräxler & Holm Fischäder. 2015. Schlanker Materialfluss. Schlanker Materialfluss
179
284
.
Daryl Powell. 2014. Handbook of Research on Design and Management of Lean Production Systems. Handbook of Research on Design and Management of Lean Production Systems
188
205
.
Ashkan Memari, Abdul Rahman Bin Abdul Rahim & Robiah Binti Ahmad. 2014. Modern Advances in Applied Intelligence. Modern Advances in Applied Intelligence
430
439
.
Yan-Hong Wang, Lin Wang & Cui Yue. (2013) Simulation on the Push/Conwip Control Mode for Manufacturing Process. Simulation on the Push/Conwip Control Mode for Manufacturing Process.
Daryl John Powell, Ilker Bas & Erlend Alfnes. 2013. Advances in Production Management Systems. Sustainable Production and Service Supply Chains. Advances in Production Management Systems. Sustainable Production and Service Supply Chains
485
492
.
Pedro L. González-R, José M. Framinan & Henry Pierreval. (2011) Token-based pull production control systems: an introductory overview. Journal of Intelligent Manufacturing 23:1, pages 5-22.
Crossref
Simon Emde & Nils Boysen. (2012) Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. International Journal of Production Economics 135:1, pages 393-402.
Crossref
Simon Emde & Nils Boysen. (2011) Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. European Journal of Operational Research.
Crossref
Christoph KarrerChristoph Karrer. 2012. Engineering Production Control Strategies. Engineering Production Control Strategies
7
36
.
Roman van der Krogt, John Geraghty, Mustafa Ramzi Salman & James Little. (2009) On supporting Lean methodologies using constraint-based scheduling. Journal of Scheduling 13:4, pages 301-314.
Crossref
Muris Lage Junior & Moacir Godinho Filho. (2010) Variations of the kanban system: Literature review and classification. International Journal of Production Economics 125:1, pages 13-21.
Crossref
HUI-MING WEE, SHU-YUN PENG & CHING-CHOW YANG. (2011) A COMPARATIVE STUDY OF TAIWANESE PRODUCTION MANAGEMENT SYSTEM WITH DIFFERENT OUTSOURCING STRATEGY. Journal of Advanced Manufacturing Systems 08:02, pages 193-203.
Crossref
Naoufel Cheikhrouhou, Christoph Hachen & Rémy Glardon. (2009) A Markovian model for the hybrid manufacturing planning and control method ‘Double Speed Single Production Line’. Computers & Industrial Engineering 57:3, pages 1022-1032.
Crossref
Sanjay Sharma & Narayan Agrawal. (2009) Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm. Computers & Operations Research 36:5, pages 1622-1632.
Crossref
J.T. Lin, F.K. Wang & C.C. Peng. (2008) Lot release times and dispatching rule for a TFT-LCD cell process. Robotics and Computer-Integrated Manufacturing 24:2, pages 228-238.
Crossref
Mohammad D. Al‐Tahat & Ibrahim A. Rawabdeh. (2008) Stochastic analysis and design of CONWIP controlled production systems. Journal of Manufacturing Technology Management 19:2, pages 253-273.
Crossref
Ju-Hua Mo, Min Huang & Xing-Wei Wang. (2007) Optimal Design of the Real-Time Production Control System for a General Single-Product Assembly Line Based on Fuzzy Logic Control, Genetic Algorithm and Simulation. Optimal Design of the Real-Time Production Control System for a General Single-Product Assembly Line Based on Fuzzy Logic Control, Genetic Algorithm and Simulation.
J.T. Lin, F.K. Wang & Y.M. Chang. (2006) A hybrid push/pull-dispatching rule for a photobay in a 300mm wafer fab. Robotics and Computer-Integrated Manufacturing 22:1, pages 47-55.
Crossref
John Geraghty & Cathal Heavey. 2006. Stochastic Modeling of Manufacturing Systems. Stochastic Modeling of Manufacturing Systems
307
329
.
John Geraghty & Cathal Heavey. (2004) A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies. International Journal of Production Economics 91:1, pages 75-90.
Crossref
Zhao Xiaobo, Qiguo Gong & Kenichi Nakashima. (2001) Analysis of a production system in a general configuration. Naval Research Logistics 48:2, pages 128-143.
Crossref
Gang Xiong, Guang-Yu Xiong & T.R. Nyberg. (2001) Push/pull based production plan and schedule strategy. Push/pull based production plan and schedule strategy.
W.H Ip, Y Li, K.F Man & K.S Tang. (2000) Multi-product planning and scheduling using genetic algorithm approach. Computers & Industrial Engineering 38:2, pages 283-296.
Crossref
Hitoshi Tsubone, Masahiko Suzuki, Toshifumi Uetake & Masaaki Ohba. (2007) A Comparison between Basic Cyclic Scheduling and Variable Cyclic Scheduling in a Two‐stage Hybrid Flow Shop. Decision Sciences 31:1, pages 197-222.
Crossref
Surendra M. Gupta, Yousef A.Y. Al‐Turki & Ronald F. Perry. (1999) Flexible kanban system. International Journal of Operations & Production Management 19:10, pages 1065-1093.
Crossref
W.C. Benton & Hojung Shin. (1998) Manufacturing planning and control: The evolution of MRP and JIT integration. European Journal of Operational Research 110:3, pages 411-440.
Crossref
Y. Li, W.H. Ip & D.W. Wang. (1998) Genetic algorithm approach to earliness and tardiness production scheduling and planning problem. International Journal of Production Economics 54:1, pages 65-76.
Crossref
P.C. Pandey & Porntep Khokhajaikiat. (1996) Performance modeling of multistage production systems operating under hybrid push/pull control. International Journal of Production Economics 43:2-3, pages 115-126.
Crossref
Katsuhiko Takahashi & Michio Soshiroda. (1996) Comparing integration strategies in production ordering systems. International Journal of Production Economics 44:1-2, pages 83-89.
Crossref
P.C. Pandey & Porntep Khokhajaikiat. (1996) Performance modeling of multistage production systems operating under hybrid push/pull control. International Journal of Production Economics 43:1, pages 17-28.
Crossref
Dingwei Wang. (1995) Earliness/tardiness production planning approaches for manufacturing systems. Computers & Industrial Engineering 28:3, pages 425-436.
Crossref
Y. Li Assistant & D. W. Wang. 1995. Computer Applications in Production Engineering. Computer Applications in Production Engineering
341
348
.
Harald Schmidbauer & Angi Rösch. (1994) A stochastic model of an unreliable kanban production system. OR Spektrum 16:2, pages 155-160.
Crossref
Katsuhiko Takahashi, Shusaku Hiraki & Michio Soshiroda. (1994) Pull-Push integration in production ordering systems. International Journal of Production Economics 33:1-3, pages 155-161.
Crossref
James C. Chen & Arne Thesen. 1994. Handbook of Expert Systems Applications in Manufacturing Structures and rules. Handbook of Expert Systems Applications in Manufacturing Structures and rules
288
302
.
A. Gunasekaran, S.K. Goyal, T. Martikainen & P. Yli-Olli. (1993) Modelling and analysis of just-in-time manufacturing systems. International Journal of Production Economics 32:1, pages 23-37.
Crossref
Dingwei Wang. (1993) Optimization of Control Strategies and Buffer Sizes in Discrete Manufacturing Systems. IFAC Proceedings Volumes 26:2, pages 261-264.
Crossref
Dingwei Wang & T.J. Hodgson. (1992) A Coordinated Decentralized Control Method for the Economic Development of China. IFAC Proceedings Volumes 25:16, pages 63-67.
Crossref