33
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Data-driven generic simulators for flexible manufacturing systems

&
Pages 1795-1810 | Received 01 Oct 1990, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (11)

Yong-Hong Kuo & Andrew Kusiak. (2019) From data to big data in production research: the past and future trends. International Journal of Production Research 57:15-16, pages 4828-4853.
Read now
Zeki Ayağ. (2010) A combined fuzzy AHP-simulation approach to CAD software selection. International Journal of General Systems 39:7, pages 731-756.
Read now
Z. Ayağ. (2007) A hybrid approach to machine-tool selection through AHP and simulation. International Journal of Production Research 45:9, pages 2029-2050.
Read now
Z. Ayag . (2005) An integrated approach to evaluating conceptual design alternatives in a new product development environment. International Journal of Production Research 43:4, pages 687-713.
Read now
Zeki Ayag. (2002) An analytic-hierarchy-process based simulation model for implementation and analysis of computer-aided systems. International Journal of Production Research 40:13, pages 3053-3073.
Read now
W. R. GOODAL & R. ROY. (1996) Short term scheduling and control in the batch process industry using hybrid knowledge based simulation. International Journal of Production Research 34:1, pages 33-50.
Read now
K. R. CHRISTENSON & C. A. DOGAN‡. (1995) A simulation generator for dual-card kanban-controlled flow shops. International Journal of Production Research 33:9, pages 2615-2631.
Read now
W. WANG, K. POPPLEWELL & R. BELL. (1993) An integrated multi-view system description approach to approximate factory modelling. International Journal of Computer Integrated Manufacturing 6:3, pages 165-174.
Read now
ROBERTM. O'KEEFE & THEYSAN KASIRAJAN. (1992) Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research 30:8, pages 1753-1772.
Read now
GERALDW. EVANS & JORGE HADDOCK. (1992) Modelling tools for flexible manufacturing systems. Production Planning & Control 3:2, pages 158-167.
Read now

Articles from other publishers (10)

Chen Xie & Theodore T. Allen. (2015) Simulation and experimental design methods for job shop scheduling with material handling: a survey. The International Journal of Advanced Manufacturing Technology 80:1-4, pages 233-243.
Crossref
Thembelani Sithebe. (2013) Generic Simulation of an Automated Assembly. Advanced Materials Research 740, pages 14-26.
Crossref
Doug Love & Peter Ball. 2009. Rapid Modelling for Increasing Competitiveness. Rapid Modelling for Increasing Competitiveness 143 154 .
Mahdi Nasereddin, Michael A. Mullens & Dayana Cope. (2007) Automated simulator development: A strategy for modeling modular housing production. Automation in Construction 16:2, pages 212-223.
Crossref
E. KehrisZ. Doulgeri. (2016) Improving Simulation Project Efficiency Using Web Technology. SIMULATION 78:9, pages 568-579.
Crossref
Denis Borenstein. (2000) A directed acyclic graph representation of routing manufacturing flexibility. European Journal of Operational Research 127:1, pages 78-93.
Crossref
Haldun Aytug ̄ & Can A. Dog ̄an. (1998) A framework and a simulation generator for kanban-controlled manufacturing systems. Computers & Industrial Engineering 34:2, pages 337-350.
Crossref
S.K. Goyal, Kapil Mehta, Rambabu Kodali & S.G. Deshmukh. (1995) Simulation for analysis of scheduling rules for a flexible manufacturing system. Integrated Manufacturing Systems 6:5, pages 21-26.
Crossref
Peter C. Bell & Robert M. O'Keefe. (1994) Visual interactive simulation: A methodological perspective. Annals of Operations Research 53:1, pages 321-342.
Crossref
Ruth M. Davies, Robert M. O'Keefe & Huw T. O. Davies. (1993) Simplifying the modeling of multiple activities, multiple queuing, and interruptions. ACM Transactions on Modeling and Computer Simulation 3:4, pages 332-346.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.