67
Views
34
CrossRef citations to date
0
Altmetric
Original Articles

A multiple criteria decision making approach for the assembly line balancing problem

Pages 1979-2001 | Received 01 Jul 1990, Published online: 16 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Audrey Cerqueus & Xavier Delorme. (2019) A branch-and-bound method for the bi-objective simple line assembly balancing problem. International Journal of Production Research 57:18, pages 5640-5659.
Read now
Rifat Gürcan Özdemir & Zeki Ayağ. (2011) An integrated approach to evaluating assembly-line design alternatives with equipment selection. Production Planning & Control 22:2, pages 194-206.
Read now
Yakup Kara, Hadi Gökçen & Yakup Atasagun. (2010) Balancing parallel assembly lines with precise and fuzzy goals. International Journal of Production Research 48:6, pages 1685-1703.
Read now
Bilal Toklu & Uğur özcan. (2008) A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives. Engineering Optimization 40:3, pages 191-204.
Read now
B. MALAKOOTI & A. KUMAR. (1996) A knowledge-based system for solving multi-objective assembly line balancing problems. International Journal of Production Research 34:9, pages 2533-2552.
Read now
B. B. MALAKOOTI. (1994) Assembly line balancing with buffers by multiple criteria optimization. International Journal of Production Research 32:9, pages 2159-2178.
Read now
C. F. DAGANZO & D. E. BLUMENFELD. (1994) Assembly system design principles and tradeoffs. International Journal of Production Research 32:3, pages 669-681.
Read now

Articles from other publishers (27)

Kai Meng, Qiuhua Tang & Zikai Zhang. (2022) Robust assembly line balancing problem considering preventive maintenance scenarios with interval processing time. Engineering Applications of Artificial Intelligence 116, pages 105417.
Crossref
Kai Meng, Qiuhua Tang, Lixin Cheng & Zikai Zhang. (2022) Mixed-model assembly line balancing problem considering preventive maintenance scenarios: MILP model and cooperative co-evolutionary algorithm. Applied Soft Computing 127, pages 109341.
Crossref
Öncü Hazır, Xavier Delorme & Alexandre Dolgui. (2015) A review of cost and profit oriented line design and balancing problems and solution approaches. Annual Reviews in Control 40, pages 14-24.
Crossref
Öncü Hazır, Xavier Delorme & Alexandre Dolgui. (2014) A Survey on Cost and Profit Oriented Assembly Line Balancing. IFAC Proceedings Volumes 47:3, pages 6159-6167.
Crossref
X. Delorme, O. Battaïa & A. Dolgui. 2014. Applications of Multi-Criteria and Game Theory Approaches. Applications of Multi-Criteria and Game Theory Approaches 31 56 .
Low Shye-Nee, Shahrul Kamaruddin & Ishak Abd Azid. (2013) Computer Simulation with TOPSIS Approach for Improvement Solutions Ranking: A Case Study. International Journal of Computer Theory and Engineering, pages 673-677.
Crossref
Mir-Bahador Aryanezhad, Nima Fakhim Hashemi, Ahmad Makui & Hasan Javanshir. (2012) A simple approach to the two-dimensional guillotine cutting stock problem. Journal of Industrial Engineering International 8:1.
Crossref
Cheng Zhuo, Yingqiu Xu & Yingzi Tan. (2011) A research of the stochastic U-type assembly line balancing problem. A research of the stochastic U-type assembly line balancing problem.
M. Bagher, M. Zandieh & H. Farsijani. (2010) Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm. The International Journal of Advanced Manufacturing Technology 54:1-4, pages 271-285.
Crossref
Yakup Kara, Cemal Özgüven, Neşe Yalçın Seçme & Ching-Ter Chang. (2010) Multi-objective approaches to balance mixed-model assembly lines for model mixes having precedence conflicts and duplicable common tasks. The International Journal of Advanced Manufacturing Technology 52:5-8, pages 725-737.
Crossref
Alysson M. Costa & Cristóbal Miralles. (2009) Job rotation in assembly lines employing disabled workers. International Journal of Production Economics 120:2, pages 625-632.
Crossref
Uğur Özcan & Bilal Toklu. (2009) Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models. Computers & Operations Research 36:6, pages 1955-1965.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2008) Assembly line balancing: Which model to use when?. International Journal of Production Economics 111:2, pages 509-528.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) A classification of assembly line balancing problems. European Journal of Operational Research 183:2, pages 674-693.
Crossref
Hadi Gökçen & Kürşad Agˇpak. (2006) A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171:2, pages 577-585.
Crossref
Christian Becker & Armin Scholl. (2006) A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168:3, pages 694-715.
Crossref
Dylan F. Jones & Mehrdad Tamiz. 2002. Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys. Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys 129 170 .
Chian-Son Yu & Han-Lin Li. (2001) An algorithm for generalized fuzzy binary linear programming problems. European Journal of Operational Research 133:3, pages 496-511.
Crossref
Flávio César F. Fernandes & Andréia Gisele Dalalio. (2000) Balanceamento e rebalanceamento de linhas de montagem operadas por grupos de trabalho autogerenciados. Gestão & Produção 7:3, pages 378-398.
Crossref
Ashok Kumar, Sheldon H. Jacobson & Edward C. Sewell. (2000) Computational analysis of a flexible assembly system design problem. European Journal of Operational Research 123:3, pages 453-472.
Crossref
A. J. R. Smith & A. Bhandari. 2000. Proceedings of the 33rd International MATADOR Conference. Proceedings of the 33rd International MATADOR Conference 61 66 .
Hadi Gokcen & Erdal Erel. (1997) A goal programming approach to mixed-model assembly line balancing problem. International Journal of Production Economics 48:2, pages 177-185.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1997. Produktionsplanung. Produktionsplanung 181 278 .
Yeo Keun Kim, Yong Ju Kim & Yeongho Kim. (1996) Genetic algorithms for assembly line balancing with various objectives. Computers & Industrial Engineering 30:3, pages 397-409.
Crossref
Pitu B. Mirchandani & Malgorzata M. Wiecek. (1993) Routing with nonlinear multiattribute cost functions. Applied Mathematics and Computation 54:2-3, pages 215-239.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1993. Produktionsplanung. Produktionsplanung 171 248 .
X. Ma & H. W. Liu. 1993. Proceedings of the Thirtieth International MATADOR Conference. Proceedings of the Thirtieth International MATADOR Conference 57 64 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.