15
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives

&
Pages 129-140 | Received 01 Apr 1991, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Amr Abu-Suleiman , David B. Pratt & Bonnie Boardman. (2005) The modified critical ratio: towards sequencing with a continuous decision domain. International Journal of Production Research 43:15, pages 3287-3296.
Read now
K. K. YANG & C. C. SUM. (1994) A comparison of job shop dispatching rules using a total cost criterion. International Journal of Production Research 32:4, pages 807-820.
Read now
G. D. SCUDDER, T. R. HOFFMANN & T. R. ROHLEDER. (1993) Scheduling with forbidden early shipments: alternative performance criteria and conditions. International Journal of Production Research 31:10, pages 2287-2305.
Read now

Articles from other publishers (9)

S. Thiagarajan & Chandrasekharan Rajendran. (2005) Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers & Industrial Engineering 49:4, pages 463-503.
Crossref
F T S Chan. (2016) Evaluation of combined dispatching and routeing strategies for a flexible manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 216:7, pages 1033-1046.
Crossref
Bor-Yuh Leu. (2016) Simulation Analysis of Scheduling Heuristics in a Flow-Line Manufacturing Cell with Two Types of Order Shipment Environments. SIMULATION 66:2, pages 106-116.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (1995) Information inaccuracy: Implications for economic production scheduling. International Journal of Production Economics 42:1, pages 51-66.
Crossref
Bor‐Yuh Leu & John W. Nazemetz. (1995) Comparative analysis of group scheduling heuristics in a flow shop cellular system. International Journal of Operations & Production Management 15:9, pages 143-157.
Crossref
S.T. (Van) Enns. (1995) An economic approach to job shop performance analysis. International Journal of Production Economics 38:2-3, pages 117-131.
Crossref
THOMAS R. ROHLEDER & GARY SCUDDER. (2009) A COMPARISON OF ORDER‐RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM. Production and Operations Management 2:3, pages 221-238.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (2007) An Experimental Comparison of Time‐Based and Economic‐Based Scheduling Methods to Maximize Net Present Value*. Decision Sciences 24:5, pages 1037-1056.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (1993) Comparing performance measures in dynamic job shops: economics vs. time. International Journal of Production Economics 32:2, pages 169-183.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.