154
Views
76
CrossRef citations to date
0
Altmetric
Original Articles

Order acceptance strategies in a production-to-order environment with setup times and due-dates

, &
Pages 1313-1326 | Received 01 Sep 1991, Published online: 08 Jul 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (17)

Philipp Melchiors, Roel Leus, Stefan Creemers & Rainer Kolisch. (2018) Dynamic order acceptance and capacity planning in a stochastic multi-project environment with a bottleneck resource. International Journal of Production Research 56:1-2, pages 459-475.
Read now
Lei Xu, Qian Wang & Simin Huang. (2015) Dynamic order acceptance and scheduling problem with sequence-dependent setup time. International Journal of Production Research 53:19, pages 5797-5808.
Read now
R. Germs & N.D. van Foreest. (2013) Order acceptance and scheduling policies for a make-to-order environment with family-dependent lead and batch setup times. International Journal of Production Research 51:3, pages 940-951.
Read now
Simin Huang, Mengshi Lu & Guohua Wan. (2011) Integrated order selection and production scheduling under MTO strategy. International Journal of Production Research 49:13, pages 4085-4101.
Read now
Adil Baykasoğlu & Mustafa Göçken. (2011) A simulation based approach to analyse the effects of job release on the performance of a multi-stage job-shop with processing flexibility. International Journal of Production Research 49:2, pages 585-610.
Read now
Nicky D. van Foreest, Jacob Wijngaard & Taco van der Vaart. (2010) Scheduling and order acceptance for the customised stochastic lot scheduling problem. International Journal of Production Research 48:12, pages 3561-3578.
Read now
Jose M. Framinan & Rainer Leisten. (2010) Available-to-promise (ATP) systems: a classification and framework for analysis. International Journal of Production Research 48:11, pages 3079-3103.
Read now
Tadeusz Sawik. (2009) Multi-objective due-date setting in a make-to-order environment. International Journal of Production Research 47:22, pages 6205-6231.
Read now
M.R.A. Moreira & R.A.F.S. Alves. (2009) A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem. International Journal of Production Research 47:10, pages 2805-2821.
Read now
Mehmet Oguz Atan & M. Selim Akturk. (2008) Single CNC machine scheduling with controllable processing times and multiple due dates. International Journal of Production Research 46:21, pages 6087-6111.
Read now
P. Rogers & A. Nandi. (2007) Judicious order acceptance and order release in make-to-order manufacturing systems. Production Planning & Control 18:7, pages 610-625.
Read now
B.-H. Zhou, L. Feng Xi & L.-Y. Tao. (2007) A framework of order evaluation and negotiation for SMMEs in networked manufacturing environments. International Journal of Computer Integrated Manufacturing 20:2-3, pages 199-210.
Read now
M. Yoshimura, Y. Fujimi, K. Izui & S. Nishiwaki. (2006) Decision-making support system for human resource allocation in product development projects. International Journal of Production Research 44:5, pages 831-848.
Read now
Robin Roundy, Dietrich Chen, Pan Chen, Metin Çakanyildirim, MichaelB. Freimer & Vardges Melkonian. (2005) Capacity-driven acceptance of customer orders for a multi-stage batch manufacturing system: models and algorithms. IIE Transactions 37:12, pages 1093-1105.
Read now
KASARIN CHARNSIRISAKSKUL, PAULM. GRIFFIN & PINAR KESKINOCAK. (2004) Order selection and scheduling with leadtime flexibility. IIE Transactions 36:7, pages 697-707.
Read now
WENNYH.M. RAAYMAKERS, J. WILLM. BERTRAND & JANC. FRANSOO. (2000) Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing. IIE Transactions 32:10, pages 989-998.
Read now

Articles from other publishers (59)

Jian Chen, Wenjing Ma, Xudong Ye & Zhiheng Zhao. (2023) Logic-based Benders decomposition for order acceptance and scheduling in distributed manufacturing. Advanced Engineering Informatics 58, pages 102228.
Crossref
Foad Ghadimi, Tarik Aouam, Stefan Haeussler & Reha Uzsoy. (2022) Integrated and hierarchical systems for coordinating order acceptance and release planning. European Journal of Operational Research 303:3, pages 1277-1289.
Crossref
İstenç Tarhan & Ceyda Oğuz. (2022) A matheuristic for the generalized order acceptance and scheduling problem. European Journal of Operational Research 299:1, pages 87-103.
Crossref
İstenç Tarhan & Ceyda Oğuz. (2021) Generalized order acceptance and scheduling problem with batch delivery: Models and metaheuristics. Computers & Operations Research 134, pages 105414.
Crossref
Emre Aslan. 2021. Interdisciplinary Perspectives on Operations Management and Service Evaluation. Interdisciplinary Perspectives on Operations Management and Service Evaluation 57 75 .
Helia Yousefnejad & Maryam Esmaeili. (2018) Tactical production planning in a hybrid MTS/MTO system using Stackelberg game. Operational Research 20:3, pages 1791-1809.
Crossref
Wen Jiang, Lanjun Wu & Yunzhong Cao. (2020) Multiple Precast Component Orders Acceptance and Scheduling. Mathematical Problems in Engineering 2020, pages 1-15.
Crossref
Jun Ma, Yiliu Tu & Ding Feng. 2020. Data Management and Analysis. Data Management and Analysis 67 89 .
Humyun Fuad Rahman, Mukund Nilakantan Janardhanan & Izabela Ewa Nielsen. (2019) Real-Time Order Acceptance and Scheduling Problems in a Flow Shop Environment Using Hybrid GA-PSO Algorithm. IEEE Access 7, pages 112742-112755.
Crossref
Humyun Fuad Rahman, Ruhul Sarker & Daryl Essam. (2018) Multiple-order permutation flow shop scheduling under process interruptions. The International Journal of Advanced Manufacturing Technology 97:5-8, pages 2781-2808.
Crossref
Yuri Laio T.V. Silva, Anand Subramanian & Artur Alves Pessoa. (2018) Exact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup times. Computers & Operations Research 90, pages 142-160.
Crossref
Yusuf Tansel İç, Melis Özel & İmdat Kara. (2017) An Integrated Fuzzy TOPSIS-Knapsack Problem Model for Order Selection in a Bakery. Arabian Journal for Science and Engineering 42:12, pages 5321-5337.
Crossref
Jun Wang, Xiaoxia Zhuang & Baiyi Wu. 2017. Optimization and Control for Systems in the Big-Data Era. Optimization and Control for Systems in the Big-Data Era 245 251 .
Su Nguyen. (2016) A learning and optimizing system for order acceptance and scheduling. The International Journal of Advanced Manufacturing Technology 86:5-8, pages 2021-2036.
Crossref
Sujan Piya, Mohammad Miftaur Rahman Khan Khadem & Ahm Shamsuzzoha. (2016) Negotiation based decision support system for order acceptance. Journal of Manufacturing Technology Management 27:3, pages 443-468.
Crossref
Humyun Fuad Rahman, Ruhul Sarker & Daryl Essam. (2015) A real-time order acceptance and scheduling approach for permutation flow shop problems. European Journal of Operational Research 247:2, pages 488-503.
Crossref
Abbas Namdar Aliabadi & Hamid Berenji. (2015) Combined model of customer assessment for order acceptance problem under fuzzy goals and fuzzy constraints. Combined model of customer assessment for order acceptance problem under fuzzy goals and fuzzy constraints.
Su Nguyen, Mengjie Zhang & Kay Chen Tan. (2015) A Dispatching rule based Genetic Algorithm for Order Acceptance and Scheduling. A Dispatching rule based Genetic Algorithm for Order Acceptance and Scheduling.
Philipp MelchiorsPhilipp Melchiors. 2015. Dynamic and Stochastic Multi-Project Planning. Dynamic and Stochastic Multi-Project Planning 19 28 .
Jingxing Wei & Y.-S. Ma. (2014) Design of a feature-based order acceptance and scheduling module in an ERP system. Computers in Industry 65:1, pages 64-78.
Crossref
Humyun Rahman, Ruhul Sarker & Daryl Essam. (2013) Permutation Flow Shop Scheduling with dynamic job order arrival. Permutation Flow Shop Scheduling with dynamic job order arrival.
John Park, Su Nguyen, Mengjie Zhang & Mark Johnston. (2013) Genetic programming for order acceptance and scheduling. Genetic programming for order acceptance and scheduling.
Yi-Feng Hung, Chuan-Che Huang & Ying Yeh. (2013) Real-time capacity requirement planning for make-to-order manufacturing with variable time-window orders. Computers & Industrial Engineering 64:2, pages 641-652.
Crossref
Su Nguyen, Mengjie Zhang, Mark Johnston & Kay Chen Tan. 2013. Genetic Programming. Genetic Programming 157 168 .
Lei Wang, Dechen Zhan, Lanshun Nie, Dianhui Chu & Xiaofei Xu. (2012) Distributed decision making for dynamic order acceptance and scheduling problem under OKP strategy. Distributed decision making for dynamic order acceptance and scheduling problem under OKP strategy.
Jingxing Wei & Y.-S. Ma. (2012) Design of an order acceptance and scheduling module in a unified framework with product and process features. Design of an order acceptance and scheduling module in a unified framework with product and process features.
Bahriye Cesaret, Ceyda Oğuz & F. Sibel Salman. (2012) A tabu search algorithm for order acceptance and scheduling. Computers & Operations Research 39:6, pages 1197-1205.
Crossref
Susan A. Slotnick. (2011) Order acceptance and scheduling: A taxonomy and review. European Journal of Operational Research 212:1, pages 1-11.
Crossref
Tadeusz Sawik. 2011. Scheduling in Supply Chains Using Mixed Integer Programming. Scheduling in Supply Chains Using Mixed Integer Programming 437 447 .
Thomas Volling & Thomas S. Spengler. (2011) Modeling and simulation of order-driven planning policies in build-to-order automobile production. International Journal of Production Economics 131:1, pages 183-193.
Crossref
Mahdokht Kalantari, Masoud Rabbani & Mahmood Ebadian. (2011) A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems. Applied Mathematical Modelling 35:3, pages 1363-1377.
Crossref
Mokmin Park, Dongmyung Lee, Kitae Shin & Jinwoo Park. (2010) Business integration model with due‐date re‐negotiations. Industrial Management & Data Systems 110:3, pages 415-432.
Crossref
Facundo Arredondo & Ernesto Martinez. (2010) Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing. Computers & Industrial Engineering 58:1, pages 70-83.
Crossref
Mokmin Park, Kitae Shin, Hanil Jeong & Jinwoo Park. 2010. Advances in Production Management Systems. New Challenges, New Approaches. Advances in Production Management Systems. New Challenges, New Approaches 449 456 .
Walter O. Rom & Susan A. Slotnick. (2009) Order acceptance using genetic algorithms. Computers & Operations Research 36:6, pages 1758-1767.
Crossref
I. Chamodrakas, N. Alexopoulou & D. Martakos. (2009) Customer evaluation for order acceptance using a novel class of fuzzy methods based on TOPSIS. Expert Systems with Applications 36:4, pages 7409-7415.
Crossref
M. Zorzini, D. Corti & A. Pozzetti. (2008) Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics 112:2, pages 919-933.
Crossref
Jade Herbots, Willy Herroelen & Roel Leus. (2007) Dynamic order acceptance and capacity planning on a single bottleneck resource. Naval Research Logistics (NRL) 54:8, pages 874-889.
Crossref
Susan A. Slotnick & Thomas E. Morton. (2007) Order acceptance with weighted tardiness. Computers & Operations Research 34:10, pages 3029-3042.
Crossref
Taco van der Vaart & Jacob Wijngaard. (2007) The contribution of focus in collaborative planning for make-to-order production situation with large set-up times. International Journal of Production Economics 108:1-2, pages 436-443.
Crossref
M. Mainegra Hing, A. van Harten & P. C. Schuur. (2006) Reinforcement learning versus heuristics for order acceptance on a single resource. Journal of Heuristics 13:2, pages 167-187.
Crossref
Marlene Klompenhouwer, Zofia Lukszo & Frank Janssen. 2007. 17th European Symposium on Computer Aided Process Engineering. 17th European Symposium on Computer Aided Process Engineering 655 660 .
Amitava Nandi & Paul Rogers. (2006) Optimal Control of Make-To-Order Manufacturing Systems via Selected Order Acceptance. Optimal Control of Make-To-Order Manufacturing Systems via Selected Order Acceptance.
Alessandra Orsoni. (2006) Adaptive Genetic Hybrids for Order Review and Release into Production. Adaptive Genetic Hybrids for Order Review and Release into Production.
Kasarin Charnsirisakskul, Paul M. Griffin & Pınar Keskinocak. (2006) Pricing and scheduling decisions with leadtime flexibility. European Journal of Operational Research 171:1, pages 153-169.
Crossref
V. Cristina Ivănescu, Jan C. Fransoo & J. Will M. Bertrand. (2006) A hybrid policy for order acceptance in batch process industries. OR Spectrum 28:2, pages 199-222.
Crossref
Gang Huang, Xinyu Shao & Peigen Li. (2006) Due Date Achievable Verification in Job Shop with Alternative Processes by Timed Automata. Due Date Achievable Verification in Job Shop with Alternative Processes by Timed Automata.
Seung J. Noh, Suk-Chul Rim & Heesang Lee. 2005. Systems Modeling and Simulation: Theory and Applications. Systems Modeling and Simulation: Theory and Applications 568 577 .
Amitava NandiPaul Rogers. (2016) Using Simulation to Make Order Acceptance/Rejection Decisions. SIMULATION 80:3, pages 131-142.
Crossref
Amitava Nandi & P. Rogers. (2003) Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance. Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance.
Cristina V. Ivanescu, Jan C. Fransoo & J. Will M. Bertrand. 2003. Advanced Planning and Scheduling Solutions in Process Industry. Advanced Planning and Scheduling Solutions in Process Industry 125 153 .
Herbert F. Lewis & Susan A. Slotnick. (2002) Multi-period job selection: planning work loads to maximize profit. Computers & Operations Research 29:8, pages 1081-1098.
Crossref
Bülent SEZEN. (2002) KAVRAMSAL BİR SİPARİŞ KABUL/RED KARAR MODELİ. Öneri Dergisi 5:17, pages 145-156.
Crossref
Michael G Hegedus & Wallace J Hopp. (2001) Due date setting with supply constraints in systems using MRP. Computers & Industrial Engineering 39:3-4, pages 293-305.
Crossref
Jay B. Ghosh. (1997) Job selection in a heavily loaded shop. Computers & Operations Research 24:2, pages 141-145.
Crossref
Susan A. Slotnick & Thomas E. Morton. (1996) Selecting jobs for a heavily loaded shop with lateness penalties. Computers & Operations Research 23:2, pages 131-140.
Crossref
M.S. Lee, H.M. Rho & M.J. Kang. (1995) An Evaluation System of Order Acceptability under Consideration of Machine Loading in Die Manufacturing. CIRP Annals 44:1, pages 413-416.
Crossref
Hans A. ten Kate. (1994) Towards a better understanding of order acceptance. International Journal of Production Economics 37:1, pages 139-152.
Crossref
Jade Herbots, Willy Herroelen & Roel Leus. (2006) Dynamic Order Acceptance and Capacity Planning within a Multi-Project Environment. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.