174
Views
70
CrossRef citations to date
0
Altmetric
Original Articles

A new classification scheme for flexible manufacturing systems

&
Pages 299-309 | Received 01 Apr 1992, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

Jeong-Hoon Shin, Jae-Min Yu, Hyoung-Ho Doh, Hyung-Won Kim & Dong-Ho Lee. (2020) Batching and scheduling for a single-machine flexible machining cell with multi-fixturing pallets and controllable processing times. International Journal of Production Research 58:3, pages 863-877.
Read now
Dorothea Calmels. (2019) The job sequencing and tool switching problem: state-of-the-art literature review, classification, and trends. International Journal of Production Research 57:15-16, pages 5005-5025.
Read now
Yi-Dong Zhou, Jeong-Hoon Shin & Dong-Ho Lee. (2019) Loading and scheduling for flexible manufacturing systems with controllable processing times. Engineering Optimization 51:3, pages 412-426.
Read now
Ebru Yılmaz & Rızvan Erol. (2015) A mathematical programming model for reconfiguration of flexible manufacturing cells. Engineering Optimization 47:2, pages 184-203.
Read now
Mehdi Foumani & Kouroush Jenab. (2013) Analysis of flexible robotic cells with improved pure cycle. International Journal of Computer Integrated Manufacturing 26:3, pages 201-215.
Read now
O.A. Joseph & R. Sridharan. (2012) Effects of flexibility and scheduling decisions on the performance of an FMS: simulation modelling and analysis. International Journal of Production Research 50:7, pages 2058-2078.
Read now
J. Cegarra. (2008) A cognitive typology of scheduling situations: a contribution to laboratory and field studies. Theoretical Issues in Ergonomics Science 9:3, pages 201-222.
Read now
H. J. WEN, C. H. SMITH & E. D. MINOR. (1996) Formation and dynamic routeing of part families among flexible manufacturing cells. International Journal of Production Research 34:8, pages 2229-2245.
Read now
J. LIU & B. L. MacCARTHY. (1996) The classification of FMS scheduling problems. International Journal of Production Research 34:3, pages 647-656.
Read now
D. J. TINCKNELL & D. F. RADCLIFFE. (1996) A generic model of manufacturing flexibility based on system control hierarchies. International Journal of Production Research 34:1, pages 19-32.
Read now
C. L. ANG. (1995) On the performance of hybrid multi-cell flexible manufacturing systems. International Journal of Production Research 33:10, pages 2779-2799.
Read now
YoungS. Pyoun, B youngK. Choi & JuC. Park. (1995) Flexibility Value as a Tool for Improving Decision-Making in Flexible Automation. The Engineering Economist 40:3, pages 267-286.
Read now

Articles from other publishers (57)

Xiaogang Zhang, Yulong Li, Zhongyuan Zhao, Jin Zhang & Wan Zhang. (2023) Reliability assessment of multistate flexible manufacturing cells considering equipment failures. Computers & Industrial Engineering 185, pages 109625.
Crossref
Silviu-Mihai Petrişor, Natalia-Alina Duminică & Ionuț-Cristian Țopa. (2023) Organisation and Principle Design of a Flexible Manufacturing Cell Dedicated to the Annual Overhaul Activities for TAB-77. Land Forces Academy Review 28:3, pages 233-244.
Crossref
Emine Bozoklar & Ebru Yılmaz. (2023) A Mathematical Programming Approach for Multi-Objective Optimization in Designing Flexible Manufacturing Cells. Applied Sciences 13:13, pages 7420.
Crossref
Cenk ŞAHİN & Rızvan EROL. (2023) Esnek Üretim Sistemlerinin Dinamik Çizelgelenmesi için Çoklu Etmen Yaklaşımı ve Yönlendirme Kurallarının KarşılaştırılmasıComparison of Multi-Agent Approach and Dispatching Rules for Dynamic Scheduling of Flexible Manufacturing Systems. Çukurova Üniversitesi Mühendislik Fakültesi Dergisi 38:1, pages 61-72.
Crossref
Xiaogang Zhang, Weixi Wang & Wan Zhang. (2022) Mission reliability analysis of flexible manufacturing cells considering component reliability, task demand, and product quality. The International Journal of Advanced Manufacturing Technology 124:11-12, pages 4403-4414.
Crossref
Noble Anumbe, Clint Saidy & Ramy Harik. (2022) A Primer on the Factories of the Future. Sensors 22:15, pages 5834.
Crossref
S. Gopi & S. Amith Chandra. (2021) Solving distributed FMS scheduling problems with/ without breakdowns: Simulation optimization approach. Materials Today: Proceedings 47, pages 4879-4884.
Crossref
A. Hadri, F. Belkaid & A. Bougloula. (2020) Minimizing energy consumption in a Job Shop problem with unidirectional transport constraint. Minimizing energy consumption in a Job Shop problem with unidirectional transport constraint.
Dong-Kyu Lee, Jeong-Hoon Shin & Dong-Ho Lee. (2020) Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets. Computers & Industrial Engineering 144, pages 106496.
Crossref
Xiaogang Zhang, Yulong Li, Yan Ran & Genbao Zhang. (2020) Stochastic models for performance analysis of multistate flexible manufacturing cells. Journal of Manufacturing Systems 55, pages 94-108.
Crossref
Xiaogang Zhang, Yulong Li, Yan Ran & Genbao Zhang. (2019) A Hybrid Multilevel FTA-FMEA Method for a Flexible Manufacturing Cell Based on Meta-Action and TOPSIS. IEEE Access 7, pages 110306-110315.
Crossref
Isabela Maganha, Cristovao Silva & Luis Miguel D.F. Ferreira. (2018) Understanding reconfigurability of manufacturing systems: An empirical analysis. Journal of Manufacturing Systems 48, pages 120-130.
Crossref
Corrado lo Storto. (2018) A double-DEA framework to support decision-making in the choice of advanced manufacturing technologies. Management Decision 56:2, pages 488-507.
Crossref
M. Reza Abdi, Ashraf W. Labib, Farideh Delavari Edalat & Alireza AbdiM. Reza Abdi, Ashraf W. Labib, Farideh Delavari Edalat & Alireza Abdi. 2018. Integrated Reconfigurable Manufacturing Systems and Smart Value Chain. Integrated Reconfigurable Manufacturing Systems and Smart Value Chain 17 42 .
Bhupesh K. Lad, Divya Shrivastava & Makarand S. Kulkarni. 2016. Machine Tool Reliability. Machine Tool Reliability 277 295 .
Achmad P. Rifai, Siti Zawiah Md Dawal, Aliq Zuhdi, Hideki Aoyama & K. Case. (2015) Reentrant FMS scheduling in loop layout with consideration of multi loading-unloading stations and shortcuts. The International Journal of Advanced Manufacturing Technology 82:9-12, pages 1527-1545.
Crossref
Khalid Karam AbdKhalid Karam Abd. 2016. Intelligent Scheduling of Robotic Flexible Assembly Cells. Intelligent Scheduling of Robotic Flexible Assembly Cells 1 12 .
Hadi Mokhtari. (2014) Designing an efficient bi-criteria iterated greedy heuristic for simultaneous order scheduling and resource allocation: a balance between cost and lateness measures. Neural Computing and Applications 26:5, pages 1085-1101.
Crossref
Moacir Godinho Filho, Clarissa Fullin Barco & Roberto Fernandes Tavares Neto. (2012) Using Genetic Algorithms to solve scheduling problems on flexible manufacturing systems (FMS): a literature survey, classification and analysis. Flexible Services and Manufacturing Journal 26:3, pages 408-431.
Crossref
T.R. Chinnusamy, T. Karthikeyan, M. Krishnan & A. Murugesan. (2014) A Comprehensive Survey of Flexible Manufacturing System Scheduling Using Petri Nets. Advanced Materials Research 984-985, pages 111-117.
Crossref
Amir Sadrzadeh. (2014) Knowledge-Based Genetic Algorithm for Dynamic Machine–Tool Selection and Operation Allocation. Arabian Journal for Science and Engineering 39:5, pages 4315-4323.
Crossref
A.N. Balaji & S. Porselvi. (2014) Artificial Immune System Algorithm and Simulated Annealing Algorithm for Scheduling Batches of Parts based on Job Availability Model in a Multi-cell Flexible Manufacturing System. Procedia Engineering 97, pages 1524-1533.
Crossref
Hyung-Won Kim, Jae-Min Yu, Ji-Su Kim, Hyoung-Ho Doh, Dong-Ho Lee & Sung-Ho Nam. (2011) Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints. The International Journal of Advanced Manufacturing Technology 58:5-8, pages 683-691.
Crossref
I. A. Chaudhry, S. Mahmood & M. Shami. (2011) Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms. Journal of Central South University 18:5, pages 1473-1486.
Crossref
O. A. Joseph & R. Sridharan. (2011) Effects of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of a flexible manufacturing system. The International Journal of Advanced Manufacturing Technology 56:1-4, pages 291-306.
Crossref
O. A. Joseph & R. Sridharan. (2011) Evaluation of routing flexibility of a flexible manufacturing system using simulation modelling and analysis. The International Journal of Advanced Manufacturing Technology 56:1-4, pages 273-289.
Crossref
O.A. Joseph & R. Sridharan. (2011) Analysis of dynamic due-date assignment models in a flexible manufacturing system. Journal of Manufacturing Systems 30:1, pages 28-40.
Crossref
Rambabu Kodali & G. Anand. (2017) Application of Analytic Network Process for the Design of Flexible Manufacturing Systems. Global Journal of Flexible Systems Management 11:1-2, pages 39-54.
Crossref
M. T. Taghavi, M. Heydar & S. S. Mousavi. (2008) A Genetic Algorithm for Scheduling Flexible Manufacturing Cells. Journal of Applied Sciences 9:1, pages 97-104.
Crossref
Guillaume Pinot, Olivier Cardin & Nasser Mebarki. (2007) A study on the group sequencing method in regards with transportation in an industrial FMS. A study on the group sequencing method in regards with transportation in an industrial FMS.
Suresh Kumar N & R. Sridharan. (2007) Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems. Robotics and Computer-Integrated Manufacturing 23:4, pages 361-370.
Crossref
Yenming J. Chen & Tien-Sung Chio. (2006) Multi-Agent Online Work Dispatching Control for a Multi-Facility Manufacturing System. Multi-Agent Online Work Dispatching Control for a Multi-Facility Manufacturing System.
MYRIAM NOUREDDINE. (2011) CONCEPTUAL MODEL OF THE PHYSICAL STRUCTURE OF MANUFACTURING SYSTEMS. International Journal of Software Engineering and Knowledge Engineering 16:04, pages 643-651.
Crossref
Tomer Kahan, Yossi Bukchin, Roland Menassa & Irad Ben-Gal. (2006) WELD REALLOCATION IN AN AUTOMOTIVE ROBOTIC LINE DUE TO ROBOTS’ FAILURES. IFAC Proceedings Volumes 39:3, pages 407-412.
Crossref
Ozden Bayazit. (2005) Use of AHP in decision‐making for flexible manufacturing systems. Journal of Manufacturing Technology Management 16:7, pages 808-819.
Crossref
Sidhartha R. Das & Cem Canel. (2005) An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system. International Journal of Production Economics 97:3, pages 247-262.
Crossref
Ibrahim Al Kattan. (2005) Workload balance of cells in designing of multiple cellular manufacturing systems. Journal of Manufacturing Technology Management 16:2, pages 178-196.
Crossref
A. Soukhal & P. Martineau. (2005) Resolution of a scheduling problem in a flowshop robotic cell. European Journal of Operational Research 161:1, pages 62-72.
Crossref
A. Soukhal, A. Oulamara & P. Martineau. (2005) Complexity of flow shop scheduling problems with transportation constraints. European Journal of Operational Research 161:1, pages 32-41.
Crossref
Claudine Tacquard & Patrick Martineau. (2001) Automatic notation of the physical structure of a flexible manufacturing system. International Journal of Production Economics 74:1-3, pages 279-292.
Crossref
B.L. MacCarthy, J.R. Wilson & S. Crawford. (2001) Human performance in industrial scheduling: A framework for understanding. Human Factors and Ergonomics in Manufacturing & Service Industries 11:4, pages 299-320.
Crossref
A. Oulamara & A. Soukhal. (2001) Flow shop scheduling problems with transportation and capacities constraints. Flow shop scheduling problems with transportation and capacities constraints.
Gideon Halevi. 2001. Handbook of Production Management Methods. Handbook of Production Management Methods 59 310 .
Abderrahmane Fadil & Zdenek Binder. (2000) Organization and Optimization of Machine Layout Manufacturing Systems. IFAC Proceedings Volumes 33:17, pages 861-866.
Crossref
C Gertosio, N Mebarki & A Dussauchoy. (2000) Modeling and simulation of the control framework on a flexible manufacturing system. International Journal of Production Economics 64:1-3, pages 285-293.
Crossref
H. Joseph Wen. 2000. Encyclopedia of Production and Manufacturing Management. Encyclopedia of Production and Manufacturing Management 170 173 .
P. Lacomme, N. Tchernev & C. Chu. (1999) An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport. An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport.
David De Almeida. (2011) Agrégation des données pour l'évaluation des performances de systèmes flexibles de production par modèles à réseaux de files d'attente. RAIRO - Operations Research 32:2, pages 145-192.
Crossref
K.J. Nelson & R.U. Ekmark. (1997) Engineer co-operation in the specification of a flexible assembly system—a pilot study. Computers in Industry 33:2-3, pages 237-243.
Crossref
Jiyin Liu & B.L. MacCarthy. (1997) A global MILP model for FMS scheduling. European Journal of Operational Research 100:3, pages 441-453.
Crossref
A.M. Erkmen, M. Erbudak, O. Anlagan & O. Unver. (1997) Genetically tuned fuzzy scheduling for flexible manufacturing systems. Genetically tuned fuzzy scheduling for flexible manufacturing systems.
B. Srivastava & Wun-Hwa Chen. (1996) Heuristic solutions for loading in flexible manufacturing systems. IEEE Transactions on Robotics and Automation 12:6, pages 858-868.
Crossref
A. Ait-Hssain & B. Descotes-Genon. (1995) FMS Control System Design with a Dynamic Object-Oriented Model. IFAC Proceedings Volumes 28:24, pages 275-280.
Crossref
C. Saygin, S.E. Kiliç, T. Tóth & F. Erdélyi. (1995) On Scheduling Approaches of Flexible Manufacturing Systems: Gap Between Theory and Practice. IFAC Proceedings Volumes 28:24, pages 61-66.
Crossref
T.M.A. Ari Samadhi & K. Hoang. (1995) Shared computer‐integrated manufacturing for various types of production environment. International Journal of Operations & Production Management 15:5, pages 95-108.
Crossref
A. Benlogab & B. Descotes-Genon. (1994) Sequencing flow shops with arbitrary intermediate storage. Sequencing flow shops with arbitrary intermediate storage.
J.C. Marty & M. Sartor. (1994) A specification method combining statecharts, activity-charts, and SART concepts in FMS study. A specification method combining statecharts, activity-charts, and SART concepts in FMS study.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.