40
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Job shop flowtime prediction and tardiness control using queueing analysis

Pages 2045-2057 | Received 01 Sep 1992, Published online: 07 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Şerafettin Alpay & Nihat Yüzügüllü. (2009) Dynamic job shop scheduling for missed due date performance. International Journal of Production Research 47:15, pages 4047-4062.
Read now
Pei-Chann Chang, Yen-Wen Wang & Ching-Jung Ting. (2008) A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory. International Journal of Production Research 46:4, pages 1017-1029.
Read now
D. Y. Sha, R. L. Storch & C.-H. Liu. (2007) Development of a regression-based method with case-based tuning to solve the due date assignment problem. International Journal of Production Research 45:1, pages 65-82.
Read now
S. Y. Hsu & D. Y. Sha. (2004) Due date assignment using artificial neural networks under different shop floor control strategies. International Journal of Production Research 42:9, pages 1727-1745.
Read now
WENNYH.M. RAAYMAKERS, J. WILLM. BERTRAND & JANC. FRANSOO. (2000) Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing. IIE Transactions 32:10, pages 989-998.
Read now
Ching-En Lee & Chaw-Wen Chen. (1999) 在緊急訂單與延遲成本考量下零工型排程問題派工法之硏究. Journal of the Chinese Institute of Industrial Engineers 16:1, pages 129-146.
Read now
S. T. ENNS. (1995) An integrated system for controlling shop loading and work flow. International Journal of Production Research 33:10, pages 2801-2820.
Read now
S. T. ENNS. (1995) A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 33:5, pages 1295-1312.
Read now

Articles from other publishers (18)

R. Balasundaram, N. Baskar & R. Siva Sankar. 2013. Advances in Computing and Information Technology. Advances in Computing and Information Technology 63 72 .
Ing Jiunn Su, Chia Chih Tsai & Wen Tsai Sung. (2011) Comparison of BP and GRNN Algorithm for Factory Monitoring. Applied Mechanics and Materials 52-54, pages 2105-2110.
Crossref
Sheng-Yuan Hsu. (2010) A hybrid due-date fulfilled forecasting based on clustering and decision trees. A hybrid due-date fulfilled forecasting based on clustering and decision trees.
Adil Baykasoğlu & Mustafa Göçken. (2009) Gene expression programming based due date assignment in a simulated job shop. Expert Systems with Applications 36:10, pages 12143-12150.
Crossref
Jose M Framinan. (2009) Handling variability for robust order promising and fulfilment. Handling variability for robust order promising and fulfilment.
Tsai-Chi Kuo, Sheng-Hung Chang & Shang-Nan Huang. (2009) Due-date performance improvement using TOC’s aggregated time buffer method at a wafer fabrication factory. Expert Systems with Applications 36:2, pages 1783-1792.
Crossref
Adil Baykasoğlu, Mustafa Göçken & Zeynep D. Unutmaz. (2008) New approaches to due date assignment in job shops. European Journal of Operational Research 187:1, pages 31-45.
Crossref
Shujuan Li, Yan Li, Yong Liu & Yuefei Xu. (2007) A GA-based NN approach for makespan estimation. Applied Mathematics and Computation 185:2, pages 1003-1014.
Crossref
Pei-Chann Chang, Jih-Chang Hieh & T. Warren Liao. (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing 16:4-5, pages 549-557.
Crossref
Shu-Juan Li, Yan Li, Yong Liu, Zhi-Gang-Liu & Jun Tang. (2005) Hybrid method of BPN and genetic algorithm for completion time prediction. Hybrid method of BPN and genetic algorithm for completion time prediction.
W.H.M Raaymakers & A.J.M.M Weijters. (2003) Makespan estimation in batch process industries: A comparison between regression analysis and neural networks. European Journal of Operational Research 145:1, pages 14-30.
Crossref
I Sabuncuoglu & A Comlekci. (2002) Operation-based flowtime estimation in a dynamic job shop. Omega 30:6, pages 423-442.
Crossref
Wenny H.M. Raaymakers, J Will M. Bertrand & Jan C. Fransoo. (2001) Makespan estimation in batch process industries using aggregate resource and job set characteristics. International Journal of Production Economics 70:2, pages 145-161.
Crossref
Emre A. Veral & Ram P. Mohan. (1999) A two-phased approach to setting due-dates in single machine job shops. Computers & Industrial Engineering 36:1, pages 201-218.
Crossref
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
T.C.E. Cheng & J. Jiang. (1998) Job shop scheduling for missed due-date performance. Computers & Industrial Engineering 34:2, pages 297-307.
Crossref
Adeyemi Aderoba. (1997) A generalised cost-estimation model for job shops. International Journal of Production Economics 53:3, pages 257-263.
Crossref
Shu-Hsing Chung, Ming-Hsien Yang & Cho-Ming Cheng. (1997) The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Transactions on Components, Packaging, and Manufacturing Technology: Part C 20:4, pages 278-287.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.