189
Views
106
CrossRef citations to date
0
Altmetric
Original Articles

Heuristics for scheduling projects with resource restrictions and several resource-duration modes

Pages 2547-2558 | Received 01 Dec 1992, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Tom Servranckx, José Coelho & Mario Vanhoucke. (2022) Various extensions in resource-constrained project scheduling with alternative subgraphs. International Journal of Production Research 60:11, pages 3501-3520.
Read now
Karin Bogner, Ulrich Pferschy, Roland Unterberger & Herwig Zeiner. (2018) Optimised scheduling in human–robot collaboration – a use case in the assembly of printed circuit boards. International Journal of Production Research 56:16, pages 5522-5540.
Read now
Hong Zhang, Heng Li & C. M. Tam. (2006) Heuristic scheduling of resource‐constrained, multiple‐mode and repetitive projects. Construction Management and Economics 24:2, pages 159-169.
Read now
J Alcaraz, C Maroto & R Ruiz. (2003) Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms. Journal of the Operational Research Society 54:6, pages 614-626.
Read now
Yang-Chin Tsai, Po-Chuan Wu & Chiu-Chi Wei. (2001) RESOURCE-CONSTRAINED PROJECT MANAGEMENT USING MODIFIED THEORY OF CONSTRAINT. Journal of the Chinese Institute of Industrial Engineers 18:1, pages 87-95.
Read now
RAINER KOLISCH & ANDREAS DREXL. (1997) Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29:11, pages 987-999.
Read now
F. F. BOCTOR. (1996) Resource-constrained project scheduling by simulated annealing. International Journal of Production Research 34:8, pages 2335-2351.
Read now
Deng Maw Tsai & Huan Neng Chiu. (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics 14:4, pages 325-340.
Read now
LINET ÖZDAMAR & GÜNDÜZ ULUSOY. (1995) A survey on the resource-constrained project scheduling problem. IIE Transactions 27:5, pages 574-586.
Read now

Articles from other publishers (97)

Zsolt T. Kosztyán & Gergely L. Novák. (2024) Compound Matrix-Based Project Database (CMPD). Scientific Data 11:1.
Crossref
Zsolt Tibor Kosztyán & Aamir Saghir. (2024) {MFPP(R). An R package for matrix-based flexible project planning. F1000Research 13, pages 356.
Crossref
Zsolt T. Kosztyán & Gergely L. Novák. (2024) Project indicators and flexible project structure generators. Journal of Computational Science 75, pages 102203.
Crossref
Alireza Etminaniesfahani, Hanyu Gu, Leila Moslemi Naeni & Amir Salehipour. (2023) An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem. Annals of Operations Research.
Crossref
Zsolt T. Kosztyán, Gergely Novák, Róbert Jakab, István Szalkai & Csaba Hegedűs. (2023) A matrix-based flexible project-planning library and indicators. Expert Systems with Applications 216, pages 119472.
Crossref
Naihui He, David Z. Zhang & Baris Yuce. (2022) Integrated multi-project planning and scheduling - a multiagent approach. European Journal of Operational Research 302:2, pages 688-699.
Crossref
Gustavo Alves Fernandes & Sérgio Ricardo de Souza. (2021) A matheuristic approach to the multi-mode resource constrained project scheduling problem. Computers & Industrial Engineering 162, pages 107592.
Crossref
Luis F. Machado-Domínguez, Carlos D. Paternina-Arboleda, Jorge I. Vélez & Agustin Barrios-Sarmiento. (2021) A memetic algorithm to address the multi-node resource-constrained project scheduling problem. Journal of Scheduling 24:4, pages 413-429.
Crossref
Jie Song, Annelies Martens & Mario Vanhoucke. (2021) Using Schedule Risk Analysis with resource constraints for project control. European Journal of Operational Research 288:3, pages 736-752.
Crossref
Patrick Gerhards. (2020) The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds. OR Spectrum 42:4, pages 901-933.
Crossref
Diana M. Franco-Duran & Jesús M. de la Garza. (2020) Performance of Resource-Constrained Scheduling Heuristics. Journal of Construction Engineering and Management 146:4.
Crossref
Reza Zamani. (2019) An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains. RAIRO - Operations Research 53:4, pages 1309-1330.
Crossref
Kai Li, Jianfu Chen, Hong Fu, Zhaohong Jia & Weizhong Fu. (2019) Uniform parallel machine scheduling with fuzzy processing times under resource consumption constraint. Applied Soft Computing 82, pages 105585.
Crossref
Ripon K Chakrabortt, Alireza Abbasi & Michael J Ryan. (2019) A Modified Variable Neighbourhood Search Heuristic for the Multi‐Mode Resource Constrained Project Scheduling Problem with A Case Study. INCOSE International Symposium 29:1, pages 1124-1139.
Crossref
Tom Servranckx & Mario Vanhoucke. (2019) A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs. European Journal of Operational Research 273:3, pages 841-860.
Crossref
Jeroen Burgelman & Mario Vanhoucke. (2018) Maximising the weighted number of activity execution modes in project planning. European Journal of Operational Research 270:3, pages 999-1013.
Crossref
Liu Changchun, Xiang Xi, Zhang Canrong, Wang Qiang & Zheng Li. (2018) A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem. Computers & Industrial Engineering 125, pages 258-278.
Crossref
Albert Einstein Fernandes Muritiba, Carlos Diego Rodrigues & Francíio Araùjo da Costa. (2018) A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem. Computers & Operations Research 92, pages 145-154.
Crossref
Adrian Zimmermann & Norbert Trautmann. (2017) A list-scheduling heuristic for the short-term planning of assessment centers. Journal of Scheduling 21:2, pages 131-142.
Crossref
Ewa Ratajczak-Ropel & Aleksander SkakovskiEwa Ratajczak-Ropel. 2018. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling 69 97 .
Weng-Ming Chu & Koan-Yuh Chang. (2017) Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks. Computers & Operations Research 86, pages 30-40.
Crossref
Serdar Baysan, M. Bulent Durmusoglu & Didem Cinar. (2017) Team based labour assignment methodology for new product development projects. Computers & Industrial Engineering 106, pages 83-104.
Crossref
Nima Zoraghi, Aria Shahsavar, Babak Abbasi & Vincent Van Peteghem. (2016) Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies. TOP 25:1, pages 49-79.
Crossref
Rifat SonmezMustafa Gürel. (2016) Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem. Journal of Management in Engineering 32:6.
Crossref
Angela Chen, Yun-Chia Liang & Jose Padilla. (2016) A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags. Algorithms 9:4, pages 63.
Crossref
Mayowa Ayodele, John McCall & Olivier Regnier-Coudert. (2016) BPGA-EDA for the multi-mode resource constrained project scheduling problem. BPGA-EDA for the multi-mode resource constrained project scheduling problem.
A. Kaveh, M. Khanzadi & M. Alipour. (2016) Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms. International Journal of Civil Engineering 14:5, pages 325-337.
Crossref
M. Khanzadi, A. Kaveh, M. Alipour & H. Karimi Aghmiuni. (2016) Application of CBO and CSS for Resource Allocation and Resource Leveling Problem. Iranian Journal of Science and Technology, Transactions of Civil Engineering 40:1, pages 1-10.
Crossref
Fatemeh Faghih-Mohammadi, Abbas Seifi & Mohammad Khalighi-Sikaroudi. (2015) A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting. RAIRO - Operations Research 50:1, pages 91-118.
Crossref
Pieter Leyman & Mario Vanhoucke. (2016) Payment models and net present value optimization for resource-constrained project scheduling. Computers & Industrial Engineering 91, pages 139-153.
Crossref
Paweł B. Myszkowski & Jȩdrzej J. Siemieński. 2016. Computational Collective Intelligence. Computational Collective Intelligence 402 411 .
Царьков & Igor Tsarkov. (2015) Easy Heuristic Way of Compromise Schedules Finding in Projects with Double-Constrained Resources. Russian Journal of Project Management 4:4, pages 12-22.
Crossref
Jordy BatselierMario Vanhoucke. (2015) Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost. Journal of Construction Engineering and Management 141:11.
Crossref
Kirils Bibiks, Fun Hu, Jian-Ping Li & Aleister Smith. (2015) Discrete Cuckoo Search for Resource Constrained Project Scheduling Problem. Discrete Cuckoo Search for Resource Constrained Project Scheduling Problem.
Yanni Song, Jing Liu, Martin O. Wimmers & Zhongzhou Jiang. (2015) A differential evolution algorithm with local search for resource investment project scheduling problems. A differential evolution algorithm with local search for resource investment project scheduling problems.
Lu GanJiuping Xu. (2015) Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty. Journal of Management in Engineering 31:3.
Crossref
Jordy Batselier & Mario Vanhoucke. (2015) Construction and evaluation framework for a real-life project database. International Journal of Project Management 33:3, pages 697-710.
Crossref
A. Kaveh & V.R. MahdaviA. Kaveh & V. R. Mahdavi. 2015. Colliding Bodies Optimization. Colliding Bodies Optimization 261 277 .
Lixia Wang & Jing Liu. 2015. Proceedings of the 18th Asia Pacific Symposium on Intelligent and Evolutionary Systems, Volume 1. Proceedings of the 18th Asia Pacific Symposium on Intelligent and Evolutionary Systems, Volume 1 271 283 .
José Coelho & Mario Vanhoucke. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 491 511 .
Marek Mika, Grzegorz Waligóra & Jan Wȩglarz. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 445 490 .
Belaïd Aouni, Gilles d’Avignon & Michel Gagnon. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 429 442 .
Olfa Dridi, Saoussen Krichen & Adel Guitouni. (2014) A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem. International Transactions in Operational Research 21:6, pages 935-953.
Crossref
Peng Wuliang, Huang Min & Hao Yongping. (2014) An improved ant algorithm for Multi-mode Resource Constrained Project Scheduling Problem. RAIRO - Operations Research 48:4, pages 595-614.
Crossref
Elham Nabipoor Afruzi, Amir Abbas Najafi, Emad Roghanian & Mostafa Mazinani. (2014) A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Computers & Operations Research 50, pages 80-96.
Crossref
Angela Chen, Yun-Chia Liang & Jose Padilla. (2014) An Entropy-Based Upper Bound Methodology for Robust Predictive Multi-Mode RCPSP Schedules. Entropy 16:9, pages 5032-5067.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2014) An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. European Journal of Operational Research 235:1, pages 62-72.
Crossref
Lixia Wang, Jing Liu & Mingxing Zhou. 2014. Simulated Evolution and Learning. Simulated Evolution and Learning 680 690 .
Mónica A. Santos & Anabela P. Tereso. 2014. Essays in Production, Project Planning and Scheduling. Essays in Production, Project Planning and Scheduling 249 275 .
Heng Li & Hong Zhang. (2013) Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints. Automation in Construction 35, pages 431-438.
Crossref
Umut Beşikci, Ümit Bilge & Gündüz Ulusoy. (2012) Resource dedication problem in a multi-project environment. Flexible Services and Manufacturing Journal 25:1-2, pages 206-229.
Crossref
Parviz Ghoddousi, Ehsan Eshtehardian, Shirin Jooybanpour & Ashtad Javanmardi. (2013) Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Automation in Construction 30, pages 216-227.
Crossref
E. Nabipoor Afruzi, E. Roghanian, A.A. Najafi & M. Mazinani. (2013) A multi-mode resource-constrained discrete time–cost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm. Scientia Iranica.
Crossref
������, Igor Demkin, ������ & Valeriy Lesnykh. (2012) Risk analysis of oil and gas projects: possible problems, approaches to solving. Russian Journal of Project Management 1:1, pages 0-0.
Crossref
Long Chen, Xiaoping Li & Zhicheng Cai. (2012) Heuristic methods for minimizing resource availability costs in multi-mode project scheduling. Heuristic methods for minimizing resource availability costs in multi-mode project scheduling.
Michel Gagnon, Gilles d'Avignon & Belaid Aouni. (2012) Resource‐constrained project scheduling through the goal programming model: integration of the manager's preferences. International Transactions in Operational Research 19:4, pages 547-565.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2010) Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. Journal of Heuristics 17:6, pages 705-728.
Crossref
Haiying Ren & Yuanyuan Wang. (2011) A Survey of Multi-Agent Methods for Solving Resource Constrained Project Scheduling Problems. A Survey of Multi-Agent Methods for Solving Resource Constrained Project Scheduling Problems.
José Coelho & Mario Vanhoucke. (2011) Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research 213:1, pages 73-82.
Crossref
Zhimiao Tao. 2011. Rough Multiple Objective Decision Making. Rough Multiple Objective Decision Making 377 400 .
Jan Węglarz, Joanna Józefowska, Marek Mika & Grzegorz Waligóra. (2011) Project scheduling with finite or infinite number of activity processing modes – A survey. European Journal of Operational Research 208:3, pages 177-205.
Crossref
Ruey-Maw Chen & Chuin-Mu Wang. (2011) Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid. Abstract and Applied Analysis 2011, pages 1-20.
Crossref
Mónica A. Santos & Anabela P. Tereso. 2011. Soft Computing in Industrial Applications. Soft Computing in Industrial Applications 239 248 .
Sonda Elloumi & Philippe Fortemps. (2010) A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research 205:1, pages 31-41.
Crossref
Angela H. L. Chen & Chiuh-Cheng Chyu. (2010) Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach. Journal of Zhejiang University SCIENCE C 11:6, pages 481-494.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2010) A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research 201:2, pages 409-418.
Crossref
S. Kumanam,K. Raja,. (2009) Multi-project Scheduling using a Heuristic and Memetic Alogrithm. Journal for Manufacturing Science and Production 10:3-4, pages 249-256.
Crossref
N. Damak, B. Jarboui, P. Siarry & T. Loukil. (2009) Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & Operations Research 36:9, pages 2653-2659.
Crossref
Lin-Yu Tseng & Shih-Chieh Chen. (2009) Two-Phase Genetic Local Search Algorithm for the Multimode Resource-Constrained Project Scheduling Problem. IEEE Transactions on Evolutionary Computation 13:4, pages 848-857.
Crossref
J. Magalhães-Mendes. (2009) Uma Metaheurística para a Programação de Projectos com Multi-Modos e Recursos Limitados. Iberoamerican Journal of Industrial Engineering 1:1, pages 88-105.
Crossref
Antonio Lova, Pilar Tormos, Mariamar Cervantes & Federico Barber. (2009) An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. International Journal of Production Economics 117:2, pages 302-316.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. 2009. Evolutionary Computation in Combinatorial Optimization. Evolutionary Computation in Combinatorial Optimization 85 96 .
A. R. Pourghaderi, S. A. Torabi & J. Talebi. (2008) Scatter search for multi-mode resource-constrained project scheduling problems. Scatter search for multi-mode resource-constrained project scheduling problems.
Angela H. L. Chen & Chiuh-Cheng Chyu. (2008) A memetic algorithm for maximizing net present value in resource-constrained project scheduling problem. A memetic algorithm for maximizing net present value in resource-constrained project scheduling problem.
B. Jarboui, N. Damak, P. Siarry & A. Rebai. (2008) A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 195:1, pages 299-308.
Crossref
Rina Agarwal, M. K. Tiwari & S. K. Mukherjee. (2006) Artificial immune system based approach for solving resource constraint project scheduling problem. The International Journal of Advanced Manufacturing Technology 34:5-6, pages 584-593.
Crossref
Jirachai Buddhakulsomsiri & David S. Kim. (2007) Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 178:2, pages 374-390.
Crossref
S. Kumanan, G. Jegan Jose & K. Raja. (2006) Multi-project scheduling using an heuristic and a genetic algorithm. The International Journal of Advanced Manufacturing Technology 31:3-4, pages 360-366.
Crossref
Jirachai Buddhakulsomsiri & David S. Kim. (2006) Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 175:1, pages 279-295.
Crossref
K. Bouleimen & H. Lecocq. (2003) A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149:2, pages 268-281.
Crossref
R Kolisch & R Padman. (2001) An integrated survey of deterministic project scheduling. Omega 29:3, pages 249-272.
Crossref
Chung-Wei Feng, Liang Liu & Scott A. Burns. (2000) Stochastic Construction Time-Cost Trade-Off Analysis. Journal of Computing in Civil Engineering 14:2, pages 117-126.
Crossref
U.Z. Sanal. (2000) A decision support system for fuzzy scheduling of software projects. A decision support system for fuzzy scheduling of software projects.
Ana Viana & Jorge Pinho de Sousa. (2000) Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research 120:2, pages 359-374.
Crossref
Bert De Reyck & Willy Herroelen. (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 119:2, pages 538-556.
Crossref
Lucio Bianco, Paolo Dell'Olmo, Stefano Giordani & Maria Grazia Speranza. (1999) Minimizing makespan in a multimode multiprocessor shop scheduling problem. Naval Research Logistics 46:8, pages 893-911.
Crossref
L. Ozdamar. (1999) A genetic algorithm approach to a general category project scheduling problem. IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 29:1, pages 44-59.
Crossref
Rainer Kolisch, Christoph Schwindt & Arno Sprecher. 1999. Project Scheduling. Project Scheduling 197 212 .
L. Bianco, P. Dell'Olmo & M. Grazia Speranza. (1998) Heuristics for multimode scheduling problems with dedicated resources. European Journal of Operational Research 107:2, pages 260-271.
Crossref
Taeho Ahn & S.Selcuk Erenguc. (1998) The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure. European Journal of Operational Research 107:2, pages 250-259.
Crossref
Oya Icmeli Tukel & Walter O. Rom. (1998) Analysis of the characteristics of projects in diverse industries. Journal of Operations Management 16:1, pages 43-61.
Crossref
Linet Özdamar & Hakan Dündar. (1997) A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows. Computers & Operations Research 24:12, pages 1187-1200.
Crossref
Arno Sprecher, Sönke Hartmann & Andreas Drexl. (1997) An exact algorithm for project scheduling with multiple modes. OR Spektrum 19:3, pages 195-203.
Crossref
Birger Franck, Klaus Neumann & Christoph Schwindt. (1997) A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. OR Spektrum 19:2, pages 77-85.
Crossref
Gündüz Ulusoy & Linet Özdamar. (1996) A framework for an interactive project scheduling system under limited resources. European Journal of Operational Research 90:2, pages 362-375.
Crossref
Fayez F. Boctor. (1996) A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research 90:2, pages 349-361.
Crossref
Wendi Tian & Erik Demeulemeester. (2010) Railway Scheduling Reduces the Expected Project Makespan. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.