Erlianasha Samsuria, Mohd Saiful Azimi Mahmud, Norhaliza Abdul Wahab, Muhammad Zakiyullah Romdlony, Mohamad Shukri Zainal Abidin & Salinda Buyamin. (2024) Adaptive fuzzy-genetic algorithm operators for solving mobile robot scheduling problem in job-shop FMS environment. Robotics and Autonomous Systems 176, pages 104683.
Crossref
Amir Hosseini, Alena Otto & Erwin Pesch. (2024) Scheduling in manufacturing with transportation: Classification and solution techniques. European Journal of Operational Research 315:3, pages 821-843.
Crossref
N. Sivarami Reddy, M. Padma Lalitha, D. V. Ramamurthy & K. Prahlada Rao. (2022) Concurrent Scheduling of Machines and AGVS in Multi-Machine FMS with Alternative Routing Using Symbiotic Organisms Search Algorithm. Journal of Advanced Manufacturing Systems 22:03, pages 513-548.
Crossref
Jiachen Sun, Zifeng Xu, Zhenhao Yan, Lilan Liu & Yixiang Zhang. (2023) An Approach to Integrated Scheduling of Flexible Job-Shop Considering Conflict-Free Routing Problems. Sensors 23:9, pages 4526.
Crossref
Hongtao Tang, Jiawei Wang & Zhixiong Yang. (2023) Research on the Integration and Scheduling of AGVs and Machines in Sample Testing Laboratory. IEEE Access 11, pages 70652-70667.
Crossref
Wangming Li, Dong Han, Liang Gao, Xinyu Li & Yang Li. (2022) Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop. Chinese Journal of Mechanical Engineering 35:1.
Crossref
Padma Lalitha Mareddy, Sivarami Reddy Narapureddy, Venkata Ramamurthy Dwivedula & Prahlada Rao Karanam. (2022) Optimum scheduling of machines, automated guided vehicles and tools without tool delay in a multi‐machine flexible manufacturing system using symbiotic organisms search algorithm. Concurrency and Computation: Practice and Experience 34:15.
Crossref
M. Nageswara Rao, Kiran Kumar Dama, T. Vijaya Kumar, K. Prakash Babu & Upendra Rajak. 2022. Technology Innovation in Mechanical Engineering. Technology Innovation in Mechanical Engineering
889
901
.
M. Nageswara Rao, K. Gaya Prasad, I. Praneeth, G. Sai Prudhvi, E. Vineeth & Upendra Rajak. 2022. Technology Innovation in Mechanical Engineering. Technology Innovation in Mechanical Engineering
825
836
.
Yumin He & Milton Smith. 2021. Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems. Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems
507
515
.
Amila Thibbotuwawa, Grzegorz Bocewicz, Peter Nielsen & Zbigniew Banaszak. (2020) Unmanned Aerial Vehicle Routing Problems: A Literature Review. Applied Sciences 10:13, pages 4504.
Crossref
Humyun Fuad Rahman, Mukund Nilakantan Janardhanan & Peter Nielsen. (2020) An integrated approach for line balancing and AGV scheduling towards smart assembly systems. Assembly Automation 40:2, pages 219-234.
Crossref
Humyun Fuad Rahman & Izabela Nielsen. (2019) Scheduling automated transport vehicles for material distribution systems. Applied Soft Computing 82, pages 105552.
Crossref
Milica Petrović, Zoran Miljković & Aleksandar Jokić. (2019) A novel methodology for optimal single mobile robot scheduling using whale optimization algorithm. Applied Soft Computing 81, pages 105520.
Crossref
Viveak Kumar Chawla, Arindam Kumar Chanda & Surjit Angra. (2018) A Clonal Selection Algorithm for Minimizing Distance Travel and Back Tracking of Automatic Guided Vehicles in Flexible Manufacturing System. Journal of The Institution of Engineers (India): Series C 100:3, pages 401-410.
Crossref
Xiangfei Lyu, Yuchuan Song, Changzheng He, Qi Lei & Weifei Guo. (2019) Approach to Integrated Scheduling Problems Considering Optimal Number of Automated Guided Vehicles and Conflict-Free Routing in Flexible Manufacturing Systems. IEEE Access 7, pages 74909-74924.
Crossref
Amirabbas Tabatabaei, Farshid Torabi & Tontiwachwuthikul Paitoon. (2018) Simultaneous scheduling of machines and automated guided vehicles utilizing heuristic search algorithm. Simultaneous scheduling of machines and automated guided vehicles utilizing heuristic search algorithm.
N. Sivarami Reddy, D.V. RamamurthyDr.Dr. & K. Prahlada RaoDr.Dr.. (2017) Simultaneous Scheduling of Jobs, AGVs and Tools Considering Tool Transfer Times in Multi Machine FMS By SOS Algorithm. IOP Conference Series: Materials Science and Engineering 225, pages 012294.
Crossref
Patrick Pujo, Fouzia Ounnar, Damien Power & Selma Khader. (2016) Wireless Holon Network for job shop isoarchic control. Computers in Industry 83, pages 12-27.
Crossref
Laurent Deroussi. 2016. Metaheuristics for Logistics. Metaheuristics for Logistics
187
195
.
Philippe Lacomme, Mohand Larabi & Nikolay Tchernev. (2013) Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Economics 143:1, pages 24-34.
Crossref
Quang-Vinh Dang & Izabela Nielsen. 2013. Highlights on Practical Applications of Agents and Multi-Agent Systems. Highlights on Practical Applications of Agents and Multi-Agent Systems
118
128
.
P. Udhayakumar & S. Kumanan. (2011) Integrated scheduling of flexible manufacturing system using evolutionary algorithms. The International Journal of Advanced Manufacturing Technology 61:5-8, pages 621-635.
Crossref
I. A. Chaudhry, S. Mahmood & M. Shami. (2011) Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms. Journal of Central South University 18:5, pages 1473-1486.
Crossref
Tadeusz Sawik. 2011. Scheduling in Supply Chains Using Mixed Integer Programming. Scheduling in Supply Chains Using Mixed Integer Programming
437
447
.
M. V. Satish Kumar, Ranga Janardhana & C. S. P. Rao. (2010) Simultaneous scheduling of machines and vehicles in an FMS environment with alternative routing. The International Journal of Advanced Manufacturing Technology 53:1-4, pages 339-351.
Crossref
Parham Azimi. (2011) Alleviating the Collision States and Fleet Optimization by Introducing a New Generation of Automated Guided Vehicle Systems. Modelling and Simulation in Engineering 2011, pages 1-8.
Crossref
Kap Hwan Kim & Jung Ho Lee. (2010) Scheduling ship operations in automated container terminals. Scheduling ship operations in automated container terminals.
A. Caumond, P. Lacomme, A. Moukrim & N. Tchernev. (2009) An MILP for scheduling problems in an FMS with one vehicle. European Journal of Operational Research 199:3, pages 706-722.
Crossref
Tauseef Aized. (2009) Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods. Computers & Industrial Engineering 57:3, pages 822-831.
Crossref
Henry Y.K. Lau & Ying Zhao. (2008) Integrated scheduling of handling equipment at automated container terminals. International Journal of Production Economics 112:2, pages 665-682.
Crossref
D. K. Liu & A. K. Kulatunga. 2007. Evolutionary Scheduling. Evolutionary Scheduling
437
464
.
Laurent Deroussi, Michel Gourgand & Nikolay Tchernev. (2006) Combining Optimization Methods and Discrete Event Simulation: A Case Study in Flexible Manufacturing Systems. Combining Optimization Methods and Discrete Event Simulation: A Case Study in Flexible Manufacturing Systems.
Iris F.A. Vis. (2006) Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research 170:3, pages 677-709.
Crossref
M.J.R. Ebben, M.C. van der Heijden & A. van Harten. (2005) Dynamic transport scheduling under multiple resource constraints. European Journal of Operational Research 167:2, pages 320-335.
Crossref
S.S. Sankar & S.G. Ponnambalam. (2005) An intelligent integrated scheduling model for Flexible Manufacturing System. An intelligent integrated scheduling model for Flexible Manufacturing System.
Matthieu van der Heijden, Mark Ebben, Noud Gademann & Aart van Harten. 2005. Container Terminals and Automated Transport Systems. Container Terminals and Automated Transport Systems
259
286
.
S.S. Sankar, R. Rajkumar, S.G. Ponnambalam & M. Gurumarimuthu. (2004) Integrated scheduling of material handling and manufacturing activities in flexible manufacturing system. Integrated scheduling of material handling and manufacturing activities in flexible manufacturing system.
P. Lacomme, A. Moukrim & N. Tchernev. (2002) A NEW LOWER BOUND FOR SCHEDULING OF FMS BASED ON AGV MATERIAL HANDLING. IFAC Proceedings Volumes 35:1, pages 217-222.
Crossref
L. Deroussi, M. Gourgand & N. Tchernev. (2001) Coupling local search methods and simulated annealing to the job shop scheduling problem with transportation. Coupling local search methods and simulated annealing to the job shop scheduling problem with transportation.
P.R. Politano, H.A. Camargo, E.R.R. Kato & O. Morandin. (2000) A reactive programming procedure for flexible manufacturing system. A reactive programming procedure for flexible manufacturing system.
P. Lacomme, N. Tchernev & C. Chu. (1999) An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport. An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport.
N. Jawahar, P. Aravindan, S. G. Ponnambalam & R. K. Suresh. (1998) AGV schedule integrated with production in flexible manufacturing systems. The International Journal of Advanced Manufacturing Technology 14:6, pages 428-440.
Crossref
Srinivasan Rajagopalan & Sunderesh S Heragu. (1997) Advances in discrete material handling system design. Sadhana 22:2, pages 281-292.
Crossref
Mingyuan Chen. (1996) A mathematical programming model for AGVS planning and control in manufacturing systems. Computers & Industrial Engineering 30:4, pages 647-658.
Crossref