29
Views
28
CrossRef citations to date
0
Altmetric
Original Articles

Estimating the throughput of a cyclic assembly system

Pages 1403-1419 | Received 01 May 1993, Published online: 07 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

J. Prakash & J.F. Chin. (2015) Modified CONWIP systems: a review and classification. Production Planning & Control 26:4, pages 296-307.
Read now
Svenja Lagershausen, Michael Manitz & Horst Tempelmeier. (2013) Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces. IIE Transactions 45:5, pages 502-515.
Read now
Jingshan Li, Dennis E. Blumenfeld, Ningjian Huang & Jeffrey M. Alden. (2009) Throughput analysis of production systems: recent advances and future topics. International Journal of Production Research 47:14, pages 3823-3851.
Read now
MICHAEL MASIN, YALET. HERER & EZEYM. DAR-EL. (2005) Design of self-regulating production control systems by Tradeoffs Programming. IIE Transactions 37:3, pages 217-232.
Read now
IZAK DUENYAS & PRAYOON PATANA-ANAKE. (1998) Base-stock control for single-product tandem make-to-stock systems. IIE Transactions 30:1, pages 31-39.
Read now
Izak Duenyas & MatthewF. Keblis. (1995) Release policies for assembly systems. IIE Transactions 27:4, pages 507-518.
Read now

Articles from other publishers (20)

S. Afshin Mansouri, Davood Golmohammadi & Jason Miller. (2019) The moderating role of master production scheduling method on throughput in job shop systems. International Journal of Production Economics 216, pages 67-80.
Crossref
Erkut Sönmez, Alan Scheller-Wolf & Nicola Secomandi. (2017) An Analytical Throughput Approximation for Closed Fork/Join Networks. INFORMS Journal on Computing 29:2, pages 251-267.
Crossref
Beixin Xia, Binghai Zhou, Ci Chen & Lifeng Xi. (2014) A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers. Journal of Intelligent Manufacturing 27:4, pages 765-779.
Crossref
Yacob KhojastehYacob Khojasteh. 2016. Production Control Systems. Production Control Systems 7 24 .
Saeed Yaghoubi, Siamak Noori & Amir Azaron. (2013) Lead time control in multi-class multi-stage assembly systems with finite capacity. Computers & Industrial Engineering 66:4, pages 808-817.
Crossref
Chan-Woo Park & Hyo-Seong Lee. (2013) Performance evaluation of a multi-product CONWIP assembly system with correlated external demands. International Journal of Production Economics 144:1, pages 334-344.
Crossref
Svenja LagershausenSvenja Lagershausen. 2013. Performance Analysis of Closed Queueing Networks. Performance Analysis of Closed Queueing Networks 5 13 .
Yaghoub Khojasteh-Ghamari. (2009) Developing a framework for performance analysis of a production process controlled by Kanban and CONWIP. Journal of Intelligent Manufacturing 23:1, pages 61-71.
Crossref
Yaghoub Khojasteh-Ghamari. (2008) A performance comparison between Kanban and CONWIP controlled assembly systems. Journal of Intelligent Manufacturing 20:6, pages 751-760.
Crossref
Michael Manitz. (2008) Queueing-model based analysis of assembly lines with finite buffers and general service times. Computers & Operations Research 35:8, pages 2520-2536.
Crossref
W. H. Ip, Min Huang, K. L. Yung, Dingwei Wang & Xingwei Wang. (2007) CONWIP based control of a lamp assembly production line. Journal of Intelligent Manufacturing 18:2, pages 261-271.
Crossref
Joseph Y‐T. Leung, Haibing Li & Michael Pinedo. (2006) Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel. Naval Research Logistics (NRL) 53:4, pages 243-260.
Crossref
Joseph Y-T. Leung, Haibing Li & Michael Pinedo. 2005. Multidisciplinary Scheduling: Theory and Applications. Multidisciplinary Scheduling: Theory and Applications 37 53 .
P. CHANDRASEKHAR RAO & RAJAN SURI. (2009) PERFORMANCE ANALYSIS OF AN ASSEMBLY STATION WITH INPUT FROM MULTIPLE FABRICATION LINES. Production and Operations Management 9:3, pages 283-302.
Crossref
H. Ayhan & M.A. Wortman. (1999) Job flow control in assembly operations. IEEE Transactions on Automatic Control 44:4, pages 864-868.
Crossref
Hayriye Ayhan & Martin A. Wortman. (1999) An approximation for computing the throughput of closed assembly-type queueing networks. European Journal of Operational Research 112:1, pages 107-121.
Crossref
Manish K. Govil & Michael C. Fu. (1999) Queueing theory in manufacturing: A survey. Journal of Manufacturing Systems 18:3, pages 214-240.
Crossref
Chang Sup Sung & Sang Hum Yoon. (1998) Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines. International Journal of Production Economics 54:3, pages 247-255.
Crossref
Shimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen WarneckeShimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen Warnecke. 1997. Industrial Assembly. Industrial Assembly 259 311 .
P. CHANDRASEKHAR RAO & RAJAN SURI. (2009) APPROXIMATE QUEUEING NETWORK MODELS FOR CLOSED FABRICATION/ASSEMBLY SYSTEMS. PART I: SINGLE LEVEL SYSTEMS. Production and Operations Management 3:4, pages 244-275.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.