Hermawan, Jati Utomo Dwi Hatmoko & Jovana Neilkelvin. 2023. Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering. Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering
823
831
.
Geraldo Ferrer & D. Clay Whybark. 2022. Handbook of Environmentally Conscious Manufacturing. Handbook of Environmentally Conscious Manufacturing
39
48
.
Michael H. Wang. 2022. Handbook of Environmentally Conscious Manufacturing. Handbook of Environmentally Conscious Manufacturing
113
126
.
Francesco De Fazio, Conny Bakker, Bas Flipsen & Ruud Balkenende. (2021) The Disassembly Map: A new method to enhance design for product repairability. Journal of Cleaner Production 320, pages 128552.
Crossref
Szabina Fodor, Ildikó Szabó & Katalin Ternai. (2021) Competence-Oriented, Data-Driven Approach for Sustainable Development in University-Level Education. Sustainability 13:17, pages 9977.
Crossref
Sercan Ozcan & Adnan Corum. (2021) A Scientometric Analysis of Remanufacturing by Mapping Scientific, Organizational, and National Concentration Zones. IEEE Transactions on Engineering Management 68:4, pages 1055-1071.
Crossref
Mohand-Lounes Bentaha, Alexandre Voisin & Pascale Marangé. (2020) A decision tool for disassembly process planning under end-of-life product quality. International Journal of Production Economics 219, pages 386-401.
Crossref
Jiyoun C. Chang, Stephen C. Graves, Randolph E. Kirchain & Elsa A. Olivetti. (2019) Integrated planning for design and production in two-stage recycling operations. European Journal of Operational Research 273:2, pages 535-547.
Crossref
Hasan Dinçer, Serhat Yuksel & Tuba Bozaykut-Buk. 2019. Green Business. Green Business
1328
1359
.
Dong-Hyun Kim, Hyoung-Ho Doh & Dong-Ho Lee. (2016) Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 232:5, pages 867-878.
Crossref
Hyung-Won Kim & Dong-Ho Lee. (2018) A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times. The International Journal of Advanced Manufacturing Technology 96:1-4, pages 1341-1354.
Crossref
Hasan Dinçer, Serhat Yuksel & Tuba Bozaykut-Buk. 2018. Handbook of Research on Supply Chain Management for Sustainable Development. Handbook of Research on Supply Chain Management for Sustainable Development
144
175
.
Yoshihisa Sugimura & Shinsuke Murakami. (2018) Problems surrounding Reverse Logistics Study in Japan日本における静脈物流研究の課題. Journal of the Japan Society of Material Cycles and Waste Management 29:0, pages 44-58.
Crossref
Bo Xing & Tshilidzi MarwalaBo Xing & Tshilidzi Marwala. 2018. Smart Maintenance for Human–Robot Interaction. Smart Maintenance for Human–Robot Interaction
111
139
.
Anjar Priyono. (2017) Identifying Unique Characteristics of Disassembly for Various Product Recovery Methods with A Focus on Remanufacturing. MATEC Web of Conferences 124, pages 08001.
Crossref
Kuldip Singh Sangwan. (2017) Key Activities, Decision Variables and Performance Indicators of Reverse Logistics. Procedia CIRP 61, pages 257-262.
Crossref
Suhaiza Zailani, Kannan Govindan, Mohd Rizaimy Shaharudin & Elisa Eg Lay Kuan. (2017) Barriers to product return management in automotive manufacturing firms in Malaysia. Journal of Cleaner Production 141, pages 22-40.
Crossref
Marc Wouters, Susana Morales, Sven Grollmuss & Michael Scheer. 2016. Advances in Management Accounting. Advances in Management Accounting
139
274
.
Kyung-Wan Kang, Hyoung-Ho Doh, Jung-Hyeon Park & Dong-Ho Lee. (2012) Disassembly leveling and lot sizing for multiple product types: a basic model and its extension. The International Journal of Advanced Manufacturing Technology 82:9-12, pages 1463-1473.
Crossref
Mohd Rizaimy Shaharudin, Suhaiza Zailani & Keah Choon Tan. (2015) Barriers to product returns and recovery management in a developing country: investigation using multiple methods. Journal of Cleaner Production 96, pages 220-232.
Crossref
Sumit Gupta, G.S. Dangayach, Amit Kumar Singh & P.N. Rao. (2015) Analytic Hierarchy Process (AHP) Model for Evaluating Sustainable Manufacturing Practices in Indian Electrical Panel Industries. Procedia - Social and Behavioral Sciences 189, pages 208-216.
Crossref
Seamus M. McGovern & Surendra M. Gupta. (2015) Unified assembly- and disassembly-line model formulae. Journal of Manufacturing Technology Management 26:2, pages 195-212.
Crossref
Mohand Lounes Bentaha, Olga Battaïa & Alexandre Dolgui. (2014) A sample average approximation method for disassembly line balancing problem under uncertainty. Computers & Operations Research 51, pages 111-122.
Crossref
Michael R. Johnson & Ian P. McCarthy. (2014) Product recovery decisions within the context of Extended Producer Responsibility. Journal of Engineering and Technology Management 34, pages 9-28.
Crossref
Bo Xing & Wen-Jing Gao. 2014. Computational Intelligence in Remanufacturing. Computational Intelligence in Remanufacturing
151
170
.
Mark Errington & Stephen J Childe. (2013) A business process model of inspection in remanufacturing. Journal of Remanufacturing 3:1.
Crossref
Surendra GuptaSeamus McGovern & Surendra Gupta. 2013. Reverse Supply Chains. Reverse Supply Chains
83
96
.
Shana Smith, Greg Smith & Wei-Han Chen. (2012) Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning. Advanced Engineering Informatics 26:2, pages 306-316.
Crossref
Adam Mather, Raymond Cipra & Thomas Siegmund. (2012) Structural integrity during remanufacture of a topologically interlocked material. International Journal of Structural Integrity 3:1, pages 61-78.
Crossref
Shana Smith & Wei-Han Chen. 2012. Design for Innovative Value Towards a Sustainable Society. Design for Innovative Value Towards a Sustainable Society
806
810
.
P. Sasikumar & A. Noorul Haq. 2010. Enterprise Networks and Logistics for Agile Manufacturing. Enterprise Networks and Logistics for Agile Manufacturing
249
269
.
S. Wadhwa, J. Madaan & F.T.S. Chan. (2009) Flexible decision modeling of reverse logistics system: A value adding MCDM approach for alternative selection. Robotics and Computer-Integrated Manufacturing 25:2, pages 460-469.
Crossref
Jianjun Yi, Baiyang Ji, Changming Chen, Xiaoqiang Tian, Diqing Hu & Chenggang Li. (2009) Disassembling Analysis for the Automotive Products Based on Generalized CAD Models. Disassembling Analysis for the Automotive Products Based on Generalized CAD Models.
Xinyi Bu & Shunlei Xu. (2008) The profit model in reverse logistics under the different environment factors. The profit model in reverse logistics under the different environment factors.
Isabel FernándezJavier Puente, Nazario García & Alberto Gómez. (2008) A Decision-Making Support System on a Products Recovery Management Framework. A Fuzzy Approach. Concurrent Engineering 16:2, pages 129-138.
Crossref
Gu Qiaolun, Ji Jianhua & Gao Tiegang. (2008) Pricing management for a closed-loop supply chain. Journal of Revenue and Pricing Management 7:1, pages 45-60.
Crossref
Ou Tang, Robert W. Grubbström & Simone Zanoni. (2007) Planned lead time determination in a make-to-order remanufacturing system. International Journal of Production Economics 108:1-2, pages 426-435.
Crossref
Vaidyanathan JayaramanYadong Luo. (2007) Creating Competitive Advantages Through New Value Creation: A Reverse Logistics Perspective. Academy of Management Perspectives 21:2, pages 56-73.
Crossref
Samir K. Srivastava. (2007) Green supply-chain management: A state-of-the-art literature review. International Journal of Management Reviews 9:1, pages 53-80.
Crossref
Ruud H. Teunter. (2006) Determining optimal disassembly and recovery strategies. Omega 34:6, pages 533-537.
Crossref
Jun-Gyu Kang & P Xirouchakis. (2016) Disassembly sequencing for maintenance: A survey. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:10, pages 1697-1716.
Crossref
Kit Fai Pun. (2006) Determinants of environmentally responsible operations: a review. International Journal of Quality & Reliability Management 23:3, pages 279-297.
Crossref
Fabio Giudice, Guido La Rosa & Antonino Risitano. 2006. Product Design for the Environment. Product Design for the Environment
347
373
.
Winston. A. Knight. 2005. Advances in Integrated Design and Manufacturing in Mechanical Engineering. Advances in Integrated Design and Manufacturing in Mechanical Engineering
17
30
.
Nathalie Bostel, Pierre Dejax & Zhiqiang Lu. 2005. Logistics Systems: Design and Optimization. Logistics Systems: Design and Optimization
171
212
.
Aaron Hula, Kiumars Jalali, Karim Hamza, Steven J. Skerlos & Kazuhiro Saitou. (2003) Multi-Criteria Decision-Making for Optimization of Product Disassembly under Multiple Situations. Environmental Science & Technology 37:23, pages 5303-5313.
Crossref
Manbir S. Sodhi & Bryan Reimer. 2003. Advanced Planning and Scheduling Solutions in Process Industry. Advanced Planning and Scheduling Solutions in Process Industry
377
395
.
Tung-Lai Hu, Jiuh-Biing Sheu & Kuan-Hsiung Huang. (2002) A reverse logistics cost minimization model for the treatment of hazardous wastes. Transportation Research Part E: Logistics and Transportation Review 38:6, pages 457-473.
Crossref
Alfred J.D Lambert. (2002) Determining optimum disassembly sequences in electronic equipment. Computers & Industrial Engineering 43:3, pages 553-575.
Crossref
S. Das, V. Mani, R. Caudill & K. Limaye. (2002) Strategies and economics in the disassembly of personal computers-a case study. Strategies and economics in the disassembly of personal computers-a case study.
S. Das & D. Yedlarajiah. (2002) An integer programming model for prescribing material recovery strategies. An integer programming model for prescribing material recovery strategies.
Geraldo Ferrer. (2001) On the widget remanufacturing operation. European Journal of Operational Research 135:2, pages 373-393.
Crossref
D-H Lee, J-G Kang & P Xirouchakis. (2005) Disassembly planning and scheduling: Review and further research. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 215:5, pages 695-709.
Crossref
S. Das & S. Naik. (2001) The DBOM standard: a specification for efficient product data transfer between manufacturers and demanufacturers. The DBOM standard: a specification for efficient product data transfer between manufacturers and demanufacturers.
J.A. Isaacs & S.M. Gupta. 2001. Encyclopedia of Materials: Science and Technology. Encyclopedia of Materials: Science and Technology
7887
7892
.
Geraldo Ferrer & D. Clay Whybark. 2001. Handbook of Environmentally Conscious Manufacturing. Handbook of Environmentally Conscious Manufacturing
81
99
.
Michael H. Wang. 2001. Handbook of Environmentally Conscious Manufacturing. Handbook of Environmentally Conscious Manufacturing
267
291
.
J.A. Stuart & Qin Lu. (2000) A refine-or-sell decision model for a station with continuous reprocessing options in an electronics recycling center. IEEE Transactions on Electronics Packaging Manufacturing 23:4, pages 321-327.
Crossref
V. Daniel R. GuideJr.Jr., Vaidyanathan Jayaraman, Rajesh Srivastava & W. C. Benton. (2000) Supply-Chain Management for Recoverable Manufacturing Systems. Interfaces 30:3, pages 125-142.
Crossref
V.Daniel R GuideJr.Jr.. (2000) Production planning and control for remanufacturing: industry practice and research needs. Journal of Operations Management 18:4, pages 467-483.
Crossref
Q. Lu, V. Christina, J.A. Stuart & T. Rich. (2000) A practical framework for the reverse supply chain. A practical framework for the reverse supply chain.
W.A. Knight & M. Sodhi. (2000) Design for Bulk Recycling: Analysis of Materials Separation. CIRP Annals 49:1, pages 83-86.
Crossref
Pitipong Veerakamolmal & Surendra Gupta. 2000. Green Electronics/Green Bottom Line. Green Electronics/Green Bottom Line
69
82
.
Askiner Gungor & Surendra M Gupta. (1999) Issues in environmentally conscious manufacturing and product recovery: a survey. Computers & Industrial Engineering 36:4, pages 811-853.
Crossref
V.D.R. GuideJr.Jr., V. Jayaraman & R. Srivastava. (1999) The effect of lead time variation on the performance of disassembly release mechanisms. Computers & Industrial Engineering 36:4, pages 759-779.
Crossref
H.R Krikke, A van Harten & P.C Schuur. (1999) Business case Roteb: recovery strategies for monitors. Computers & Industrial Engineering 36:4, pages 739-757.
Crossref
Benita M. Beamon. (1999) Designing the green supply chain. Logistics Information Management 12:4, pages 332-342.
Crossref
PITIPONG VEERAKAMOLMAL & SURENDRA M. GUPTA. (1999) ANALYSIS OF DESIGN EFFICIENCY FOR THE DISASSEMBLY OF MODULAR ELECTRONIC PRODUCTS. Journal of Electronics Manufacturing 09:01, pages 79-95.
Crossref
P. Veerakamolmal & S.M. Gupta. (1999) A combinatorial cost-benefit analysis methodology for designing modular electronic products for the environment. A combinatorial cost-benefit analysis methodology for designing modular electronic products for the environment.
S.K. Das & S. Matthew. (1999) Characterization of material outputs from an electronics demanufacturing facility. Characterization of material outputs from an electronics demanufacturing facility.
K. Limaye & R.J. Caudill. (1999) System simulation and modeling of electronics demanufacturing facilities. System simulation and modeling of electronics demanufacturing facilities.
H.-J. Bullinger, J. Warschat & M.S.R. Bopp. (1999) Elimination of end-of-life cost through a standardised simultaneous design methodology for SME supply chains (ElectSME). Elimination of end-of-life cost through a standardised simultaneous design methodology for SME supply chains (ElectSME).
Anu Meacham, Reha Uzsoy & Uday Venkatadri. (1999) Optimal disassembly configurations for single and multiple products. Journal of Manufacturing Systems 18:5, pages 311-322.
Crossref
T. Andes & W. A. Knight. 1999. AMST ’99. AMST ’99
799
806
.
E. A. van der Laan, M. Fleischmann, R. Dekker & L. N. Van Wassenhove. 1999. Quantitative Models for Supply Chain Management. Quantitative Models for Supply Chain Management
807
837
.
B. O'Shea, S.S. Grewal & H. Kaebernick. (2016) State of the Art Literature Survey on Disassembly Planning. Concurrent Engineering 6:4, pages 345-357.
Crossref
M. Sodhi & W.A. Knight. (1998) Product Design for Disassembly and Bulk Recycling. CIRP Annals 47:1, pages 115-118.
Crossref
Harald Dyckhoff & Tom Gießler. 1998. Produktentstehung, Controlling und Umweltschutz. Produktentstehung, Controlling und Umweltschutz
167
190
.
Peter Kischka, Hans-Walter Lorenz, Ulrich Derigs, Wolfgang Domschke, Peter Kleinschmidt & Rolf MöhringKarl Inderfurth. 1998. Operations Research Proceedings 1997. Operations Research Proceedings 1997
446
455
.
W. A. Knight. 1998. Group Technology and Cellular Manufacturing. Group Technology and Cellular Manufacturing
15
36
.
V. Daniel & R. GuideJr.Jr.. (1997) Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. International Journal of Production Economics 53:1, pages 101-116.
Crossref
Moritz Fleischmann, Jacqueline M. Bloemhof-Ruwaard, Rommert Dekker, Erwin van der Laan, Jo A.E.E. van Nunen & Luk N. Van Wassenhove. (1997) Quantitative models for reverse logistics: A review. European Journal of Operational Research 103:1, pages 1-17.
Crossref
Robert Ayres, Geraldo Ferrer & Tania Van Leynseele. (1997) Eco-efficiency, asset recovery and remanufacturing. European Management Journal 15:5, pages 557-574.
Crossref
V.D.R. Guide & R. Srivastava. (1997) Recoverable manufacturing systems: a framework for analysis. Recoverable manufacturing systems: a framework for analysis.
M. Martinez, V.-H. Pham & J. Favrel. (1997) Dynamic generation of disassembly sequences. Dynamic generation of disassembly sequences.
W.A. Knight & G. Boothroyd. (1997) Analysis of products for end-of-life management. Analysis of products for end-of-life management.
Andrew Spicer & Michael H. Wang. (1997) Environmental Design Industrial Template (EDIT): a software tool for analysis of product retirement. Journal of Cleaner Production 5:3, pages 193-198.
Crossref
V.Daniel R. Guide, Mark E. Kraus & Rajesh Srivastava. (1997) Scheduling policies for remanufacturing. International Journal of Production Economics 48:2, pages 187-204.
Crossref
Tracy Bhamra. 1997. Proceedings of the Thirty-Second International Matador Conference. Proceedings of the Thirty-Second International Matador Conference
85
90
.