36
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate

Pages 623-629 | Received 01 Mar 1994, Published online: 03 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (11)

Heechul Bae, Ilkyeong Moon & Wonyoung Yun. (2014) Economic lot and supply scheduling problem: a time-varying lot sizes approach. International Journal of Production Research 52:8, pages 2422-2435.
Read now
Sanjay Sharma. (2013) Development of supplier relationship including cost of defectives in the cyclic production. Production Planning & Control 24:8-9, pages 759-768.
Read now
Christoph H. Glock. (2010) Batch sizing with controllable production rates. International Journal of Production Research 48:20, pages 5925-5942.
Read now
L E Cárdenas-Barrón. (2006) Optimal production policy with shelf-life including shortages: a comment. Journal of the Operational Research Society 57:12, pages 1499-1500.
Read now
S K Goyal & S Viswanathan. (2006) On ‘Optimal production policy with shelf life including shortages’. Journal of the Operational Research Society 57:6, pages 747-747.
Read now
M. Lütke entrup, H.-O. Günther, P. Van Beek, M. Grunow & T. Seiler. (2005) Mixed-Integer Linear Programming approaches to shelf-life-integrated planning and scheduling in yoghurt production. International Journal of Production Research 43:23, pages 5071-5100.
Read now
S Sharma. (2004) Optimal production policy with shelf life including shortages. Journal of the Operational Research Society 55:8, pages 902-909.
Read now
C. A. Soman, D. P. van Donk & G. J. C. Gaalman. (2004) A basic period approach to the economic lot scheduling problem with shelf life considerations. International Journal of Production Research 42:8, pages 1677-1689.
Read now
S. Viswanathan & S. K. Goyal. (2002) On 'Manufacturing batch size and ordering policy for products with shelf lives'. International Journal of Production Research 40:8, pages 1965-1970.
Read now
I. Moon, E. A. Silver & S. Choi. (2002) Hybrid genetic algorithm for the economic lot-scheduling problem. International Journal of Production Research 40:4, pages 809-824.
Read now

Articles from other publishers (30)

Christoph H. Glock & Eric H. Grosse. (2021) The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature. European Journal of Operational Research 288:3, pages 703-720.
Crossref
Mohammad AlDurgam, Kehinde Adegbola & Christoph H. Glock. (2017) A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate. International Journal of Production Economics 191, pages 335-350.
Crossref
Edwards A. Silver, David F. Pyke & Douglas J. Thomas. 2016. Inventory and Production Management in Supply Chains. Inventory and Production Management in Supply Chains 435 486 .
Sanjay Sharma. (2016) A unique index with the explicit cost related to forecast. Journal of Modelling in Management 11:2, pages 518-535.
Crossref
Maryam Mohammadi, S. Nurmaya Musa & Ardeshir Bahreininejad. (2014) Optimization of mixed integer nonlinear economic lot scheduling problem with multiple setups and shelf life using metaheuristic algorithms. Advances in Engineering Software 78, pages 41-51.
Crossref
S. Dousthaghi, R. Tavakkoli-Moghaddam & A. Makui. (2013) Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO. The International Journal of Advanced Manufacturing Technology 68:5-8, pages 1401-1416.
Crossref
Changyuan Yan, Yi Liao & Avijit Banerjee. (2013) Multi-product lot scheduling with backordering and shelf-life constraints. Omega 41:3, pages 510-516.
Crossref
Sanjay Sharma. (2013) Cycle time reduction in context to the make to order (MTO) environment. Journal of Manufacturing Technology Management 24:3, pages 448-464.
Crossref
Sanjay Sharma. (2010) Effects concerning quality level with the increase in production rate. The International Journal of Advanced Manufacturing Technology 53:5-8, pages 629-634.
Crossref
Zied Bahroun & Jean-Pierre Campagne. (2010) Medium Term Production Management for Cyclic Deliveries. Journal of Mathematical Modelling and Algorithms 9:4, pages 311-342.
Crossref
Sanjay Sharma. (2010) Policies concerning decisions related to quality level. International Journal of Production Economics 125:1, pages 146-152.
Crossref
Sanjay Sharma. (2009) Revisiting the shelf life constrained multi-product manufacturing problem. European Journal of Operational Research 193:1, pages 129-139.
Crossref
Sanjay Sharma. (2008) Single/ multiple parameter swapping in the context of Sanjay Sharma’s Theory of Exchange. The International Journal of Advanced Manufacturing Technology 40:5-6, pages 629-635.
Crossref
Sanjay Sharma. (2007) Effects of an increase in manufacturing rate in the context of cyclic production. The International Journal of Advanced Manufacturing Technology 39:7-8, pages 821-827.
Crossref
Sanjay Sharma. (2008) On the flexibility of demand and production rate. European Journal of Operational Research 190:2, pages 557-561.
Crossref
Sanjay Sharma. (2008) Issues concerning optimization of non-conventional parameters in manufacturing. International Journal on Interactive Design and Manufacturing (IJIDeM) 2:4, pages 219-223.
Crossref
Asif S. Raza & Ali Akgunduz. (2008) A comparative study of heuristic algorithms on Economic Lot Scheduling Problem. Computers & Industrial Engineering 55:1, pages 94-109.
Crossref
Sanjay Sharma. (2008) Theory of exchange. European Journal of Operational Research 186:1, pages 128-136.
Crossref
Sanjay Sharma. (2007) A modification for the carrying cost estimation with respect to the flexibility in production rate. The International Journal of Advanced Manufacturing Technology 36:11-12, pages 1252-1260.
Crossref
S Sharma. (2007) Minimizing the difference between intermittent and continuous production with back orders. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221:11, pages 1617-1623.
Crossref
Sanjay Sharma. (2007) A fresh approach to performance evaluation in a multi-item production scenario. European Journal of Operational Research 178:2, pages 627-630.
Crossref
S Sharma. (2007) A procedure to optimize the constrained multiple-item production system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221:3, pages 467-475.
Crossref
S. A. Raza, A. Akgunduz & M. Y. Chen. (2006) A tabu search algorithm for solving economic lot scheduling problem. Journal of Heuristics 12:6, pages 413-426.
Crossref
S Sharma. (2006) Narrowing the gap between continuous and intermittent manufacturing. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:11, pages 1901-1905.
Crossref
S Sharma & S K Goyal. (2006) A fresh approach to cyclic manufacturing. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:10, pages 1729-1733.
Crossref
S Sharma. (2016) Incorporating fractional backordering in the multi-product manufacturing situation with shelf-lives. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:7, pages 1151-1156.
Crossref
Syed Asif Raza & Ali Akgunduz. 2005. Evolutionary Computation in Combinatorial Optimization. Evolutionary Computation in Combinatorial Optimization 190 201 .
Yi Xu & Bhaba R. Sarker. (2003) Models for a family of products with shelf life, and production and shortage costs in emerging markets. Computers & Operations Research 30:6, pages 925-938.
Crossref
Bhaba R. Sarker, Subhasis Mukherjee & Chidambaram V. Balan. (1997) An order-level lot size inventory model with inventory-level dependent demand and deterioration. International Journal of Production Economics 48:3, pages 227-236.
Crossref
Bhaba R. Sarker & Junfang Yu. (1996) Lot-sizing and cyclic scheduling for multiple products in a flow shop. Computers & Industrial Engineering 30:4, pages 799-808.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.