Feiyu Yang, Yuhua Yang, Shaoquan Ni, Su Liu, Changan Xu, Dingjun Chen & Qingpeng Zhang. (2023) Single-track railway scheduling with a novel gridworld model and scalable deep reinforcement learning. Transportation Research Part C: Emerging Technologies 154, pages 104237.
Crossref
Fabian Dunke & Stefan Nickel. (2022) A multi-method approach to scheduling and efficiency analysis in dual-resource constrained job shops with processing time uncertainty. Computers & Industrial Engineering 168, pages 108067.
Crossref
Jiaxin Fan, Chunjiang Zhang, Qihao Liu, Weiming Shen & Liang Gao. (2022) An improved genetic algorithm for flexible job shop scheduling problem considering reconfigurable machine tools with limited auxiliary modules. Journal of Manufacturing Systems 62, pages 650-667.
Crossref
Katsumi Morikawa, Keisuke Nagasawa & Katsuhiko Takahashi. 2022. Intelligent Engineering and Management for Industry 4.0. Intelligent Engineering and Management for Industry 4.0
25
34
.
Matthias Thürer & Mark Stevenson. (2021) Material handling and order release control in high-variety make-to-order shops: an assessment by simulation. Operations Management Research 14:3-4, pages 494-506.
Crossref
Leilei Meng, Chaoyong Zhang, Biao Zhang & Yaping Ren. (2019) Mathematical Modeling and Optimization of Energy-Conscious Flexible Job Shop Scheduling Problem With Worker Flexibility. IEEE Access 7, pages 68043-68059.
Crossref
Ming Liu & Xin Liu. (2019) Satisfaction-driven bi-objective multi-skill workforce scheduling problem. IFAC-PapersOnLine 52:13, pages 229-234.
Crossref
Jing Zhang, Wanliang Wang & Xinli Xu. (2015) A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility. Journal of Intelligent Manufacturing 28:8, pages 1961-1972.
Crossref
Gregory T. Purdy, Jaime A. Camelio, Kimberly P. Ellis & Jean Peccoud. (2017) Opportunities to apply manufacturing systems analysis techniques in genetic manufacturing systems. Manufacturing Letters 13, pages 34-38.
Crossref
Edwards A. Silver, David F. Pyke & Douglas J. Thomas. 2016. Inventory and Production Management in Supply Chains. Inventory and Production Management in Supply Chains
661
712
.
Ya-Chu Yang, Yu-Ting Lin & Yi-Feng Hung. (2016) Solving the scheduling problem of machines with auxiliary tools. Solving the scheduling problem of machines with auxiliary tools.
Liang Gao & Quan-Ke Pan. (2016) A shuffled multi-swarm micro-migrating birds optimizer for a multi-resource-constrained flexible job shop scheduling problem. Information Sciences 372, pages 655-676.
Crossref
Benjamin J. Lobo, T. J. Thoney, Russell E. King & James R. Wilson. 2014. Essays in Production, Project Planning and Scheduling. Essays in Production, Project Planning and Scheduling
301
341
.
Benjamin J. Lobo, Thom J. Hodgson, Russell E. King, Kristin A. Thoney & James R. Wilson. (2013) Allocating job-shop manpower to minimize : Optimality criteria, search heuristics, and probabilistic quality metrics. Computers & Operations Research 40:10, pages 2569-2584.
Crossref
Benjamin J. Lobo, Thom J. Hodgson, Russell E. King, Kristin A. Thoney & James R. Wilson. (2013)
An effective lower bound on
in a worker-constrained job shop
. Computers & Operations Research 40:1, pages 328-343.
Crossref
Bernd Scholz-Reiter, Jens Heger & Torsten Hildebrandt. 2010. Machine Learning and Systems Engineering. Machine Learning and Systems Engineering
269
281
.
Xiaoying Xi, Lili Jiang & Qiang Zhang. (2009) Optimization for Multi-Resources-Constrained Job Shop Scheduling Based on Three-level Heuristic Algorithm. Optimization for Multi-Resources-Constrained Job Shop Scheduling Based on Three-level Heuristic Algorithm.
Huiyuan Ren, Lili Jiang, Xiaoying Xi & Muzhi Li. (2009) Heuristic Optimization for Dual-resource Constrained Job Shop Scheduling. Heuristic Optimization for Dual-resource Constrained Job Shop Scheduling.
Gert Nomden & Durk-Jouke van der Zee. (2008) Virtual cellular manufacturing: Configuring routing flexibility. International Journal of Production Economics 112:1, pages 439-451.
Crossref
Jos Bokhorst & Jannes Slomp. 2007. Workforce Cross Training. Workforce Cross Training
3
63
.
Sigrid Lise Nonås & Kai A. Olsen. (2005) Optimal and heuristic solutions for a scheduling problem arising in a foundry. Computers & Operations Research 32:9, pages 2351-2382.
Crossref
Gregory R. Heim. (2005) Mass Customization in Videotape Duplication and Conversion: Challenges of Flexible Duplication Systems, Fast Delivery, and Electronic Service. International Journal of Flexible Manufacturing Systems 16:4, pages 363-397.
Crossref
Hoda ElMaraghy, Vishvas Patel & Imed Ben Abdallah. (2000) Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms. Journal of Manufacturing Systems 19:3, pages 186-201.
Crossref
Peter B. Luh, Feng Liu & Bryan Moser. (1999) Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research 113:3, pages 575-592.
Crossref
V. Patel, H.A. ElMaraghy & I. Ben-Abdallah. (1999) Scheduling in dual-resources constrained manufacturing systems using genetic algorithms. Scheduling in dual-resources constrained manufacturing systems using genetic algorithms.
Kenneth N. McKay & Vincent C.S. Wiers. (1999) Unifying the theory and practice of production scheduling. Journal of Manufacturing Systems 18:4, pages 241-255.
Crossref
Hoda ElMaraghy, Vishvas Patel & Imed Ben Abdallah. (1999) A Genetic Algorithm Based Approach for Scheduling of Dual-Resource Constrainded Manufacturing Systems. CIRP Annals 48:1, pages 369-372.
Crossref
Willy Herroelen, Bert De Reyck & Erik Demeulemeester. (1998) Resource-constrained project scheduling: A survey of recent developments. Computers & Operations Research 25:4, pages 279-302.
Crossref
Hoda A. ElMaraghy, Imed Ben Abdallah & Waguih H. ElMaraghy. (1998) On-Line Simulation and Control in Manufacturing Systems. CIRP Annals 47:1, pages 401-404.
Crossref