Resource-constrained project scheduling by simulated annealing

Pages 2335-2351 | Received 01 Aug 1995, Published online: 24 Oct 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Zhenyuan Liu, Lei Xiao & Jing Tian. (2016) An activity-list-based nested partitions algorithm for resource-constrained project scheduling. International Journal of Production Research 54:16, pages 4744-4758.
Read now
Bartłomiej Sroka & Elżbieta Radziszewska-Zielina. (2016) An exact solution for the resource-constrained construction scheduling problem. Engineering Structures and Technologies 8:2, pages 71-78.
Read now
Huan-yu Zheng & Ling Wang. (2015) An effective teaching–learning-based optimisation algorithm for RCPSP with ordinal interval numbers. International Journal of Production Research 53:6, pages 1777-1790.
Read now
M H Sebt, Y Alipouri & Y Alipouri. (2013) Solving resource-constrained project scheduling problem with evolutionary programming. Journal of the Operational Research Society 64:9, pages 1327-1335.
Read now
Nai-Hsin Pan & Yung-Yu Lin. (2011) Using hybrid simulated annealing algorithm in resource constrained project scheduling problem. Journal of Statistics and Management Systems 14:3, pages 555-582.
Read now
J Alcaraz, C Maroto & R Ruiz. (2003) Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms. Journal of the Operational Research Society 54:6, pages 614-626.
Read now

Articles from other publishers (107)

Zied Bahroun, Rami As’ad, Moayad Tanash & Raed Athamneh. (2024) The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes. Management Systems in Production Engineering 32:1, pages 108-132.
Crossref
Sofía Rodríguez-Ballesteros, Javier Alcaraz & Laura Anton-Sanchez. (2024) Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: An experimental comparison. Computers & Operations Research 163, pages 106489.
Crossref
Alireza Etminaniesfahani, Hanyu Gu, Leila Moslemi Naeni & Amir Salehipour. (2023) An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem. Annals of Operations Research.
Crossref
Seyyed Jalaladdin Hosseini Dehshiri, Ahmad Yousefi Hanoomarvar & Maghsoud Amiri. (2023) Comparative performance of the NSGA-II and MOPSO algorithms and simulations for evaluating time–cost–quality–risk trade-off in multi-modal PERT networks. Soft Computing 27:24, pages 18651-18666.
Crossref
Yukang He, Tao Jia & Weibo Zheng. (2023) Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns. Annals of Operations Research.
Crossref
Ohiduzzaman Shuvo, Swajan Golder & Md. Rafiqul Islam. (2021) A hybrid metaheuristic method for solving resource constrained project scheduling problem. Evolutionary Intelligence 16:2, pages 519-537.
Crossref
Ying Liu, Ke You, Yutian Jiang, Zhangang Wu, Zhenyuan Liu, Gang Peng & Cheng Zhou. (2022) Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III). Automation in Construction 143, pages 104587.
Crossref
Saeed Aramesh, Uwe Aickelin & Hadi Akbarzadeh Khorshidi. (2022) A hybrid projection method for resource-constrained project scheduling problem under uncertainty. Neural Computing and Applications 34:17, pages 14557-14576.
Crossref
Javier Alcaraz, Laura Anton-Sanchez & Francisco Saldanha-da-Gama. (2022) Bi-objective resource-constrained project scheduling problem with time-dependent resource costs. Journal of Manufacturing Systems 63, pages 506-523.
Crossref
Ranjith K. Soman & Miguel Molina-Solana. (2022) Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning. Automation in Construction 134, pages 104069.
Crossref
HaoJie Chen, Guofu Ding, Shengfeng Qin & Jian Zhang. (2021) A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem. Expert Systems with Applications 167, pages 114174.
Crossref
Sonda Elloumi, Taïcir Loukil & Philippe Fortemps. (2021) Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem. Expert Systems with Applications 167, pages 114132.
Crossref
Amirreza NickkarYoung-Jae Lee. (2020) Resource-Constrained Automated Demand Responsive Feeder Transit System Project Scheduling Using Metaheuristics. Resource-Constrained Automated Demand Responsive Feeder Transit System Project Scheduling Using Metaheuristics.
Firoz Mahmud, Forhad Zaman, Ruhul Sarker & Daryl Essam. (2020) Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems. Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems.
Shengkai Chen, Shuliang Fang & Renzhong Tang. (2020) An ANN-Based Approach for Real-Time Scheduling in Cloud Manufacturing. Applied Sciences 10:7, pages 2491.
Crossref
Jia LiuYisheng LiuYing ShiJian Li. (2020) Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm. Journal of Computing in Civil Engineering 34:2.
Crossref
Arun Kumar Sangaiah, Ali Asghar Rahmani Hosseinabadi, Morteza Babazadeh Shareh, Seyed Yaser Bozorgi Rad, Atekeh Zolfagharian & Naveen Chilamkurti. (2020) IoT Resource Allocation and Optimization Based on Heuristic Algorithm. Sensors 20:2, pages 539.
Crossref
Dheeraj Joshi, M.L. Mittal, Milind Kumar Sharma & Manish Kumar. (2019) An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem. Journal of Modelling in Management 14:4, pages 1064-1087.
Crossref
Reza Zamani. (2019) An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains. RAIRO - Operations Research 53:4, pages 1309-1330.
Crossref
Min Xu, Min Ouyang, Zijun Mao & Xiaolin Xu. (2019) Improving repair sequence scheduling methods for postdisaster critical infrastructure systems. Computer-Aided Civil and Infrastructure Engineering 34:6, pages 506-522.
Crossref
Daniel Morillo Torres, Federico Barber & Miguel A Salido. (2017) A new model and metaheuristic approach for the energy-based resource-constrained scheduling problem. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 233:1, pages 293-305.
Crossref
Reza Zamani. (2019) An effective mirror-based genetic algorithm for scheduling multi-mode resource constrained projects. Computers & Industrial Engineering 127, pages 914-924.
Crossref
Dheeraj Joshi, M. L. Mittal & Manish Kumar. 2019. Harmony Search and Nature Inspired Optimization Algorithms. Harmony Search and Nature Inspired Optimization Algorithms 1101 1109 .
Liu Changchun, Xiang Xi, Zhang Canrong, Wang Qiang & Zheng Li. (2018) A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem. Computers & Industrial Engineering 125, pages 258-278.
Crossref
Min-Yuan ChengKuo-Yu HuangMerciawati Hutomo. (2018) Multiobjective Dynamic-Guiding PSO for Optimizing Work Shift Schedules. Journal of Construction Engineering and Management 144:9.
Crossref
Jürgen Hackl, Bryan T. Adey & Nam Lethanh. (2018) Determination of Near‐Optimal Restoration Programs for Transportation Networks Following Natural Hazard Events Using Simulated Annealing. Computer-Aided Civil and Infrastructure Engineering 33:8, pages 618-637.
Crossref
Kirils Bibiks, Yim-Fun Hu, Jian-Ping Li, Prashant Pillai & Aleister Smith. (2018) Improved discrete cuckoo search for the resource-constrained project scheduling problem. Applied Soft Computing 69, pages 493-503.
Crossref
Alexandros Tzanetos, Christos Kyriklidis, Anastasia Papamichail, Apostolis Dimoulakis & Georgios Dounias. (2018) A Nature Inspired metaheuristic for Optimal Leveling of Resources in Project Management. A Nature Inspired metaheuristic for Optimal Leveling of Resources in Project Management.
Roubila Lilia Kadri & Fayez F. Boctor. (2018) An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case. European Journal of Operational Research 265:2, pages 454-462.
Crossref
Daniel Morillo, Federico Barber & Miguel A. Salido. 2018. Recent Trends and Future Technology in Applied Intelligence. Recent Trends and Future Technology in Applied Intelligence 601 612 .
Ewa Ratajczak-Ropel & Aleksander SkakovskiEwa Ratajczak-Ropel. 2018. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling 33 67 .
Tajas Ruschke, Lukas Johannes Jung & Christian Hochberger. (2017) A Near Optimal Integrated Solution for Resource Constrained Scheduling, Binding and Routing on CGRAs. A Near Optimal Integrated Solution for Resource Constrained Scheduling, Binding and Routing on CGRAs.
Daniel Morillo, Federico Barber & Miguel A. Salido. (2017) Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem. Mathematical Problems in Engineering 2017, pages 1-15.
Crossref
Munir A. Nayak & Mark A. Turnquist. (2016) Optimal Recovery from Disruptions in Water Distribution Networks. Computer-Aided Civil and Infrastructure Engineering 31:8, pages 566-579.
Crossref
N.C. Brintha, J.T. Winowlin Jappes & Shajulin Benedict. (2016) A Modified Ant Colony based optimization for managing Cloud resources in manufacturing sector. A Modified Ant Colony based optimization for managing Cloud resources in manufacturing sector.
Maximilian Bügler & André Borrmann. 2016. Civil and Environmental Engineering. Civil and Environmental Engineering 173 195 .
Maximilian Bügler & André Borrmann. 2016. Handbook of Research on Computational Simulation and Modeling in Engineering. Handbook of Research on Computational Simulation and Modeling in Engineering 482 507 .
Behrouz Afshar-Nadjafi, Hamid Karimi, Amir Rahimi & Somayeh Khalili. (2015) Project scheduling with limited resources using an efficient differential evolution algorithm. Journal of King Saud University - Engineering Sciences 27:2, pages 176-184.
Crossref
Hongbo LiZhe XuErik Demeulemeester. (2015) Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering and Management 141:2.
Crossref
Lu Cheng, Guang Rui Liao & Zhen Yuan Liu. (2015) A Multi-Objective Immune Genetic Algorithm for Project Scheduling on Multi-Skill Resources. Applied Mechanics and Materials 719-720, pages 1268-1274.
Crossref
Lixia Wang & Jing Liu. 2015. Proceedings of the 18th Asia Pacific Symposium on Intelligent and Evolutionary Systems, Volume 1. Proceedings of the 18th Asia Pacific Symposium on Intelligent and Evolutionary Systems, Volume 1 271 283 .
Anurag Agarwal, Selcuk Colak & Selcuk Erenguc. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 57 74 .
Marek Mika, Grzegorz Waligóra & Jan Wȩglarz. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 445 490 .
Olfa Dridi, Saoussen Krichen & Adel Guitouni. (2014) A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem. International Transactions in Operational Research 21:6, pages 935-953.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2014) An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. European Journal of Operational Research 235:1, pages 62-72.
Crossref
Zhengwen He, Nengmin Wang & Pengxiang Li. (2012) Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective. Annals of Operations Research 213:1, pages 203-220.
Crossref
Lixia Wang, Jing Liu & Mingxing Zhou. 2014. Simulated Evolution and Learning. Simulated Evolution and Learning 680 690 .
Betty Biringer, Eric Vugrin & Drake Warren. 2013. Critical Infrastructure System Security and Resiliency. Critical Infrastructure System Security and Resiliency 131 170 .
Hossein Zoulfaghari, Javad Nematian, Nader Mahmoudi & Mehdi Khodabandeh. (2013) A New Genetic Algorithm for the RCPSP in Large Scale. International Journal of Applied Evolutionary Computation 4:2, pages 29-40.
Crossref
Hela Ouerfelli & Abdelaziz Dammak. (2013) The genetic algorithm with two point crossover to solve the resource-constrained project scheduling problems. The genetic algorithm with two point crossover to solve the resource-constrained project scheduling problems.
Nouha Nouri, Saoussen Krichen, Talel Ladhari & Princess Fatimah. (2013) A discrete artificial bee colony algorithm for resource-constrained project scheduling problem. A discrete artificial bee colony algorithm for resource-constrained project scheduling problem.
Amir Rahimi, Hamid Karimi & Behrouz Afshar-Nadjafi. (2013) Using meta-heuristics for project scheduling under mode identity constraints. Applied Soft Computing 13:4, pages 2124-2135.
Crossref
Juan Carlos Rivera & Ana Josefina Celín. (2013) Hybrid Variable Neighborhood and Simulated Annealing Heuristic Algorithm to Solve RCPSP. Revista Facultad de Ingeniería Universidad de Antioquia:56, pages 255-267.
Crossref
������, Igor Demkin, ������ & Valeriy Lesnykh. (2012) Risk analysis of oil and gas projects: possible problems, approaches to solving. Russian Journal of Project Management 1:1, pages 0-0.
Crossref
Jian Xiong, Ke-wei Yang, Jing Liu, Qing-song Zhao & Ying-wu Chen. (2012) A two-stage preference-based evolutionary multi-objective approach for capability planning problems. Knowledge-Based Systems 31, pages 128-139.
Crossref
Sanderson C. Vanucci, Eduardo G. Carrano, Rafael Bicalho & Ricardo H. C. Takahashi. (2012) A modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem. A modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem.
Konstantinos AnagnostopoulosGeorgios Koulinas. (2012) Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic. Journal of Computing in Civil Engineering 26:2, pages 204-213.
Crossref
Jens Czogalla & Andreas Fink. 2012. Hybrid Algorithms for Service, Computing and Manufacturing Systems. Hybrid Algorithms for Service, Computing and Manufacturing Systems 137 157 .
Virginia Yannibelli & Analía Amandi. 2012. Hybrid Artificial Intelligent Systems. Hybrid Artificial Intelligent Systems 159 173 .
Vincent Van Peteghem & Mario Vanhoucke. (2010) Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. Journal of Heuristics 17:6, pages 705-728.
Crossref
Chunfeng Liu & Shanlin Yang. (2011) A Serial Insertion Schedule Generation Scheme for Resource-constrained Project Scheduling. Journal of Computers 6:11.
Crossref
José Fernando Gonçalves, Mauricio G. C. Resende & Jorge J. M. Mendes. (2010) A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem. Journal of Heuristics 17:5, pages 467-486.
Crossref
José Coelho & Mario Vanhoucke. (2011) Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research 213:1, pages 73-82.
Crossref
Virginia Yannibelli & Analía Amandi. (2011) A knowledge-based evolutionary assistant to software development project scheduling. Expert Systems with Applications 38:7, pages 8403-8413.
Crossref
Andrew Lim, Hong Ma, Brian Rodrigues, Sun Teck Tan & Fei Xiao. (2011) New concepts for activity float in resource-constrained project management. Computers & Operations Research 38:6, pages 917-930.
Crossref
Koorush Ziarati, Reza Akbari & Vahid Zeighami. (2011) On the performance of bee algorithms for resource-constrained project scheduling problem. Applied Soft Computing 11:4, pages 3720-3733.
Crossref
Jan Węglarz, Joanna Józefowska, Marek Mika & Grzegorz Waligóra. (2011) Project scheduling with finite or infinite number of activity processing modes – A survey. European Journal of Operational Research 208:3, pages 177-205.
Crossref
Fayez F. Boctor, Jacques Renaud & Fabien Cornillier. (2011) Trip packing in petrol stations replenishment. Omega 39:1, pages 86-98.
Crossref
Anurag Agarwal, Selcuk Colak & Selcuk Erenguc. (2011) A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research 38:1, pages 44-50.
Crossref
Jairo R. Montoya-Torres, Edgar Gutierrez-Franco & Carolina Pirachicán-Mayorga. (2010) Project scheduling with limited resources using a genetic algorithm. International Journal of Project Management 28:6, pages 619-628.
Crossref
Sonda Elloumi & Philippe Fortemps. (2010) A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research 205:1, pages 31-41.
Crossref
Konstantinos P. Anagnostopoulos & Georgios K. Koulinas. (2010) A genetic hyperheuristic algorithm for the resource constrained project scheduling problem. A genetic hyperheuristic algorithm for the resource constrained project scheduling problem.
Yury Nikulin & Andreas Drexl. (2009) Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models. Journal of Scheduling 13:3, pages 261-280.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2010) A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research 201:2, pages 409-418.
Crossref
Jin-Lee KimRalph D. EllisJr.Jr.. (2010) Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. Journal of Construction Engineering and Management 136:2, pages 160-169.
Crossref
Jin-Lee Kim. (2009) Proposed methodology for comparing schedule generation schemes in construction resource scheduling. Proposed methodology for comparing schedule generation schemes in construction resource scheduling.
Khaled Moumene & Jacques A. Ferland. (2009) Activity list representation for a generalization of the resource-constrained project scheduling problem. European Journal of Operational Research 199:1, pages 46-54.
Crossref
Zhengwen He, Nengmin Wang, Tao Jia & Yu Xu. (2009) Simulated annealing and tabu search for multi-mode project payment scheduling. European Journal of Operational Research 198:3, pages 688-696.
Crossref
Lin-Yu Tseng & Shih-Chieh Chen. (2009) Two-Phase Genetic Local Search Algorithm for the Multimode Resource-Constrained Project Scheduling Problem. IEEE Transactions on Evolutionary Computation 13:4, pages 848-857.
Crossref
Jin-Lee Kim. (2009) Improved genetic algorithm for resource-constrained scheduling of large projects. Canadian Journal of Civil Engineering 36:6, pages 1016-1027.
Crossref
Antonio Lova, Pilar Tormos, Mariamar Cervantes & Federico Barber. (2009) An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. International Journal of Production Economics 117:2, pages 302-316.
Crossref
J.J.M. Mendes, J.F. Gonçalves & M.G.C. Resende. (2009) A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research 36:1, pages 92-109.
Crossref
Jens Czogalla & Andreas Fink. 2009. Learning and Intelligent Optimization. Learning and Intelligent Optimization 104 118 .
Jens Czogalla & Andreas Fink. 2009. Nature Inspired Cooperative Strategies for Optimization (NICSO 2008). Nature Inspired Cooperative Strategies for Optimization (NICSO 2008) 61 73 .
Vincent Van Peteghem & Mario Vanhoucke. 2009. Evolutionary Computation in Combinatorial Optimization. Evolutionary Computation in Combinatorial Optimization 85 96 .
Luong Duc Long & Ario Ohsato. (2008) Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management 26:6, pages 688-698.
Crossref
Haitao Li & Keith Womer. (2008) Modeling the supply chain configuration problem with resource constraints. International Journal of Project Management 26:6, pages 646-654.
Crossref
Khaled Moumene & Jacques A. Ferland. (2008) New representation to reduce the search space for the resource-constrained project scheduling problem. RAIRO - Operations Research 42:2, pages 215-228.
Crossref
Celso Tchao & Simone L. Martins. 2008. Learning and Intelligent Optimization. Learning and Intelligent Optimization 234 242 .
. 2008. Network Models and Optimization. Network Models and Optimization 419 476 .
Arif Volkan Vural & Burak Eksioglu. 2009. Encyclopedia of Optimization. Encyclopedia of Optimization 3704 3708 .
. 2008. Resource‐Constrained Project Scheduling. Resource‐Constrained Project Scheduling 279 301 .
Jörg Homberger. (2007) A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem. International Transactions in Operational Research 14:6, pages 565-589.
Crossref
Lin-Yu Tseng & Shih-Chieh Chen. (2006) A hybrid metaheuristic for the resource-constrained project scheduling problem. European Journal of Operational Research 175:2, pages 707-721.
Crossref
Rainer Kolisch & Sönke Hartmann. (2006) Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174:1, pages 23-37.
Crossref
Hsing-Pei Kao, Brian Wang, James Dong & Kuo-Cheng Ku. (2006) An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling. Computers in Industry 57:5, pages 379-397.
Crossref
Hong Zhang, C. M. Tam & Heng Li. (2006) Multimode Project Scheduling Based on Particle Swarm Optimization. Computer-Aided Civil and Infrastructure Engineering 21:2, pages 93-103.
Crossref
Selcuk Colak, Anurag Agarwal & Selcuk S. Erenguc. 2006. Perspectives in Modern Project Scheduling. Perspectives in Modern Project Scheduling 297 318 .
Hong Wang, Dan Lin & Minqiang Li. 2005. Advances in Natural Computation. Advances in Natural Computation 185 193 .
K. Bouleimen & H. Lecocq. (2003) A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149:2, pages 268-281.
Crossref
H?kan Lennerstad & Lars Lundberg. (2003) Chapter 2: Previous scheduling research. Electronic Notes in Discrete Mathematics 14, pages 15-34.
Crossref
Sönke Hartmann. (2002) A self‐adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics (NRL) 49:5, pages 433-448.
Crossref
R Kolisch & R Padman. (2001) An integrated survey of deterministic project scheduling. Omega 29:3, pages 249-272.
Crossref
Tonius Baar, Peter Brucker & Sigrid Knust. 1998. Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization. Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization 1 18 .
Dimitri Golenko-Ginzburg & Aharon Gonik. (1998) A heuristic for network project scheduling with random activity durations depending on the resource allocation. International Journal of Production Economics 55:2, pages 149-162.
Crossref
Michael L. Mcginnis. (1997) A heuristic methodology for sizing a large-scale system of constrained, reusable resources. Journal of Heuristics 2:4, pages 287-301.
Crossref
Wendi Tian & Erik Demeulemeester. (2010) Railway Scheduling Reduces the Expected Project Makespan. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.