221
Views
32
CrossRef citations to date
0
Altmetric
Original Articles

Lot size reorder point inventory model with controllable lead time and set-up cost

Pages 635-642 | Published online: 26 Nov 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Christoph H. Glock & Jörg M. Ries. (2013) Reducing lead time risk through multiple sourcing: the case of stochastic demand and variable lead time. International Journal of Production Research 51:1, pages 43-56.
Read now
Huaming Song, Hui Yang & Jianqiang Luo. (2010) Integrated inventory model with lot size, production rate and lead time interactions. International Journal of Management Science and Engineering Management 5:2, pages 141-148.
Read now
Tieh-Yu Huang & Ming-Feng Yang. (2008) Integrated inventory decision support system with backorders and controllable lead time. Journal of Information and Optimization Sciences 29:3, pages 513-522.
Read now
Kun-Shan Wu, Liang-Yuh Ouyang & Chia-Huei Ho. (2007) Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time. International Journal of Systems Science 38:4, pages 339-350.
Read now

Articles from other publishers (26)

Richa Nandra & Arunava Majumder. System reliability, setup cost reduction of sustainable manufacturing for shoes and its raw materials supply chain. System reliability, setup cost reduction of sustainable manufacturing for shoes and its raw materials supply chain.
Emre Berk, Onurcan Ayas & M. Ali Ülkü. (2023) Optimizing Process-Improvement Efforts for Supply Chain Operations under Disruptions: New Structural Results. Sustainability 15:17, pages 13117.
Crossref
R. Uthayakumar & B. Karthick. (2022) Analysis of several reduction strategies on a two-echelon sustainable supply chain model with triangular fuzzy demand. OPSEARCH 60:1, pages 393-419.
Crossref
Mario Fargnoli, Nicolas Haber & Massimo Tronci. (2022) Case Study Research to Foster the Optimization of Supply Chain Management through the PSS Approach. Sustainability 14:4, pages 2235.
Crossref
Monami Das Roy & Shib Sankar Sana. (2021) Multi-echelon green supply chain model with random defectives, remanufacturing and rework under setup cost reduction and variable transportation cost. Sādhanā 46:4.
Crossref
Monami Das Roy & Shib Sankar Sana. (2021) Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing. RAIRO - Operations Research 55, pages S1469-S1485.
Crossref
Sumon Sarkar, Bibhas Chandra Giri & Ashis Kumar Sarkar. (2020) A vendor–buyer inventory model with lot-size and production rate dependent lead time under time value of money. RAIRO - Operations Research 54:4, pages 961-979.
Crossref
Sunil Tiwari, Shib Sankar Sana & Sumon Sarkar. (2017) Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas 112:4, pages 1075-1099.
Crossref
M. Vijayashree & R. Uthayakumar. (2017) A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time. Journal of Industrial Engineering International 13:3, pages 393-416.
Crossref
R. Jamshidi, S.M.T. Fatemi Ghomi & B. Karimi. (2015) Flexible supply chain optimization with controllable lead time and shipping option. Applied Soft Computing 30, pages 26-35.
Crossref
Biswajit Sarkar, Buddhadev Mandal & Sumon Sarkar. (2015) Quality improvement and backorder price discount under controllable lead time in an inventory model. Journal of Manufacturing Systems 35, pages 26-36.
Crossref
Hua-Ming Song, Hui Yang & Alain Bensoussan. (2013) Optimizing production and inventory decisions in a supply chain with lot size, production rate and lead time interactions. Applied Mathematics and Computation 224, pages 150-165.
Crossref
DHARMENDRA YADAV, S. R. SINGH & RACHNA KUMARI. (2013) APPLICATION OF MINIMAX DISTRIBUTION FREE PROCEDURE AND CHEBYSHEV APPROACH IN MIXED INVENTORY MODEL INVOLVING REDUCIBLE LEAD-TIME AND SETUP COST WITH IMPRECISE DEMAND. Asia-Pacific Journal of Operational Research 30:04, pages 1350009.
Crossref
Sara Shahpouri, Parviz Fattahi, Ali Arkan & Kia Parsa. (2012) Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint. The International Journal of Advanced Manufacturing Technology 65:5-8, pages 657-666.
Crossref
Bingzhi Huang, Liangping Shi & Xin Zhou. (2012) Integrated inventory model with stochastic lead time and controllable variability for milk runs. Journal of Industrial and Management Optimization 8:3, pages 657-672.
Crossref
Christoph H. Glock. (2012) Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. International Journal of Production Economics 136:1, pages 37-44.
Crossref
Ali Arkan & Seyed Reza Hejazi. (2012) Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Computers & Industrial Engineering 62:1, pages 56-69.
Crossref
Wei-Min MA & Bing-Bing QIU. (2012) Distribution-Free Continuous Review Inventory Model with Controllable Lead Time and Setup Cost in the Presence of a Service Level Constraint. Mathematical Problems in Engineering 2012, pages 1-16.
Crossref
Hua-Ming Song, Hui Yang & Jian-Qiang Luo. (2011) Optimal Ordering Policy and Coordination Mechanism of a Supply Chain with Controllable Lead-Time-Dependent Demand Forecast. Mathematical Problems in Engineering 2011, pages 1-24.
Crossref
J.K. Jha & Kripa Shanker. (2009) Two-echelon supply chain inventory model with controllable lead time and service level constraint. Computers & Industrial Engineering 57:3, pages 1096-1104.
Crossref
Jong-Wuu Wu, Wen-Chuan Lee & Chia-Ling Lei. (2009) Optimal Inventory Policy Involving Ordering Cost Reduction, Back-Order Discounts, and Variable Lead Time Demand by Minimax Criterion. Mathematical Problems in Engineering 2009, pages 1-19.
Crossref
Ming-Cheng Lo. (2007) Decision Support System for the Integrated Inventory Model with General Distribution Demand. Information Technology Journal 6:7, pages 1069-1074.
Crossref
Yina Li, Xuejun Xu & Fei Ye. (2007) Research on Supply Chain Inventory Optimization and Benefit Coordination with Controllable Lead Time. Research on Supply Chain Inventory Optimization and Benefit Coordination with Controllable Lead Time.
Wen-Chuan Lee, Jong-Wuu Wu & Chia-Ling Lei. (2007) Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable. Applied Mathematics and Computation 189:1, pages 186-200.
Crossref
Hung-Chi Chang, Liang-Yuh Ouyang, Kun-Shan Wu & Chia-Huei Ho. (2006) Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research 170:2, pages 481-495.
Crossref
I. K. Moon & B. C. Cha. (2005) A continuous review inventory model with the controllable production rate of the manufacturer. International Transactions in Operational Research 12:2, pages 247-258.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.