223
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem

, &
Pages 77-93 | Received 30 Sep 2010, Accepted 08 Apr 2011, Published online: 20 May 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Nilgün İnce, Derya Deliktaş & İhsan Hakan Selvi. (2024) A comprehensive literature review of the flowshop group scheduling problems: systematic and bibliometric reviews. International Journal of Production Research 62:12, pages 4565-4594.
Read now
Xiangmin Guan, Xuejun Zhang, Jian Wei, Inseok Hwang, Yanbo Zhu & Kaiquan Cai. (2016) A strategic conflict avoidance approach based on cooperative coevolutionary with the dynamic grouping strategy. International Journal of Systems Science 47:9, pages 1995-2008.
Read now
Nantiwat Pholdee & Sujin Bureerat. (2016) Hybrid real-code ant colony optimisation for constrained mechanical design. International Journal of Systems Science 47:2, pages 474-491.
Read now
Rong-Hwa Huang, Chang-Lin Yang & Chun-Ting Hsu. (2015) Multi-objective two-stage multiprocessor flow shop scheduling – a subgroup particle swarm optimisation approach. International Journal of Systems Science 46:16, pages 3010-3018.
Read now
J.S. Neufeld, J.N.D. Gupta & U. Buscher. (2015) Minimising makespan in flowshop group scheduling with sequence-dependent family set-up times using inserted idle times. International Journal of Production Research 53:6, pages 1791-1806.
Read now
Kuo-Hsiung Wang, Cheng-Dar Liou & Ya-Lin Wang. (2014) Profit optimisation of the multiple-vacation machine repair problem using particle swarm optimisation. International Journal of Systems Science 45:8, pages 1769-1780.
Read now

Articles from other publishers (14)

Zi-Qi Zhang, Yan-Xuan Xu, Bin Qian, Rong Hu, Fang-Chun Wu & Ling Wang. (2024) An enhanced estimation of distribution algorithm with problem-specific knowledge for distributed no-wait flowshop group scheduling problems. Swarm and Evolutionary Computation 87, pages 101559.
Crossref
Yuting Wang, Yuyan Han, Dunwei Gong & Huan Li. (2023) A review of intelligent optimization for group scheduling problems in cellular manufacturing. Frontiers of Engineering Management 10:3, pages 406-426.
Crossref
Kongfu Hu, Lei Wang, Jingcao Cai & Long Cheng. (2023) An improved genetic algorithm with dynamic neighborhood search for job shop scheduling problem. Mathematical Biosciences and Engineering 20:9, pages 17407-17427.
Crossref
Alka Choudhary, Nitin Mahla & Dinesh C. Sharma. (2022) Cost Optimization of the Queueing System with Degrading Service Rate, Bernoulli Vacation, and a Regular Vacation After Fixed Services. International Journal of Applied and Computational Mathematics 8:3.
Crossref
Rui Zhang. (2021) Route planning model of rail transit network facing the railway freight transport deadline. International Journal of System Assurance Engineering and Management 12:4, pages 718-730.
Crossref
Shuaipeng Yuan, Tieke Li & Bailin Wang. (2020) A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times. Journal of Intelligent Manufacturing 32:2, pages 427-439.
Crossref
Shuaipeng Yuan, Tieke Li & Bailin Wang. (2020) A co-evolutionary genetic algorithm for the two-machine flow shop group scheduling problem with job-related blocking and transportation times. Expert Systems with Applications 152, pages 113360.
Crossref
Shih-Wei Lin & Kuo-Ching Ying. (2019) Makespan optimization in a no-wait flowline manufacturing cell with sequence-dependent family setup times. Computers & Industrial Engineering 128, pages 1-7.
Crossref
Maryam Mousavi, Hwa Jen Yap, Siti Nurmaya Musa, Farzad Tahriri & Siti Zawiah Md Dawal. (2017) Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization. PLOS ONE 12:3, pages e0169817.
Crossref
Janis S. Neufeld, Jatinder N.D. Gupta & Udo Buscher. (2016) A comprehensive review of flowshop group scheduling literature. Computers & Operations Research 70, pages 56-74.
Crossref
Cheng-Dar Liou & Yi-Chih Hsieh. (2015) A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times. International Journal of Production Economics 170, pages 258-267.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref
Rong-Hwa Huang, Shun-Chi Yu & Chen-Wei Kuo. (2014) Reentrant two-stage multiprocessor flow shop scheduling with due windows. The International Journal of Advanced Manufacturing Technology 71:5-8, pages 1263-1276.
Crossref
Rong-Hwa Huang & Shun-Chi Yu. (2013) Clarifying Cutting and Sewing Processes with Due Windows Using an Effective Ant Colony Optimization. Mathematical Problems in Engineering 2013, pages 1-12.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.