16
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Analytical determination of optimal TWK due-dates in a job shop

Pages 777-787 | Received 04 Apr 1984, Published online: 10 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Carla De Francesco & Bruno Viscolani. (1994) Optimal Lead Times and Service Rates in a Multiservice System with Bounded Resources. Journal of Information and Optimization Sciences 15:3, pages 359-371.
Read now

Articles from other publishers (10)

Jatinder N.D. Gupta, Karin Krüger, Volker Lauff, Frank Werner & Yuri N. Sotskov. (2002) Heuristics for hybrid flow shops with controllable processing times and assignable due dates. Computers & Operations Research 29:10, pages 1417-1439.
Crossref
Soroush H.M.. (1999) Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research 113:2, pages 450-468.
Crossref
T.C. EDWIN Cheng & Adam Janiak. 1993. Advances in Factories of the Future, CIM and Robotics. Advances in Factories of the Future, CIM and Robotics 257 264 .
T.C.E. Cheng. (1991) Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research 51:3, pages 348-353.
Crossref
T.C.E. Cheng & M.C. Gupta. (1989) Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38:2, pages 156-166.
Crossref
T.C.E. Cheng. (1988) Optimal common due-date with limited completion time deviation. Computers & Operations Research 15:2, pages 91-96.
Crossref
T.C.E. Cheng. (1987) Minimizing the maximum deviation of job completion time about a common due-date. Computers & Mathematics with Applications 14:4, pages 279-283.
Crossref
T.C.E. Cheng. (1987) Optimal due-date determination and sequencing with random processing times. Mathematical Modelling 9:8, pages 573-576.
Crossref
T.C.E. Cheng. (1986) Optimal slack due-date determination and sequencing. Engineering Costs and Production Economics 10:4, pages 305-309.
Crossref
T.C.E. Cheng. (1986) Optimal slack due-date determination and sequencing. Engineering Costs and Production Economics 10:1, pages 305-309.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.