Publication Cover
Journal of Quality Technology
A Quarterly Journal of Methods, Applications and Related Topics
Volume 10, 1978 - Issue 1
6
Views
54
CrossRef citations to date
0
Altmetric
Articles

Economically Optimal Determination of the Parameters of np-Control Charts

Pages 12-19 | Published online: 22 Feb 2018

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (25)

Sandeep & Arup Ranjan Mukhopadhyay. (2023) Optimal diagnosis interval for online quality control methods. Quality Engineering 0:0, pages 1-15.
Read now
Lupércio F. Bessegato, Roberto C. Quinino, Frederico R. B. Cruz & Augusto R. Pereira. (2023) An analysis of online quality control by attributes with an imperfect classification system and inspections with samples of size n. Communications in Statistics - Simulation and Computation 52:7, pages 2941-2966.
Read now
Aitin Saadatmelli, M. Bameni Moghadam, Asghar Seif & Alireza Faraz. (2019) Economic design of control charts with multiple assignable causes under Burr XII shock model. Communications in Statistics - Theory and Methods 48:3, pages 500-522.
Read now
S. H. Patil & D. T. Shirke. (2017) Economic design of variable sampling interval sign control chart. Journal of Industrial and Production Engineering 34:4, pages 253-260.
Read now
S. T. A. Niaki & B. Abbasi. (2008) Detection and classification mean-shifts in multi-attribute processes by artificial neural networks. International Journal of Production Research 46:11, pages 2945-2963.
Read now
Seyed Taghi Akhavan Niaki & Babak Abbasi. (2007) Skewness Reduction Approach in Multi-Attribute Process Monitoring. Communications in Statistics - Theory and Methods 36:12, pages 2313-2325.
Read now
JoelK. Jolayemi. (2002) Statistical design of np-charts with multiple control regions. International Journal of Production Research 40:11, pages 2591-2608.
Read now
William H. Woodall. (1997) Control Charts Based on Attribute Data: Bibliography and Review. Journal of Quality Technology 29:2, pages 172-183.
Read now
MohamadR. Nayebpour & WilliamH. Woodall. (1993) An Analysis of Taguchi's On-Line Quality-Monitoring Procedures for Attributes. Technometrics 35:1, pages 53-60.
Read now
ThomasP. McWilliams. (1992) COMMENTS ON LORENZEN AND VANCE (1986). Technometrics 34:2, pages 248-249.
Read now
Timothy S. Vaughan. (1992) Variable sampling interval np process control chart. Communications in Statistics - Theory and Methods 22:1, pages 147-167.
Read now
Timothy S. Vaughan & Michael H. Peters. (1991) Economic Design of Fraction Nonconforming Control Charts with Multiple State Changes. Journal of Quality Technology 23:1, pages 32-43.
Read now
LIE-FERN HSU & CHARLESS. TAPIERO. (1990) An economic model for determining the optimal quality and process control policy in a queue-like production system. International Journal of Production Research 28:8, pages 1447-1457.
Read now
HAUL. LEE & MEIRJ. ROSENBLATT. (1989) A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay. IIE Transactions 21:4, pages 368-375.
Read now
William H. Woodall. (1989) Quality Engineering in Production Systems. Journal of Quality Technology 21:4, pages 297-298.
Read now
Thomas P. McWilliams. (1989) Economic Control Chart Designs and the In-Control Time Distribution: A Sensitivity Study. Journal of Quality Technology 21:2, pages 103-110.
Read now
M. A. RAIM, R. S. LASHKARI & P. K. BANERJEE. (1988) JOINT ECONOMIC DESIGN OF MEAN AND VARIANCE CONTROL CHARTS. Engineering Optimization 14:1, pages 65-78.
Read now
HAUL. LEE & MEIRJ. ROSENBLATT. (1988) Economic Design And Control of Monitoring Mechanisms in Automated Production Systems. IIE Transactions 20:2, pages 201-209.
Read now
EdwardD. McDowell. (1987) The Economic Design of Sampling Control Strategies for a Class of Industrial Process. IIE Transactions 19:3, pages 289-295.
Read now
P. K. BANERJEE & M. A. RAHIM. (1987) THE ECONOMIC DESIGN OF CONTROL CHARTS: A RENEWAL THEORY APPROACH. Engineering Optimization 12:1, pages 63-73.
Read now
WilliamH. Woodall. (1986) Weaknesses of The Economic Design of Control Charts. Technometrics 28:4, pages 408-409.
Read now
MeirJ. Rosenblatt & HauL. Lee. (1986) Economic Production Cycles with Imperfect Production Processes. IIE Transactions 18:1, pages 48-55.
Read now
Douglas C. Montgomery. (1980) The Economic Design of Control Charts: A Review and Literature Survey. Journal of Quality Technology 12:2, pages 75-87.
Read now

Articles from other publishers (29)

Bara’ El-Atrash, Salah Haridy & Mohammad Shamsuzzaman. (2023) Designing an Economic EWMA Control Chart for Monitoring Attributes under Statistical Constraints. Designing an Economic EWMA Control Chart for Monitoring Attributes under Statistical Constraints.
Barry R. Cobb & Linda Li. (2019) Bayesian network model for quality control with categorical attribute data. Applied Soft Computing 84, pages 105746.
Crossref
Seyed Taghi Akhavan Niaki & Shirin Akbari Nasaji. (2011) A hybrid method of artificial neural networks and simulated annealing in monitoring auto-correlated multi-attribute processes. The International Journal of Advanced Manufacturing Technology 56:5-8, pages 777-788.
Crossref
Elisabeth Topalidou & Stelios Psarakis. (2009) Review of multinomial and multiattribute quality control charts. Quality and Reliability Engineering International 25:7, pages 773-804.
Crossref
S. H. Patil & R. N. Rattihalli. (2009) Economic Design of Moving Average Control Chart for Continued and Ceased Production Process. Economic Quality Control 24:1.
Crossref
A. Baki˙ Engi˙n. (2008) Determination of optimum economic inspection by economic control chart design and by machine efficiency estimation: An application in weaving industry. Simulation Modelling Practice and Theory 16:1, pages 147-170.
Crossref
Eugenio K. Epprecht & Adriana Leiras. (2007) Otimização conjunta de gráficos de X-barra - S ou X-barra - R: um procedimento de fácil implementação. Production 17:3, pages 520-535.
Crossref
Seyed Taghi Akhavan Niaki & Babak Abbasi. (2006) Bootstrap method approach in designing multi-attribute control charts. The International Journal of Advanced Manufacturing Technology 35:5-6, pages 434-442.
Crossref
Seyed Taghi Akhavan Niaki & Babak Abbasi. (2006) On the monitoring of multi-attributes high-quality production processes. Metrika 66:3, pages 373-388.
Crossref
Shib Sankar Sana, Suresh Kumar Goyal & Kripasindhu Chaudhuri. (2007) An imperfect production process in a volume flexible inventory model. International Journal of Production Economics 105:2, pages 548-559.
Crossref
Lloyd S. Nelson. 2004. Encyclopedia of Statistical Sciences. Encyclopedia of Statistical Sciences.
Lloyd S Nelson. 2004. Encyclopedia of Statistical Sciences. Encyclopedia of Statistical Sciences.
Hiroshi Ohta, Etsuko Kusukawa & Abdur Rahim. (2001) A CCC‐ r chart for high‐yield processes . Quality and Reliability Engineering International 17:6, pages 439-446.
Crossref
Wagner Borges, Linda Lee Ho & Osiris Turnes. (2001) An analysis of Taguchi's on‐line quality monitoring procedure for attributes with diagnosis errors. Applied Stochastic Models in Business and Industry 17:3, pages 261-276.
Crossref
Joel K. Jolayemi. (2000) An optimal design of multiattribute control charts for processes subject to a multiplicity of assignable causes. Applied Mathematics and Computation 114:2-3, pages 187-203.
Crossref
Bowon Kim. (1998) Contingency rules to control a production process subject to a single assignable cause. International Journal of Quality & Reliability Management 15:7, pages 679-693.
Crossref
James C. Benneyan. (1998) Statistical Quality Control Methods in Infection Control and Hospital Epidemiology, Part II: Chart Use, Statistical Properties, and Research Issues. Infection Control and Hospital Epidemiology 19:4, pages 265-283.
Crossref
David Birnbaum & James C. Benneyan. (2015) Statistical Quality Control Methods in Infection Control and Hospital Epidemiology, Part II: Chart Use, Statistical Properties, and Research Issues. Infection Control & Hospital Epidemiology 19:4, pages 265-283.
Crossref
Osiris Turnes. (1997) Grouping Economic Designs of Control Charts for Attributes and Closely Related Models. IFAC Proceedings Volumes 30:19, pages 589-594.
Crossref
T. P. McWilliams. 1997. Optimization in Quality Control. Optimization in Quality Control 197 211 .
B. M. Dabade & P. K. Ray. (1996) Quality engineering for continuous performance improvement in products and processes: A review and reflections. Quality and Reliability Engineering International 12:3, pages 173-189.
Crossref
C.S. Sung & Young Seok Ock. (1992) Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowed. International Journal of Production Economics 28:1, pages 85-94.
Crossref
Kun‐Jen Chung. (1992) An Efficient Procedure for the Economic Design of np‐Control Charts. International Journal of Quality & Reliability Management 9:4.
Crossref
Michael H. Peters. 1990. Cost Analysis and Estimating. Cost Analysis and Estimating 203 217 .
Elart von Collani. (1989) Economically optimalc- andnp-control charts. Metrika 36:1, pages 215-232.
Crossref
E. von Collani. (1988) A unified approach to optimal process control. Metrika 35:1, pages 145-159.
Crossref
M. Behl. (1985) Kostenoptimale Prüfpläne für die Laufende Kontrolle eines Qualitativen Merkmales. Metrika 32:1, pages 219-251.
Crossref
D. Sculli & K.M. Woo. (1985) Designing economic np control charts: A programmed simulation approach. Computers in Industry 6:3, pages 185-194.
Crossref
D Sculli & KM Woo. (1982) Designing np control charts. Omega 10:6, pages 679-687.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.